CSCS Slinger/Signaller study materials
CSCS Slinger/Signaller study resources

CSCS Slinger/Signaller flashcards

CSCS Slinger/Signaller · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

LOLER
Lifting Operations and Lifting Equipment Regulations 1998; require lifting operations to be planned, supervised, and carried out by competent persons, and equipment to be examined at statutory intervals.
PUWER
Provision and Use of Work Equipment Regulations 1998; require work equipment to be suitable, maintained, and inspected, and users to be trained.
Competent person
A person with sufficient theoretical and practical knowledge and experience to perform the required duties safely, such as planning lifts or examining equipment.
RIDDOR
Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013; require reporting of dangerous occurrences including lifting equipment failure.
Appointed person
The person with overall responsibility for planning a lifting operation, including selecting equipment and personnel and preparing the lift plan.
Crane supervisor
The person who implements the lift plan on site, directs the lifting team, and has authority to stop the operation if conditions change or become unsafe.
Slinger/signaller
The person responsible for attaching and detaching loads, guiding the load, and communicating signals to the crane operator.
Crane operator
The person responsible for operating the crane safely in accordance with the lift plan and signals received, and for stopping if a signal is unclear or unsafe.
Exclusion zone
An area beneath and around the load path from which persons are excluded to prevent injury from falling loads or moving equipment.
Risk assessment
A systematic process of identifying hazards, evaluating risks, and implementing control measures to reduce risk to an acceptable level.
PPE
Personal protective equipment; includes hard hats, high-visibility clothing, and safety footwear required for personnel involved in lifting operations.
Overhead power lines
Electrical hazards that must be identified and either isolated or kept at a safe distance from lifting equipment to prevent electrocution.
Safe working load
The maximum load that a sling or lifting accessory may lift under specified conditions; it must never be exceeded.
Webbing sling inspection
Check for cuts, tears, abrasion, chemical damage, and damaged labels; remove from service if any defect is found.
Chain sling inspection
Check for stretched links, cracks, gouges, and wear; wear exceeding 10% of original link diameter is grounds for rejection.
Wire rope sling inspection
Check for broken wires, corrosion, kinks, and bird-caging; the number of broken wires in a given length determines rejection.
Shackle
A rated connector marked with its SWL; screw pin shackles must be fully tightened and moused if there is a risk of the pin unscrewing.
Sling angle effect
As the angle between sling legs and the horizontal decreases, the tension in each leg increases for the same load, reducing effective capacity.
Centre of gravity
The point at which the load's weight is considered to act; it must be directly below the crane hook to prevent swinging or tilting.
Tag line
A rope attached to a load to control its rotation and movement during lifting, especially for long or awkward loads.
Basket hitch
A sling configuration where the sling passes under the load and both ends attach to the hook; SWL is typically twice that of a single leg if legs are vertical.
Choker hitch
A sling configuration where the sling passes around the load and through itself; SWL is reduced, often to 80% of the single-leg capacity.
Emergency stop signal
Given by extending one arm horizontally and moving it rapidly side to side at shoulder height; anyone may give this signal.
Raise load signal
Given by pointing the forearm upwards with the hand open and moving it in a small circle.
Lower load signal
Given by pointing the forearm downwards with the hand open and moving it in a small circle.
Dog everything signal
Given by holding one arm horizontally and moving the other hand across it in a cutting motion; means stop.
Radio communication
Must use clear, standard phrases; the operator must repeat back critical instructions to confirm understanding.
Lifting plan
A document prepared by the appointed person that includes load weight, rigging, crane position, load path, personnel roles, and contingency measures.
Load weight verification
The load weight must be confirmed from documentation or calculation; if unknown, it must be determined by a competent person before lifting.
Crane capacity check
The crane's capacity must be checked against the load chart for the specific radius, boom length, and configuration; the load must never exceed rated capacity.
Site coordination
Organising the site to provide safe access, adequate space, and exclusion zones, and ensuring coordination between all personnel involved in the lift.
Pre-lift briefing
A meeting before the lift to communicate the lift plan, roles, and responsibilities to all involved personnel.