Site Preparation

  • Site strip depth is set by the depth of topsoil and unsuitable material identified in the ground investigation, not by a fixed rule; record actual strip depths against the design section.

  • Topsoil and subsoil are stripped and stockpiled separately; mixing them downgrades the subsoil and reduces the reuse value of the topsoil.

  • Stockpile height and side slopes are governed by the material's angle of repose; a stockpile is a temporary structure and must be stable and drained.

  • Formation level is proved by proof rolling or plate bearing testing before placing fill; soft spots are excavated and replaced, not capped over.

  • Haul routes and compaction plant movements are planned before stripping so that the subgrade is not rutted by uncontrolled traffic.

  • Drainage is installed ahead of earthworks: cut-off drains divert run-on, and temporary falls keep the formation free of standing water.

  • Setting out controls (batter rails, pegs, level datum) are checked against the drawings before bulk earthworks begin, and rechecked after each pass.

  • Service strike avoidance: CAT scan and trial holes confirm buried services before any blade or ripper penetrates the surface.

Quick reference

Ground Conditions and Soil Handling

  • Material behaviour is governed by moisture content relative to the plastic limit; cohesive soils become unworkable and unstable above the plastic limit.

  • Cohesionless sands and gravels drain freely but lose bearing capacity when saturated and are prone to piping and collapse in excavations.

  • Rock strength and fracture spacing determine whether ripping is viable; closely spaced joints allow ripping where massive rock requires blasting.

  • Bulking factor: excavated volume exceeds in-situ volume; a typical bulking factor of 1.2 to 1.4 applies to many soils and must be allowed for in haul and stockpile planning.

  • Compaction is achieved by applying the specified layer thickness and the required number of passes with the correct plant; layer thickness is reduced for cohesive soils.

  • Silt and organic soils have low bearing capacity and high compressibility; they are unsuitable as formation and are typically removed or treated.

  • Peat and soft alluvium are identified by probing and are excluded from fill; they may need excavation to a designed depth or ground improvement.

  • Trafficking of wet cohesive soils causes remoulding and loss of strength; limit plant movements and use low ground pressure machines on weak ground.

Quick reference

Machine Types, Components and Pre-Use Inspection

  • A bulldozer is a tracked or wheeled machine with a front blade for pushing; a tracked loader differs by using a bucket on lift arms rather than a push blade.

  • Key dozer components: undercarriage (tracks, rollers, idlers, sprockets), blade and push arms, hydraulic cylinders and hoses, ripper, ROPS/FOPS cab, and the engine and transmission.

  • Pre-use inspection items: track tension and shoe condition, fluid levels and leaks, hydraulic hose condition, blade and cutting edge wear, seat belt and ROPS integrity, lights, horn, and fire extinguisher.

  • Track tension is checked against the manufacturer's specification for the ground conditions; too loose causes derailment, too tight accelerates wear.

  • Cutting edge and end bit wear is measured against the manufacturer's wear limit; worn edges increase penetration resistance and fuel consumption.

  • ROPS and FOPS are certified structures; any modification, welding or damage requires assessment by a competent person before the machine is used.

  • Defects found at pre-use inspection are recorded, reported and the machine is isolated with a lockout tag if the defect affects safe operation.

  • Daily checks are recorded on a checklist signed by the operator; a machine is not operated if a defect is not cleared by a competent person.

Quick reference

Safe Operation

  • Seat belt is worn at all times when the machine is moving or working, including on ROPS-equipped machines, because rollover protection only works with restraint.

  • Travel on gradients: dozers travel up and down the slope, not across it, and the blade is kept low and close to the ground.

  • Blade is lowered to the ground before the operator leaves the seat, and the machine is parked on level ground with the transmission in neutral and brakes applied.

  • No passengers are carried unless a designated seat with restraint is fitted; riding on the blade, tracks or drawbar is prohibited.

  • Before reversing, the operator checks all-round visibility and uses the horn; where visibility is restricted, a trained banksman directs the movement.

  • Hydraulic systems are depressurised before any hose or component is disconnected; trapped pressure causes injection injuries and sudden movement.

  • Operating near the edge of an excavation or embankment requires a defined stand-off distance based on the machine weight and ground conditions.

  • Machine is isolated and keys removed when left unattended; unauthorised operation is prevented by lockout procedures.

Quick reference

Stability and Machine Capability

  • Stability is governed by the centre of gravity relative to the machine's track or wheel base; raising the blade, ripper or load raises the centre of gravity and reduces stability.

  • Safe working gradient is set by the manufacturer and by ground conditions; the machine's tipping line is not the same as its safe operating limit.

  • On side slopes, the machine's lateral stability is reduced; dozers are not worked across slopes steeper than the manufacturer's limit.

  • Drawbar pull is limited by track grip, which depends on ground conditions and machine weight; pushing beyond traction causes track slip and loss of control.

  • Blade capacity and push distance determine productivity; long pushes with large blade loads reduce output per hour and increase track wear.

  • Ripper performance depends on machine weight and horsepower; a single shank is used for tough, massive material and multiple shanks for easier ground.

  • Load charts and rated capacities in the operator's manual define the machine's limits; these are not exceeded even for short moves.

  • Ground bearing capacity must support the machine's ground pressure; low ground pressure tracks reduce sinkage on soft ground.

Quick reference

Hazards, Exclusion Zones and Working Near Others

  • Exclusion zone radius is set so that no person is within the machine's working radius plus a margin for blade swing, spillage and unexpected movement.

  • A banksman or signaller is used when the operator cannot see the full working area or when reversing near people, plant or structures.

  • Pedestrian and plant routes are segregated; where segregation is not possible, a controlled crossing point with a signaller is used.

  • Overhead power lines: a defined safe clearance distance is maintained, and where it cannot be met, the line is isolated or goal posts and barriers are installed.

  • Buried services are located and marked before work; a permit-to-dig and a hand-dig margin around the marked service are used.

  • Blind spots around a dozer include the area behind the machine and the near side of the blade; the operator confirms the area is clear before moving.

  • Working near edges, trenches and excavations requires a barrier and a stand-off distance that accounts for surcharge loading and slope stability.

  • Communication: agreed hand signals or radio protocol between operator and banksman are confirmed before work starts and when the banksman changes.

Quick reference

Attachments

  • Blade types: straight blade for bulk pushing, universal blade with angled wings for carrying capacity, and angle blade for side casting and ditching.

  • A ripper is mounted on the rear drawbar; single-shank rippers penetrate tougher material and multi-shank rippers cover more width in easier ground.

  • Quick-hitch and pin-on attachment systems must be correctly engaged and locked; a visual check confirms the locking pins are fully seated.

  • Attachment changes are carried out on level, firm ground with the engine off and the attachment lowered and supported.

  • A winch attachment requires a rated rope, a functioning brake and a defined safe working load; the operator stays clear of the rope line.

  • Blade tilt and angle cylinders are controlled hydraulically; the attachment is not used as a jack or a crane unless rated and configured for it.

  • Worn cutting edges, end bits and ripper tips are replaced at the manufacturer's wear limit; worn tips reduce penetration and increase load on the machine.

  • Attachment weight affects stability and machine balance; the combination of blade, ripper and counterweight is checked against the machine's rated configuration.

Quick reference

Dozing and Earthmoving Techniques

  • Slot dozing: parallel cuts with retained side walls reduce spillage and improve blade load retention over longer pushes.

  • Downhill dozing increases blade load and productivity because gravity assists the push; uphill dozing reduces load and output.

  • Push loading: a dozer pushes a scraper during its loading run; the push is applied squarely to the scraper's push block and stops when the scraper is loaded.

  • Cut and fill balance is planned so that haul distances are minimised; the mass haul diagram shows where material moves and in what quantity.

  • Layer placement: fill is placed in horizontal layers of the specified thickness, each compacted to the specified density before the next layer.

  • Batter trimming is done from the top down with the blade angled; the operator keeps the machine on stable ground and does not undercut the batter.

  • Stripping and stockpiling: topsoil is pushed to the stockpile boundary and shaped, not pushed over the edge of the site.

  • Production estimate: output depends on blade load, cycle time and efficiency; reducing cycle time by shorter pushes and better turnaround raises output.

Quick reference

Maintenance, Refuelling and Defect Reporting

  • Maintenance is carried out with the engine off, the blade and ripper lowered to the ground, and the hydraulics depressurised.

  • Refuelling is done with the engine off, no ignition sources nearby, and a drip tray or bund in place; spill kits are available at the fuelling point.

  • Fuel and oil are stored in bunded containers with capacity for at least 110% of the largest container; drainage is controlled.

  • Defect reporting: every defect is recorded with date, machine, description and reporter, and the machine is tagged out until the defect is cleared.

  • Waste oil, filters and used lubricants are segregated and disposed of through licensed waste contractors with waste transfer notes.

  • Greasing and track adjustment are carried out at the specified intervals; over-greasing and incorrect track tension both cause premature wear.

  • Battery and electrical maintenance: the battery is isolated before work, and jump-starting follows the manufacturer's procedure to protect the electrical system.

  • Records of maintenance, inspections and repairs are retained and available for audit; unrecorded repairs are treated as unverified.

Quick reference

Environmental Controls

  • Dust suppression is applied at stripping, loading, haul routes and stockpiles; water bowsers and wheel washes are the primary controls.

  • Stockpiles are located away from watercourses and site boundaries, with silt fencing or bunds to intercept runoff.

  • Silt-laden water is not discharged to a watercourse; it is settled or treated before discharge under the site's permit conditions.

  • Noise controls include machine selection, maintenance of silencers, restricting working hours and using acoustic barriers where receptors are close.

  • Spill response: stop the source, contain with absorbent or bunding, prevent entry to drains and watercourses, and report the spill.

  • Protected species, trees and hedgerows are identified before works; exclusion fencing protects root protection areas and habitats.

  • Waste hierarchy is applied to excavated material: reduce, reuse on site, recycle, then dispose; arisings are classified before off-site disposal.

  • Fuel and chemical storage is bunded and sited away from drains; refuelling is not carried out within the specified distance of a watercourse.

Quick reference

Dust, Noise and Spills

  • Dust is controlled by dampening, reduced drop heights, sheeting loads and limiting vehicle speeds on haul roads; visible dust plumes indicate a control failure.

  • Noise at the receptor is reduced by distance, barriers and machine maintenance; reversing alarms and horns are still required for safety.

  • Spill kit contents: absorbent granules or pads, booms, drain seals, gloves, bags and a means of disposal; the kit is checked and restocked.

  • Spill reporting: report to the site supervisor immediately, record the volume, substance and location, and notify the regulator where the permit requires.

  • A spill entering a drain or watercourse is a reportable incident; the drain is sealed and the material recovered before flushing.

  • Refuelling spill prevention: use a drip tray, do not overfill, secure the nozzle and keep the hose off the ground when not in use.

  • Dust from silica-containing materials is a health hazard; water suppression and appropriate respiratory protection are used where dust cannot be eliminated.

  • Monitoring records for dust, noise and spill events are kept and reviewed; repeated events trigger a review of controls.

Quick reference

Environmental Controls

  • Machine selection reduces emissions and noise: modern engines with after-treatment and correct maintenance lower particulate and NOx output.

  • Idling is limited; engines are switched off when the machine is not working to reduce fuel use, noise and emissions.

  • Hydraulic oil and fuel leaks are repaired promptly; a leak is a defect and is reported, not topped up and ignored.

  • Washing plant before leaving site prevents the spread of invasive species and mud onto the public highway.

  • Site drainage is separated into clean and dirty water; dirty water is not discharged without treatment and permission.

  • Waste segregation on site: separate skips for general waste, metal, and hazardous waste; contaminated soils are classified and handled separately.

  • Environmental incidents are recorded and investigated; corrective actions are tracked to completion.

  • Working near watercourses requires a buffer zone and a pollution prevention plan; plant is not operated in the watercourse without a permit.

Quick reference

Ground Conditions and Soil Handling

  • Moisture condition value and plasticity index are used to assess whether a cohesive soil is suitable for compaction at the specified density.

  • Compaction plant is matched to the soil: smooth drum rollers for granular, sheepsfoot for cohesive, and heavy pneumatic tyred rollers for both.

  • Layer thickness is set by the specification and verified by testing; thicker layers reduce the density achieved at depth.

  • Borrow pits and imported fill are approved and tested before use; material that does not meet the specification is rejected at the gate.

  • Groundwater is controlled by cut-off drains, sumps and pumping; the formation is kept dry and the water is discharged under a permit.

  • Frozen, organic or contaminated material is excluded from structural fill; each is identified by testing and handled under the relevant plan.

  • Ripping and ripping depth are trialled on site to confirm the achievable depth and the plant required before bulk ripping begins.

  • Haul road construction uses suitable granular material with drainage; soft spots are repaired before they propagate and stop the haul.

Quick reference

Safe Operation

  • Start-up sequence: walk-around check complete, seat belt on, controls in neutral, park brake on, then start; the blade is raised clear before moving.

  • The operator keeps the blade low when travelling; a raised blade reduces stability and restricts forward visibility.

  • On a slope, the machine is not turned on the gradient; the turn is made on level ground at the top or bottom of the slope.

  • If the machine stalls on a gradient, the blade is lowered, the brake applied, and the machine is restarted or recovered under a plan; rolling back is prevented.

  • Working in confined areas: the machine's turning circle and blade swing are checked against the available space before entering.

  • Weather and visibility: work stops or is restricted when visibility, wind or ground conditions make operation unsafe; the decision is recorded.

  • Fatigue management: operating hours and breaks are planned; a fatigued operator is a hazard and is not permitted to continue.

  • Emergency stop and isolation procedures are known to the operator and tested at the start of the shift where the machine is so fitted.

Quick reference

Attachments

  • Blade pitch is adjusted to the material: a more aggressive pitch increases penetration in hard ground and increases load in loose material.

  • Angle blade offsets the blade to cast material to one side; it is used for ditching and side casting and reduces the need to turn the machine.

  • A tilt cylinder allows the blade to cut a grade or a camber; the tilt is set before the pass and checked against the level datum.

  • Ripper shank angle and depth are set for the material; too deep a setting stalls the machine and overloads the shank.

  • Attachment hydraulic hoses are checked for chafing, leaks and correct routing; a burst hose on a raised attachment causes a sudden drop.

  • Attachment pins and retainers are checked after every change and at pre-use inspection; a missing retainer allows the pin to walk out under load.

  • A dozer blade is not a lifting device; lifting is done only with a rated attachment and a lifting plan.

  • Attachment storage: blades, rippers and edges are stored on firm ground, secured against falling, and away from traffic routes.

Quick reference

Hazards, Exclusion Zones and Working Near Others

  • The exclusion zone is marked physically (barriers, tape, cones) and not by verbal instruction alone; the zone is re-established after each shift.

  • Swing radius of the machine plus the blade width defines the minimum zone; the zone is larger where the ground is soft or the machine is on a slope.

  • Plant-to-plant separation: a minimum gap is maintained between machines; dozers working in echelon keep a gap that prevents blade contact.

  • Working near structures: a survey and condition survey are completed before work, and vibration and ground movement are monitored where required.

  • Public protection: fencing, signage and banksmen protect the boundary; the public are not permitted within the site exclusion zone.

  • Night working requires lighting that illuminates the working area without dazzling the operator or neighbouring premises.

  • Emergency arrangements: first aid, rescue from a rolled machine and the emergency contact are briefed before work begins.

  • Near misses are reported and investigated in the same way as incidents; the findings feed back into the exclusion zone and method.

Quick reference

Maintenance, Refuelling and Defect Reporting

  • Lockout/tagout is applied before maintenance on the blade, ripper or hydraulic system; the attachment is lowered and blocked if work is under it.

  • Refuelling point is sited on impermeable ground with a bund and a spill kit; the nozzle is bonded and the tank is earthed where required.

  • Fuel consumption is monitored as a maintenance indicator; a sudden rise can indicate a fault, poor track condition or incorrect operation.

  • Defect categories: safety-critical defects stop the machine immediately; other defects are scheduled and recorded with a target repair date.

  • Repair records include the part, the reason, the person and the date; the machine is not returned to service until the repair is verified.

  • Hydraulic oil sampling and filter changes follow the manufacturer's interval; contaminated oil causes pump and cylinder damage.

  • Undercarriage wear is measured (track pitch, roller wear, sprocket teeth) and compared with the wear limits in the manual.

  • Pre-use inspection is repeated after any repair, attachment change or long shutdown before the machine returns to work.

Quick reference

Machine Types, Components and Pre-Use Inspection

  • Tracked dozers are classified by weight and blade type; the undercarriage type (standard, low ground pressure, wide track) is selected for the ground conditions.

  • A low ground pressure undercarriage reduces ground pressure and sinkage on soft ground but increases wear and reduces travel speed.

  • The final drive and steering clutches transmit power to the tracks; steering on a tracked machine is by braking or declutching one track.

  • The hydraulic system includes the pump, control valves, cylinders and reservoir; the reservoir level and filter condition are checked at pre-use inspection.

  • Cooling system: radiator fins are cleaned of dust and debris, and the coolant level is checked cold; overheating on dusty sites is common.

  • The ROPS cab is fitted with a seat belt, and the cab glass and mirrors are clean and undamaged for all-round visibility.

  • Fire extinguisher is rated for the machine's fuel and hydraulic oil and is within its service date; the operator knows how to use it.

  • Pre-use inspection is recorded before the first use of the shift and after any event that could have caused damage.

Quick reference

Dozing and Earthmoving Techniques

  • Blade loading is maximised by keeping the cut shallow and the load rolling in front of the blade rather than spilling at the sides.

  • Return travel is done in reverse with the blade raised slightly, or by reversing along the cut; the fastest safe return raises cycle output.

  • Spreading fill: the blade is used to spread in thin layers, and the machine works from the placed material outward so that the edge is not overrun.

  • Grade control: a laser or GPS system is used for fine grading; the operator checks the displayed grade against the level datum at intervals.

  • Ditching with an angle blade: the blade is offset and tilted to cut the ditch section in passes, with the machine travelling along the ditch line.

  • Compaction of fill is not achieved by the dozer's tracks alone; the specified roller is used, and the dozer only spreads and levels.

  • Working in a cut: the cut face is battered to a stable slope and the machine works from the top of the cut down, not under an overhang.

  • Production is measured against the planned output; a shortfall is investigated for plant, ground or method causes rather than accepted.

Quick reference

Stability and Machine Capability

  • Ground pressure = machine weight divided by total track contact area; it is compared with the ground's bearing capacity before entering soft ground.

  • A dozer's rated drawbar pull is reduced on soft or slippery ground; track slip indicates the traction limit has been reached.

  • The tipping line on a slope is reached when the centre of gravity passes outside the track base; the machine is operated well inside this limit.

  • Loads on the blade increase the overturning moment; a full blade on a downhill push is more stable than the same blade pushed uphill.

  • Ripper penetration adds a rearward and downward force; the machine's balance changes and the blade is kept low as a counterweight.

  • Machine weight includes the blade, ripper and full tanks; the operating weight in the manual is the basis for stability and ground pressure.

  • Attachments and counterweights change the centre of gravity; the configuration is checked against the manual before use.

  • Wind loading on a large blade is significant; the machine is parked with the blade lowered and, where specified, facing into the wind.

Quick reference

Site Preparation

  • Site clearance removes vegetation, obstructions and debris before stripping; cleared material is segregated and disposed of under the waste plan.

  • Topsoil stockpile locations are set away from traffic routes and drainage, with a maximum height set by stability and the need to avoid compaction.

  • Haul road gradients are limited by the plant's capability and by safety; steep gradients reduce payload and increase brake wear.

  • Formation is protected from water by falls and temporary drainage; standing water softens the formation and requires rework.

  • Setting-out tolerances for earthworks are defined in the specification; the dozer operator works to the pegs and checks the grade.

  • Buried services are marked with a permit-to-dig and a hand-dig margin; the dozer is not used to excavate within the margin.

  • Site boundaries and protected areas are fenced before plant arrives; the fencing is maintained for the duration of the works.

  • Records of stripping depths, stockpile volumes and formation levels are kept for measurement and for the earthworks quality record.

Quick reference

Environmental Controls

  • Dust and noise monitoring results are compared with the permit limits; an exceedance triggers a review of controls and a record of the action taken.

  • Water used for dust suppression is drawn and discharged under the site's water permit; abstraction limits are respected.

  • Spill kits are located at refuelling points and at the works face; their contents are checked monthly and restocked after use.

  • Contaminated soil is tested and classified before reuse or disposal; the classification determines the permitted disposal route.

  • Fuel and oil storage bunds are inspected for damage and for accumulated rainwater, which is removed without allowing oil to escape.

  • Environmental incidents are reported to the regulator where the permit or legislation requires; the report is made within the specified time.

  • Site lighting is directed to avoid light spill on neighbouring premises and on ecological receptors.

  • Waste transfer notes and disposal records are retained and reconciled against the waste produced on site.

Quick reference

Hazards, Exclusion Zones and Working Near Others

  • A dozer's blind spots are largest behind and to the near side; the operator confirms the area is clear before reversing and uses the horn.

  • Overhead line clearance distances are set by the network operator; goal posts and barriers mark the limit of approach.

  • Excavation edges are protected by a barrier set back from the edge by a distance that accounts for surcharge and slope stability.

  • Working on a slope near others requires an exclusion zone downslope, because rolling material and the machine can travel downhill.

  • Plant and pedestrian crossings are marked and controlled; pedestrians do not cross a live haul route without a signaller.

  • Third-party plant on site is briefed on the site rules, the exclusion zones and the communication protocol before starting work.

  • Emergency access routes are kept clear of spoil, plant and materials at all times.

  • Near-miss reporting is encouraged and reviewed at the daily briefing; the findings are used to adjust the exclusion zones.

Quick reference

Ground Conditions and Soil Handling

  • Soil classification for earthworks follows the specification's categories (e.g. acceptable, unacceptable, contaminated); each category has a defined handling route.

  • The moisture content of fill is checked against the specification's range; too dry or too wet material is not compacted to the required density.

  • Compaction testing (e.g. nuclear density or plate bearing) is carried out at the specified frequency and the results recorded against the layer.

  • Ripping trials establish the achievable depth and the plant needed; the trial result is recorded and used to plan the bulk work.

  • Groundwater and surface water are kept separate; dirty water is settled or treated before discharge.

  • Soft spots are proved by probing and excavated to firm ground; the excavation is backfilled with suitable material in compacted layers.

  • Frozen material is not placed in fill; it thaws and causes settlement, and it is excluded by the specification.

  • Stockpiled material is protected from contamination and from reworking by traffic; the stockpile is shaped and drained.

Quick reference

Machine Types, Components and Pre-Use Inspection

  • The undercarriage is the highest-wear assembly on a tracked dozer; track tension, shoe wear and roller condition are checked at every pre-use inspection.

  • Track tension is adjusted by greasing or releasing the track adjuster; the correct tension is measured as a sag over a set length of track.

  • The cutting edge and end bits are wear items; they are replaced when worn to the manufacturer's limit, and the bolts are checked for tightness.

  • The blade and push arms are checked for cracks and distortion; cracks are repaired by a competent welder to the manufacturer's procedure.

  • Hydraulic hoses are checked for chafing, bulging and leaks; a hose that has failed is replaced, not repaired with tape.

  • The seat, seat belt and restraint are checked for condition; a damaged seat belt is replaced before the machine is used.

  • Lights, horn, reversing alarm and beacon are tested at pre-use inspection; failed safety devices stop the machine.

  • Fluid levels (engine oil, coolant, hydraulic oil, fuel) are checked and any unexplained loss is investigated as a possible leak.

Quick reference

Dozing and Earthmoving Techniques

  • Slot dozing: successive parallel cuts leave a wall of material at the blade sides, which reduces spillage and increases the load carried.

  • Downhill dozing increases the load the blade can push; the gradient is within the machine's safe working limit and the return is uphill.

  • Push loading a scraper: the dozer contacts the scraper's push block squarely and stops pushing when the scraper signals or the bowl is full.

  • Spreading and levelling: the blade is used in reverse for back-blading to leave a clean surface, and forward for placing material.

  • Batter formation: the batter is cut from the top down, and the machine stays on stable ground with the blade angled to trim the face.

  • Haul and return routes are planned to minimise turning and to keep the dozer on firm ground; the shortest safe cycle raises output.

  • Grade is checked regularly against the level datum; a dozer can cut a grade with the blade tilt and the machine's attitude.

  • Production is recorded (volume moved, hours worked) and compared with the plan; the cause of any shortfall is investigated.

Quick reference

Safe Operation

  • The operator is trained and authorised for the specific machine type; authorisation is recorded and checked before the operator starts work.

  • The seat belt is worn whenever the machine is moving; ROPS protects only when the operator is restrained inside the structure.

  • The machine is not operated with a defective safety device (horn, alarm, lights, seat belt); the defect is reported and the machine is stopped.

  • Before moving, the operator checks the area around the machine, including blind spots, and confirms the route is clear.

  • The blade is kept low when travelling; a raised blade restricts visibility and reduces stability.

  • On a gradient, the machine travels up and down the slope, not across it, and turns are made on level ground.

  • The machine is parked on level ground with the blade and ripper lowered, the park brake applied and the keys removed.

  • Communication with a banksman uses agreed signals; if communication is lost, the operator stops the machine until it is restored.

Quick reference

Maintenance, Refuelling and Defect Reporting

  • Lockout/tagout is applied before maintenance; the key is held by the person doing the work and the tag records the reason and the person.

  • The blade and ripper are lowered to the ground and, where work is under them, blocked with rated stands before anyone works beneath.

  • Refuelling is carried out with the engine off and no ignition sources; the nozzle is earthed and a drip tray is used.

  • Fuel storage is bunded to at least 110% of the largest container and sited away from drains and watercourses.

  • Defects are recorded on the machine's defect log and reported to the supervisor; safety-critical defects stop the machine immediately.

  • The machine is tagged out and isolated until a defect is repaired and the repair is verified by a competent person.

  • Used oil, filters and batteries are segregated as hazardous waste and disposed of through licensed contractors with transfer notes.

  • Maintenance and repair records are retained and available for audit; the machine's service history is part of its safety record.

Quick reference

Stability and Machine Capability

  • Ground pressure is the machine weight divided by the track contact area; it is compared with the ground's bearing capacity before entering soft ground.

  • A low ground pressure undercarriage spreads the weight over a larger area, reducing sinkage on soft ground.

  • The centre of gravity rises when the blade or ripper is raised; stability is reduced and the machine is more prone to overturning.

  • On a side slope, lateral stability is reduced; the machine is not worked across a slope steeper than the manufacturer's limit.

  • Drawbar pull is limited by traction; track slip indicates the limit has been reached and pushing harder causes loss of control.

  • A full blade on a downhill push is more stable than the same load pushed uphill, because the load acts toward the machine's base.

  • The machine's operating weight includes the blade, ripper and full tanks; this is the basis for stability and ground pressure calculations.

  • Loads and attachments are checked against the manual's rated configuration before use; the machine is not operated outside its rating.

Quick reference

Environmental Controls

  • Dust suppression is applied at the source: stripping, loading, haul routes and stockpiles; water bowsers and wheel washes are the primary controls.

  • Stockpiles are sited away from watercourses and boundaries, with silt fencing or bunds to intercept runoff.

  • Silt-laden water is settled or treated before discharge; the discharge is made under the site's permit conditions.

  • Noise is controlled by machine selection, maintenance of silencers, restricted working hours and acoustic barriers where receptors are close.

  • Spill response: stop the source, contain with absorbent or bunding, prevent entry to drains and watercourses, and report the spill.

  • Protected species, trees and hedgerows are identified before works; exclusion fencing protects root protection areas and habitats.

  • The waste hierarchy is applied to excavated material: reduce, reuse on site, recycle, then dispose; arisings are classified before off-site disposal.

  • Fuel and chemical storage is bunded and sited away from drains; refuelling is not carried out within the specified distance of a watercourse.

Quick reference

Dust, Noise and Spills

  • Dust is controlled by dampening, reduced drop heights, sheeting loads and limiting vehicle speeds on haul roads; a visible plume indicates a control failure.

  • Noise at the receptor is reduced by distance, barriers and machine maintenance; reversing alarms and horns are still required for safety.

  • A spill kit contains absorbent granules or pads, booms, drain seals, gloves, bags and a means of disposal; it is checked and restocked.

  • A spill is reported to the supervisor immediately, with the volume, substance and location recorded; the regulator is notified where the permit requires.

  • A spill entering a drain or watercourse is a reportable incident; the drain is sealed and the material recovered before flushing.

  • Refuelling spill prevention: use a drip tray, do not overfill, secure the nozzle and keep the hose off the ground when not in use.

  • Dust from silica-containing materials is a health hazard; water suppression and respiratory protection are used where dust cannot be eliminated.

  • Dust, noise and spill monitoring records are kept and reviewed; repeated events trigger a review of controls.

Quick reference

Site Preparation

  • Site clearance removes vegetation, obstructions and debris before stripping; cleared material is segregated and disposed of under the waste plan.

  • Topsoil stockpiles are sited away from traffic routes and drainage, with a maximum height set by stability and to avoid compaction.

  • Haul road gradients are limited by the plant's capability and by safety; steep gradients reduce payload and increase brake wear.

  • The formation is protected from water by falls and temporary drainage; standing water softens the formation and requires rework.

  • Setting-out tolerances for earthworks are defined in the specification; the operator works to the pegs and checks the grade.

  • Buried services are marked with a permit-to-dig and a hand-dig margin; the dozer is not used to excavate within the margin.

  • Site boundaries and protected areas are fenced before plant arrives, and the fencing is maintained for the duration of the works.

  • Records of stripping depths, stockpile volumes and formation levels are kept for measurement and for the earthworks quality record.