PRES 2 study materials
PRES 2 study resources

PRES 2 study plan

PRES 2 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Pulp mill processes and fiber line

  • Map the kraft fiber line from chip yard to brownstock washing, labeling each unit operation and its purpose

  • Trace the cooking chemistry (white liquor, sulfidity, H-factor, kappa number) and explain how each variable shifts pulp quality

  • Compare continuous and batch cooking sequences and list the equipment differences between them

  • Draw a block flow diagram of a two-vessel hydraulic digester from memory and annotate the liquor flows

Your checkpoint

One-page annotated fiber line flow diagram plus a 15-term glossary of cooking variables with target ranges

Week 2

Pulp mill processes and fiber line & Reactor and digester equipment design

  • Describe oxygen delignification, bleaching stages (D0, Eop, D1, P) and their effluent and corrosion implications

  • Explain black liquor recovery and how pulping chemistry links to the recovery boiler and digester materials

  • Identify the principal components of a continuous digester: top separator, cooking zone, extraction screens, wash zone, blow line

  • Explain the function of the liquor circulation, heaters, and flash tanks in a digester system

Your checkpoint

Written comparison table of batch versus continuous digester equipment with at least 10 rows

Week 3

Reactor and digester equipment design

  • Analyze digester shell, cone, and nozzle designs for pressure, thermal cycling, and fatigue loading

  • Explain the role of internal screens, scallops, and their susceptibility to cracking and plugging

  • Evaluate design features that control thermal stress during heat-up, cook, and blow

  • Identify common digester degradation mechanisms and where each occurs on the vessel

Your checkpoint

Annotated digester cross-section sketch marking high-stress and high-corrosion locations with a short justification for each

Week 4

Materials selection and corrosion

  • Match alloys (carbon steel, austenitic and duplex stainless, nickel alloys, titanium) to specific pulp mill environments

  • Explain caustic stress corrosion cracking, chloride SCC, and thiosulfate cracking in white liquor and digester service

  • Describe weld overlays, cladding, and thermal spray coatings and when each is selected

  • Explain how corrosion allowances and material selection interact with vessel design life

Your checkpoint

Material selection matrix covering at least 8 pulp mill services with chosen alloy, threat, and rationale

Week 5

Pressure vessel and piping codes

  • Recall the scope and structure of ASME Section VIII Division 1 and where the design-by-rule formulas apply

  • Compute minimum required shell thickness for a cylindrical vessel given design pressure, allowable stress, and joint efficiency

  • Apply rules for openings and reinforcement, and locate the weld joint efficiency categories

  • Distinguish Section VIII requirements from ASME B31.3 piping requirements for a mill piping system

  • Explain design conditions, MAWP, and how they are documented on the nameplate

Your checkpoint

Worked calculation set of 5 problems (thickness, MAWP, opening reinforcement) with steps shown and answers checked

Week 6

Inspection, testing, and non-destructive examination

  • Select NDE methods (UT, RT, PT, MT, AET, visual) appropriate to digester shell, welds, and overlay inspection

  • Explain acceptance criteria concepts and how flaw sizing feeds fitness-for-service decisions

  • Describe pressure test requirements and when hydrostatic versus pneumatic testing is chosen

  • Outline an inspection plan with intervals and scope for a digester and its nozzles

Your checkpoint

Inspection plan document for one digester including methods, coverage, intervals, and acceptance basis

Week 7

Safety systems, relief devices, and risk assessment

  • Size or verify a pressure relief valve for a given relief scenario and explain the governing equations and assumptions

  • Identify credible relief scenarios for digesters and accumulators, including blocked outlet and thermal expansion

  • Explain the elements of a risk assessment (HAZOP, LOPA) and how safeguards are credited

  • Describe safety instrumented function basics and how interlocks protect digester operations

Your checkpoint

Relief scenario list with a worked sizing calculation for one scenario and stated assumptions

Week 8

Maintenance, repair, and remaining-life assessment & Pressure vessel and piping codes & Inspection, testing, and non-destructive examination

  • Apply remaining-life assessment methods including corrosion rate trending and fitness-for-service evaluation

  • Plan repair and alteration work with the code requirements that govern each

  • Integrate inspection findings into a remaining-life estimate and inspection interval adjustment

  • Complete a timed mixed-domain practice set and review every missed item to root cause

Your checkpoint

Remaining-life assessment write-up for a corroded digester section plus a scored practice exam log with error analysis

Milestones

Week 2: Can explain the full fiber line from chips to bleached pulp in 10 minutes without notes, including where each major corrosion threat arises

Week 4: Can state the correct alloy for six given mill services and justify each choice by naming the specific degradation mechanism

Week 5: Scores at least 80% on the self-made thickness and MAWP calculation set with correct units throughout

Week 6: Inspection plan is complete enough that another engineer could execute it without asking clarifying questions

Week 7: Relief valve sizing calculation is dimensionally consistent and the chosen scenario is defensible against alternatives

Week 8: Timed mixed-domain practice score of 75% or better, with every error traced to a specific weak topic and a remediation action