The Crusher Chute Blockage

QSCS Quarry Skills · Put your knowledge to work in context.

All case studies

The Crusher Chute Blockage

You are the processing plant supervisor. At 10:15 the primary jaw crusher feed chute bridges and the crusher stops. The operator reports the blockage over the radio and says he can clear it 'in two minutes with a bar' from the access platform. The crusher drive is still energised but the feed conveyor interlock has tripped. The plant has no permit-to-work system for chute clearing; the operator has done it 'many times'. A second operator is on the platform above, out of sight of the first. The crusher discharge conveyor is running. The site's isolation procedure requires a lock and key at the MCC, but the MCC is 60 m away and the key is held by the shift electrician, who is on a break.

1. Assess the hazards of the proposed chute-clearing method and state what must happen before any work begins.

Read the worked answer

The proposed method is a classic fatality scenario:

  • Entanglement and crushing: clearing a blockage from an energised crusher exposes the operator to the jaw, the flywheel and the drive. Even with the interlock tripped, stored energy and unexpected restart are possible.
  • Stored energy: a bridged chute can release suddenly, dropping rock and the bar onto the operator.
  • Falling from height: the access platform, with the operator leaning over an edge.
  • Falling objects: the second operator above, out of sight, could drop material or be struck.
  • No permit system: the absence of a formal clearance procedure means no verification that the machine is isolated.

Before work begins:

  1. Isolate and lock off the crusher and all associated conveyors at the MCC, with a personal lock and key held by the person doing the work.
  2. Prove dead - try-start and test for zero energy.
  3. Physically secure the chute against release (e.g. support the bridged material).
  4. Use a safe clearing method - from a guarded platform, with a proper tool, never by reaching into the crusher.
  5. Brief both operators, establish radio contact, and ensure the second operator is visible or in communication.
  6. Complete a permit or the site's equivalent clearance record.

2. The shift electrician cannot be found and production is losing money. What is your decision?

Read the worked answer

Stop the job until isolation is achieved. Production loss is not a justification for bypassing isolation. Options in order of preference:

  1. Locate the electrician or another authorised person with isolation authority - page them, call their mobile, or send someone.
  2. Use the site's emergency isolation procedure if one exists, which typically allows a competent supervisor to isolate under a documented process.
  3. Keep the plant stopped and inform the quarry manager of the delay and the reason.

What I would not do is allow the operator to clear the chute with the crusher energised. The 'done it many times' argument is exactly how people are killed - familiarity breeds shortcuts. The decision and the reason for delay are recorded, and the lack of a permit-to-work for chute clearing is raised as a corrective action.

3. Recommend the longer-term controls to prevent recurrence.

Read the worked answer
  • Introduce a permit-to-work system for entry into crushers, chutes and conveyors, with named isolators and personal locks.
  • Engineering controls: fit a properly guarded clearing platform, a hydraulic rock breaker or vibrator to prevent bridging, and level sensors to alarm on high level before bridging occurs.
  • Interlock verification: ensure the feed conveyor interlock cannot be reset while anyone is on the platform.
  • Training and competence: brief all operators on the clearance procedure; remove the informal 'bar' method.
  • Communication: require radio contact and a banksman for any work on the platform.
  • Review after any near miss or blockage event.