Quick reference

Safety

  • Hazard controls follow the hierarchy: elimination, substitution, engineering controls, administrative controls, then PPE last.

  • Permit-required tasks include hot work, confined-space entry, line breaking, and work at height; each permit states its own isolation and gas-test requirements.

  • Confined-space entry requires testing for oxygen (19.5–23.5%), flammables, and toxics before entry and continuously during occupancy.

  • Hot work near piping requires a fire watch maintained at least 30 minutes after work stops, with combustible gas testing below the LEL.

  • Lockout/tagout requires zero-energy verification by attempt to start or by test meter before work begins; a tag alone is not an isolation.

  • PPE for pipefitting: safety glasses with side shields, face shield for grinding, gloves matched to chemical and cut hazard, and hearing protection above 85 dBA.

  • A cylinder of oxygen must never be used to blow out lines or to power pneumatic tools; oil and grease plus oxygen is an ignition hazard.

  • A dropped object rule: tools above head height are tethered or in a bag; hard hats are required where overhead work is in progress.

Quick reference

Regulations and Code Requirements

  • SOLAS Chapter II-1 Regulation 26 requires piping systems essential to the safety of the ship to be designed, constructed, and installed to the Administration's satisfaction.

  • Classification society rules (ABS, DNV, Lloyd's, BV) supplement SOLAS; where they conflict, the more stringent requirement is applied.

  • Piping carrying fuel oil, lube oil, and other flammable liquids is prohibited above or close to hot surfaces and electrical equipment per SOLAS II-2.

  • A piping system's design pressure is the maximum allowable working pressure (MAWP); the design temperature is the maximum expected service temperature.

  • Hydrostatic test pressure is typically 1.5 times design pressure; the test is held for at least 10 minutes at stabilized pressure.

  • Material certificates must be traceable to the heat number and to the specification; pressure-containing parts use the grade called out on the drawing.

  • Any alteration to a class-approved system requires re-approval; field changes cannot substitute for an approved drawing revision.

Quick reference

Pipe, Fittings, Valves and Materials

  • Nominal pipe size (NPS) is a dimensionless designation; actual outside diameter is fixed per NPS, and wall thickness is set by schedule.

  • Schedule number approximates 1000 × internal pressure / allowable stress; higher schedule means thicker wall for the same NPS.

  • Common marine grades: carbon steel ASTM A106 Gr B, A53 Gr B; stainless 316L (UNS S31603) for seawater-adjacent and chemical service.

  • Galvanized carbon steel is not used in seawater service; the zinc coating fails and the underlying steel corrodes rapidly.

  • Butt-weld fittings to ASME B16.9; socket-weld and threaded fittings to ASME B16.11; flanges to ASME B16.5 (NPS 1/2–24).

  • A gate valve is for isolation, a globe valve for throttling, a ball valve for quick shutoff, and a check valve for one-way flow only.

  • Valve pressure class (150, 300, 600) is the maximum allowable non-shock pressure at the rated temperature, not a burst rating.

  • Gasket selection: spiral-wound with graphite filler for high temperature and pressure; non-asbestos sheet for low-pressure water and air.

Quick reference

Pipe Layout, Measurement and Preparation

  • Take-off measurement: center-to-center distance minus fitting take-outs equals the cut length of straight pipe.

  • A 90° long-radius elbow take-out equals 1.5 × NPS; a 45° elbow take-out equals 0.625 × NPS (approximately).

  • For a 45° offset, the travel equals the offset divided by the sine of 45° (0.7071); the run equals the offset for a 45° set.

  • For a rolling offset, true offset = square root of (horizontal offset squared + vertical offset squared).

  • Cut pipe square: end squareness within 1 mm for butt weld prep; bevel angle 30° +5/−0° with a 1.6 mm root face for standard V-groove.

  • Clean the bevel and 25 mm of adjacent surface to bare metal before welding; remove all oil, paint, and scale.

  • Allow for thermal expansion: ΔL = L × α × ΔT, with α ≈ 0.012 mm/m·°C for carbon steel.

  • Cold spring is not a substitute for a properly designed expansion loop; it is used only where the design specifies it.

Quick reference

Pipe Joining and Fabrication Methods

  • Butt-weld joints are full-penetration; the root pass must be complete and fused to the bevel before the fill passes.

  • Socket-weld joints leave a 1.6 mm gap at the bottom of the socket to allow expansion and prevent cracking at the root.

  • Threaded joints use tapered NPT threads; sealant is applied to the male thread, leaving the first two threads bare.

  • Flanged joints: bolts are tightened in a star or crisscross pattern in stages to the specified torque; gasket is centered on the flange face.

  • Brazing for copper: filler melts above 450°C but below the base metal melting point; soldering filler melts below 450°C.

  • Purging with argon is required for stainless steel root protection; oxygen content in the purge gas should be below 0.1% for critical welds.

  • Post-weld heat treatment is required for carbon steel above specified thickness (commonly 25 mm for P-No.1) and for certain alloy steels.

Quick reference

Pipe Supports, Hangers and Expansion Control

  • Support spacing for carbon steel water lines: NPS 1 ≈ 2.1 m, NPS 2 ≈ 3.0 m, NPS 4 ≈ 4.3 m, NPS 6 ≈ 5.2 m (typical values, verify against project spec).

  • A rigid support restrains all movement; a spring hanger allows vertical movement while carrying load; a guide allows axial movement only.

  • An anchor restrains translation and rotation at one point and directs expansion to the designed loops or offsets.

  • Expansion loops absorb thermal growth; loop leg length is sized so the developed stress stays within the allowable range.

  • A pipe shoe raises the pipe off the support and reduces friction; it is not a substitute for a guide where lateral restraint is needed.

  • A cold pull (cold spring) of 50% is common where specified, applied to the open end before final tie-in.

  • Vibration isolation uses resilient pads or spring isolators; hard supports transmit vibration into the structure.

Quick reference

Pressure Testing, Inspection and Quality Control

  • Hydrostatic test: fill, vent all air, pressurize in steps to 1.5 × design pressure, hold 10 minutes minimum, inspect all joints.

  • Pneumatic testing carries stored-energy risk; where used, test pressure is typically 1.1 × design pressure and the area is barricaded.

  • Test water temperature should be above the ductile-to-brittle transition temperature of the material to avoid brittle fracture.

  • After hydrotest, drain and dry; stainless steel lines are rinsed with low-chloride water to prevent chloride attack.

  • Visual inspection of welds covers bead profile, undercut, spatter, and fit-up; it does not detect internal defects.

  • Non-destructive examination: radiography for volumetric internal defects, dye penetrant for surface-breaking defects on non-porous materials, magnetic particle for surface and near-surface in ferromagnetic material.

  • Acceptance criteria for weld defects are found in the applicable code (e.g., ASME B31.3 or the class rule), not in the fabricator's judgment.

Quick reference

Piping Systems and Components

  • Bilge system: branches from each compartment lead to a bilge main, with non-return valves preventing backflow into compartments.

  • Ballast system: separate from bilge; cross-connections require an approved arrangement and a non-return valve.

  • Fuel oil transfer and service systems require quick-closing valves operable from outside the space and remote shutoff at the tank.

  • Sea water cooling systems use non-ferrous or corrosion-resistant materials; velocity is limited (typically under 3 m/s) to control erosion-corrosion.

  • Steam lines require drain traps at low points and at the end of mains; water hammer results from inadequate drainage or fast valve closure.

  • Air and sounding pipes must remain clear and terminate above the freeboard deck with approved closures.

  • A relief valve protects against overpressure; its set pressure does not exceed the MAWP of the protected system.

Quick reference

Isometric Drawings, Specifications and Documentation

  • An isometric shows three axes at 30° from horizontal; north arrow and line number identify the run.

  • Line number format typically: size, service code, sequence, material class, and insulation code (e.g., 4"-FO-102-A1A).

  • A bill of materials on the isometric lists every fitting, valve, and gasket with quantity and size; the pipe spool length is the cut length.

  • Welds are numbered on the drawing; the weld map ties each number to the welder, procedure, and NDE result.

  • The piping specification defines material class, pressure rating, gasket, and bolting for each service; the drawing must not contradict it.

  • Revision clouds and the revision block record changes; only the latest revision is used for fabrication.

  • Field-run dimensions are marked on the drawing at the point of tie-in; they are verified on site before cutting.

Quick reference

Tools, Equipment and Safe Work Practices

  • Pipe cutters: wheel cutter for small bore; abrasive saw or plasma for larger; cutting torch requires hot work permit and fire watch.

  • Pipe threading: hand die or power threader; thread length is set by the pipe size chart, and cutting oil is required.

  • Pipe bender: manual or hydraulic; bend radius must meet the minimum for the material and wall thickness to avoid ovality and thinning.

  • Torque wrench is calibrated and used within its range; a torque value is applied to the fastener, not to the wrench handle extension.

  • Grinder guards must be in place; the wheel is rated for the tool speed, and the operator stands clear of the wheel plane.

  • Lifting: slings are rated and inspected; never stand under a suspended load; tag lines control the load.

  • Housekeeping: combustible waste removed from hot work area, hoses routed clear of walkways, and gas cylinders secured upright.