Applied Structural Drying study materials
Applied Structural Drying study resources

Applied Structural Drying study plan

Applied Structural Drying · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Psychrometrics and Drying Science

  • Define and correctly use the core psychrometric properties (dry-bulb, wet-bulb, dew point, relative humidity, humidity ratio, enthalpy, specific volume) without notes

  • Read a psychrometric chart to locate state points from any two given properties and state which other properties can then be derived

  • Explain how temperature change alone shifts relative humidity while humidity ratio stays constant, and compute the resulting RH at a new temperature

  • Describe the difference between evaporation and evaporation-driven cooling, and predict the effect of airflow and heat on each

Your checkpoint

A one-page cheat sheet mapping each psychrometric property to its chart axis or curve, plus five worked chart-reading problems with answers

Week 2

Psychrometrics and Drying Science

  • Calculate dew point spread and explain what a narrowing spread means for secondary water damage risk

  • Distinguish open, closed, and combination drying systems and justify when each is appropriate

  • Explain the role of vapor pressure differential in driving drying and how to increase it safely

  • Predict condensation risk on cool surfaces given a room's dew point and surface temperature

Your checkpoint

A decision table comparing open, closed, and combination systems with at least three selection criteria and one worked dew-point example each

Week 3

Moisture Inspection, Monitoring and Documentation

  • Select the correct moisture meter mode (pin, pinless, or thermo-hygrometer) for a given material and explain its limits

  • Establish a drying goal for a wet material using a dry standard from an unaffected area

  • Sketch a monitoring grid for a room and justify meter placement and count

  • Interpret daily moisture readings to decide whether a drying system is working or needs adjustment

Your checkpoint

A sample monitoring log for a mock room with a grid sketch, dry-standard readings, and a written interpretation of a three-day trend

Week 4

Moisture Inspection, Monitoring and Documentation & Psychrometrics and Drying Science

  • Document pre-existing conditions and moisture findings in a defensible, photo-supported format

  • Write a concise daily drying report that ties psychrometric readings to moisture trends

  • Explain how to avoid cross-contamination and meter damage during monitoring

  • Review a mock project file and identify gaps in documentation

Your checkpoint

A complete mock project file: initial inspection notes, monitoring log, and a two-page summary report with charted trend

Week 5

Drying System Design, Equipment and Airflow

  • Size air movers for a given wet area using airflow principles and justify placement for a drying vortex

  • Compute the required number of dehumidifiers from a room's volume, conditions, and target drying goal

  • Design an airflow layout that avoids dead zones and short-circuiting

  • Select between refrigerant and desiccant dehumidifiers for different temperature and humidity scenarios

Your checkpoint

A system design worksheet for a mock 400-square-foot water-damaged room: air mover count and placement map, dehumidifier sizing calculation, and rationale

Week 6

Drying System Design, Equipment and Airflow & Project Management, Safety and Customer Communication

  • Explain how to balance a drying chamber so pressure and airflow support drying without spreading contamination

  • Draft a safety plan covering electrical, slip, PPE, and confined-space hazards

  • Describe how to set up containment and negative pressure for a category 3 loss

  • Write a customer-facing explanation of why drying takes multiple days

Your checkpoint

A one-page safety and containment plan plus a 150-word customer script for a category 3 water loss

Week 7

Project Management, Safety and Customer Communication

  • Build a project timeline with monitoring checkpoints and decision gates for when to stop drying

  • Practice explaining scope, cost drivers, and insurance documentation to a homeowner

  • Identify common causes of failed or prolonged drying projects and the corrective action for each

  • Outline an escalation path when a drying goal is not met on schedule

Your checkpoint

A project management plan for a mock loss with timeline, checkpoints, and a written escalation procedure

Week 8

Psychrometrics and Drying Science & Moisture Inspection, Monitoring and Documentation & Drying System Design, Equipment and Airflow & Project Management, Safety and Customer Communication

  • Complete a timed 60-question mixed-domain practice set and score at least 80 percent

  • Review every missed question and write a corrected explanation for each

  • Re-derive the psychrometric and sizing calculations from memory

  • Summarize each domain's key decision rules in your own words

Your checkpoint

A scored practice exam with a written review log of every missed item and a final one-page domain summary

Milestones

Week 2: Can read a psychrometric chart and justify open versus closed drying without notes

Week 4: Can produce a complete mock project file with monitoring log and trend interpretation

Week 6: Can size air movers and dehumidifiers for a mock room and defend the layout

Week 8: Scores at least 80 percent on a timed mixed-domain practice set with a complete review log