Israel Architecture Licensing flashcards
Israel Architecture Licensing · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Architects Registry
- The body within the Ministry of the Interior that maintains the register of licensed architects, administers the licensing examinations, and enforces title protection under the Architects Law.
- Supervised internship (stage)
- A period of supervised practical training under a licensed architect, required before sitting the licensing examinations; the Registry sets its minimum duration and documentation.
- Professional secrecy
- The architect's duty not to disclose client information obtained during the engagement, except where disclosure is required by law or authorized by the client.
- Architects Law 1991
- The Israeli statute protecting the architect title, establishing registration and discipline, and constituting the Architects Council; it is the profession's primary legal framework.
- Moral rights
- Under the Copyright Law 2007, the author's non-transferable rights of attribution and integrity, protecting the work against distortion or derogatory treatment.
- Disciplinary tribunal
- A statutory body hearing complaints against registered architects; it may impose sanctions from reprimand through suspension to erasure from the Register.
- TAMA 35
- Israel's national outline plan for construction, development, and conservation, setting urban-growth, density, and open-space policy implemented through district and local plans.
- Building permit (hovat bniya)
- Authorization issued by the local planning and building committee allowing construction per approved plans; work may not begin before it is granted.
- Form 4 (completion)
- The certificate confirming a completed building conforms to its permit and approved plans, issued after inspection; it enables occupancy and connection of utilities.
- District appeals committee
- The va'adat iyun that hears appeals against decisions of local planning and building committees, including permit refusals and enforcement orders.
- Floor-area ratio
- The ratio of permitted built floor area to plot area, set by the applicable plan; it governs building bulk and is calculated using the statutory area definition.
- TAMA 38
- A national outline plan permitting added floor area and units in exchange for seismic strengthening of older buildings, subject to local plan compliance.
- Objection stage (hitnagdut)
- The statutory period after a plan is deposited during which affected parties may file objections, which the planning committee must consider before approval.
- Change of use
- Alteration of a building's permitted use, which requires a new or amended permit and triggers compliance with current fire, accessibility, and parking requirements.
- SI 5281
- The Israeli Standard for accessibility of the built environment, mandatory for public buildings, workplaces, and new residential construction; it sets route, ramp, and sanitary dimensions.
- SI 4141
- The Israeli fire-safety standard for buildings, defining fire compartments, escape routes, and fire-resistance periods according to occupancy and building height.
- SI 921 and SI 5282
- Israeli standards for thermal insulation of buildings and for energy rating; together they drive envelope design, system efficiency, and renewable-energy compliance.
- Protected stairwell
- An enclosed escape stair with fire-rated construction and, in high-rise or below-grade conditions, smoke control by pressurization or ventilation per SI 4141.
- Travel distance
- The maximum permitted route length from any point in a space to a protected exit, set by occupancy and building height in SI 4141.
- Accessibility commissioner
- The statutory official empowered to grant permits and exemptions from accessibility requirements under SI 5281 and the equal-rights legislation for persons with disabilities.
- Net vs gross area
- Net usable area excludes internal walls and circulation, while gross area includes them; statutory floor-area calculations use the plan's own definition, not net area.
- Design development sign-off
- The client's formal approval at the end of design development, which fixes the brief and the design basis and limits later variations to instructed changes.
- Universal design
- Design beyond minimum accessibility compliance, using level thresholds, generous turning circles, and visual contrast so spaces work for the widest range of users.
- Partial safety factors
- Limit-state design method multiplying loads by load factors and dividing material strength by resistance factors, used in Israeli concrete and steel standards.
- Seismic detailing
- Reinforcement and member detailing that provides ductility, including column confinement and shear walls, required in seismic zones under SI 413 and SI 100.
- Geotechnical report
- The site investigation that establishes soil bearing capacity, settlement, and groundwater conditions, governing the choice between shallow footings and deep foundations.
- SI 5282 energy rating
- The Israeli standard rating a building's energy performance from envelope, systems, and renewables; a higher rating rewards efficient design and generation.
- Stairwell pressurization
- A smoke-control strategy maintaining positive pressure in an escape stair so smoke cannot enter, required for high-rise and below-grade stairs under SI 4141.
- Fire-vehicle access
- The site route for emergency vehicles, with minimum width, turning radius, and load capacity set by SI 4141 and checked at permit stage.
- Conservation plan (tochnit shimur)
- A statutory plan listing protected buildings and defining permitted interventions and design guidelines for additions and facades in a historic area.
- Critical-path method
- A scheduling technique identifying the sequence of dependent activities whose delay delays project completion, used to manage time and float.
- Defects liability period
- The agreed period after handover during which the contractor must remedy defects at no cost, with the architect issuing the notice and certifying release of retention.