IL Roofing Contractor · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Licensing, Business Operations, and Illinois Regulatory Compliance

  • Chart the Illinois roofing contractor license lifecycle end to end: pre-qualification, application, exam, issuance, renewal, and disciplinary process.

  • Tabulate which roofing activities trigger state licensure versus a municipal permit, registration, or bond requirement.

  • List the insurance, bonding, and financial-responsibility obligations a licensee must keep in force to stay in good standing.

  • Identify the advertising, contracting, estimate, and consumer-disclosure rules that bind a licensed Illinois roofing contractor.

Your checkpoint

A two-page licensing and compliance map (lifecycle timeline plus obligations table), followed by a 25-question self-quiz scored at 85% or better.

Week 2

Licensing, Business Operations, and Illinois Regulatory Compliance & Roofing Materials, Components, and Systems

  • Distinguish the role and correct placement of underlayment, ice barrier, drip edge, flashing, and ventilation within a steep-slope roof assembly.

  • Classify common steep-slope coverings (asphalt shingle, clay and concrete tile, wood, metal, synthetic) by weight, minimum slope, and fastening method.

  • Convert manufacturer slope, underlayment, and fastener requirements into a single one-page decision table.

  • Complete 40 mixed practice items on licensing and materials, writing a one-line reason for every missed item.

Your checkpoint

A materials-by-slope decision table plus an error log with at least one corrective note per missed practice item.

Week 3

Roofing Materials, Components, and Systems & Installation Practices, Steep-Slope and Low-Slope Application

  • Describe the layer sequence and fastener schedule for a typical steep-slope shingle roof from deck to ridge, stating the consequence of skipping or misordering each step.

  • Explain the low-slope membrane families (thermoplastic, thermoset, modified bitumen, built-up) in terms of seaming, attachment, and allowable slope.

  • Identify the flashing details at valleys, sidewalls, penetrations, and roof-to-wall transitions and explain why each is sequenced that way.

  • Calculate material quantities, including waste factor, for two sample roof plans.

Your checkpoint

Two hand-sketched detail sheets (valley and wall/penetration) with a numbered installation sequence and called-out materials for each.

Week 4

Installation Practices, Steep-Slope and Low-Slope Application

  • Walk through deck preparation, nailing patterns, exposure control, and ridge/hip closure for shingle application, naming the defect each shortcut produces.

  • Outline tear-off and re-roof procedures, including substrate inspection and the decision rules for replacing rotted sheathing.

  • Sequence a low-slope membrane installation from substrate preparation through terminations and edge metal.

  • Diagnose five failure scenarios (blow-off, ice-dam leak, fastener back-out, ponding, seam failure) and match each to a root cause and correct installation fix.

Your checkpoint

A timed 50-question installation practice set scored at 80% or better, plus a one-page failure-cause map linking symptom, cause, and correct detail.

Week 5

Installation Practices, Steep-Slope and Low-Slope Application & Jobsite Safety, Fall Protection, and Code Requirements

  • Apply the OSHA fall-protection trigger heights to roofing tasks and state when guardrail systems, safety nets, or personal fall arrest systems are required.

  • Specify anchor points, lifeline or lanyard configuration, and a rescue plan for a two-story residential re-roof.

  • Assemble a ladder, scaffold, roof-edge, and opening-protection inspection checklist a crew lead would actually use.

  • Identify the code provisions on roof and attic ventilation and on roof access that affect how a roofing system is installed.

Your checkpoint

A one-page jobsite safety plan for a two-story re-roof that names the selected fall-protection method and justifies the choice against the applicable threshold.

Week 6

Jobsite Safety, Fall Protection, and Code Requirements

  • Summarize the roofing-relevant model code requirements: slope-based material limitations, underlayment, flashing, ventilation, and fire and wind classification.

  • Translate those code sections into a walk-the-roof final-inspection checklist.

  • Explain hazard communication, PPE selection, and tool and temporary-power safety requirements for roofing crews.

  • Drill 60 code and safety items, logging every miss against the specific code concept it tests.

Your checkpoint

A code inspection checklist plus a record of the 60-item drill scored at 85% or better with a closed-out miss list.

Week 7

Estimating, Plans, Specifications, and Contracting

  • Break a roofing estimate into labor, material, equipment, overhead, and profit, and compute waste and pitch/ complexity factors.

  • Read roof plan and elevation sheets and take off squares, ridge, hip, valley, and flashing lengths.

  • Identify the terms a roofing contract must contain, including scope, exclusions, change orders, payment schedule, warranty, and lien-notice basics.

  • Write a scope-of-work narrative and a change-order form for the sample project.

Your checkpoint

A complete takeoff and bid package for one sample roof, including the written scope of work and a one-page contract summary.

Week 8

Estimating, Plans, Specifications, and Contracting & Licensing, Business Operations, and Illinois Regulatory Compliance & Roofing Materials, Components, and Systems & Installation Practices, Steep-Slope and Low-Slope Application & Jobsite Safety, Fall Protection, and Code Requirements

  • Re-test the two lowest-scoring domains and raise each score by at least 10 points over the prior attempt.

  • Complete two full-length timed simulated exams under test-day conditions with no notes.

  • Review the cumulative error log and close every recurring miss by writing the governing rule in your own words.

  • Compress all numeric thresholds and code limits into a one-page final-review sheet.

Your checkpoint

Two timed full-length practice exams scored at 80% or better, with a fully closed error log and a finished one-page threshold sheet.

Milestones

Week 2: Licensing and materials self-quiz at 85% or better, and the materials decision table covers every covering family on the equipment list.

Week 4: Score 80% or better on a timed 50-item mixed set covering Domains 1, 3, and 4, and both detail sheets can be explained aloud without notes.

Week 6: Score 85% or better on a 60-item safety and code set, and the week 5 safety plan passes a 15-point self-audit against the fall-protection thresholds.

Week 7: Sample bid package is complete and internally consistent, with takeoff quantities reconciling to the estimate line items.

Week 8: Two full-length timed simulations at 80% or better, no domain below 70%, and every error-log entry marked resolved.