- Confined space oxygen range
- Safe entry oxygen level is 19.5% to 23.5% by volume. Below 19.5% is oxygen deficient and above 23.5% is an fire risk; test before entry and ventilate.
- H2S in manholes
- Hydrogen sulphide is heavier than air, deadens the sense of smell above about 100 ppm, and is the main cause of death in sewer manholes. Never rely on smell.
- Pipe wrench jaw rule
- Turn a pipe wrench so the force pushes toward the fixed jaw. Reversing the wrench damages the teeth and the pipe, and the joint slips under load.
- Gate valve versus globe valve
- A gate valve gives full-bore on/off isolation with low head loss. A globe valve gives fine throttling control but causes a high pressure drop across the seat.
- BSP taper ratio
- Standard pipe thread in India is BSP taper with a 1:16 taper on diameter. A correct joint leaves three to four threads exposed beyond a hand-tight fitting.
- Solvent cement cure time
- After solvent cementing a UPVC joint, allow 24 hours of cure before pressure testing. Push with a quarter turn and hold for 30 seconds immediately after assembly.
- Head to pressure conversion
- Each metre of vertical head gives about 9.81 kPa, roughly 1 kg/cm squared. A 10 m head therefore gives about 98 kPa at the outlet.
- Overhead tank head rule
- Fit the overhead tank at least 2 m above the highest fixture outlet. Below this, gravity flow is poor and a booster pump is needed.
- Trap water seal depth
- Provide a minimum 50 mm water seal for basins, sinks, and floor traps. Use 75 to 100 mm for WC pans and traps exposed to induced siphonage.
- Basin and sink heights
- Fix the wash basin rim 750 to 800 mm above finished floor. Fix the sink top 800 to 850 mm and the WC seat 400 to 450 mm above floor.
- Drain gradient rule
- Lay a 100 mm soil line at 1:40 to 1:60 and a 150 mm line at 1:80 to 1:100. A 50 mm waste runs at 1:30 to 1:40 for self-cleansing flow.
- Vent stack size rule
- A vent stack must be at least half the soil stack diameter and never smaller than 32 mm. A 100 mm soil stack therefore needs a 50 mm vent.
- Drawing scale convention
- Use 1:50 for plans and sections, 1:100 for general plans, and 1:20 or 1:10 for details. Always state the scale on the drawing sheet.
- Wastage allowance in take-off
- Add about 5% to pipe length for cutting waste and 2 to 3% for fittings and offsets when preparing a material take-off from drawings.
- Hydrostatic test pressure
- Test water supply lines at 1.5 times the working pressure, with a minimum of 0.7 MPa, held for at least one hour with no drop on the gauge.
- Drainage air test
- Plug the low end and fill the drain with air to 38 to 50 mm water gauge, about 375 to 500 Pa. Hold for 15 minutes with no loss.
- Estimate versus quotation
- An estimate is an approximate cost given before work starts. A quotation is a firm offer to do the work at a stated price for a stated period.
- Break-even point formula
- Break-even volume equals fixed costs divided by selling price per unit minus variable cost per unit. Below this volume the enterprise makes a loss.
- Fixture unit values
- Typical fixture units: WC 6, wash basin 1, sink 2, bath 2, floor trap 1. Sum the values to size the branch and the stack.
- Vent termination height
- Terminate the vent pipe at least 150 mm above the roof and not within 3 m of an opening window, air intake, or balcony.
- Pump total head
- Total head equals static lift plus friction loss plus residual pressure needed at the fixture. Select the pump for this head at the required flow rate.
- Distribution velocity limit
- Keep cold-water velocity in the service line between 0.9 and 1.8 m per second. Above 2 m per second causes noise and pipe erosion.
- Cistern float setting
- Set the float valve so the shut-off water level is 25 to 40 mm below the overflow pipe. A dual-flush cistern uses 6 litres full and 3 litres reduced.
- Geyser relief valve rule
- Fit a pressure-relief valve and a non-return valve on a geyser. Never cap or block the relief valve outlet, because the tank can explode.
- Fitting take-out
- Fitting take-out is the centre-line length a fitting adds to a pipe run. Subtract it from the measured run to get the actual pipe length.
- Contract retention
- A contract typically retains 5 to 10% of each bill until completion. The balance is released after the defect-liability period ends.
- Tank chlorination dose
- Dose a new tank to 50 mg per litre free chlorine, contact for 24 hours, then flush until the residual falls below 0.2 mg per litre.
- Dripping tap repair
- Replace the worn washer or ceramic cartridge to stop a dripping tap. If the valve seat is worn, re-cut it with a seat reamer before fitting the new washer.
- Working capital formula
- Working capital equals current assets minus current liabilities. A plumbing business needs it to buy material before the client pays the bill.
- Résumé structure
- A résumé lists contact details, a short summary, skills with levels, work experience with dates and achievements, certifications, and references.
- Ladder angle rule
- Set a ladder at a 4:1 angle, meaning one unit out for every four units up. Secure it at the top and keep three points of contact while climbing.
- Trench shoring depth
- Shore or slope any trench deeper than 1.2 m. Keep spoil at least 0.6 m from the edge and provide a ladder every 7.5 m of trench length.