The 12-Seat Centre with a Rs 45,000 Budget

Odisha CHSE +2 Vocational IT/ITeS CRM Domestic Voice · Put your knowledge to work in context.

All case studies

The 12-Seat Centre with a Rs 45,000 Budget

You run a 12-seat CRM domestic voice centre in Bhubaneswar serving a telecom client. The monthly electricity bill is Rs 18,400. The 12 desktops with monitors draw about 2.0 kW in total and are left switched on round the clock, although the floor is staffed 09:00 to 21:00 and most dialling happens between 10:00 and 19:00. The tariff is Rs 7.50 per unit. In the store room there are 14 discarded CRT monitors and 9 old UPS batteries, and a water cooler is leaking near the pantry. In the past month two agents reported throat irritation and one reported wrist pain and blurred vision after long shifts; the chairs are plastic, with no height adjustment. You have Rs 45,000 to spend this quarter, and the client's audit asks for a written green IT and workplace safety policy before renewal.

1. Calculate the saving from switching the workstations off for 12 hours a day (leaving one low-power machine on for overnight backup), then decide how the Rs 45,000 should be spent, with reasons.

Read the worked answer

The calculation: 2.0 kW x 12 hours x 30 days = 720 kWh if everything is switched off. One backup machine at roughly 0.18 kW for the same period is about 65 kWh, leaving about 655 kWh saved per month. At Rs 7.50 per unit that is about Rs 4,910 per month, close to Rs 59,000 a year - more than the entire quarter's budget, for the cost of a shutdown script and a written rule.

Spending order, by risk and by payback:

  1. Leak and batteries first (low cost, high risk). Repair the water cooler immediately - a slip or an electrical contact near the pantry is an injury waiting to happen. Hand the 9 UPS batteries to an authorised e-waste recycler with a manifest; lead-acid batteries are hazardous waste and must not go to the municipal bin. Expect a small or zero cost and a large audit benefit.
  2. Power management second, because it is nearly free. Configure BIOS/OS shutdown, a group policy or a scheduled task, and add a closing checklist to the shift handover. Cost: staff time only.
  3. Ergonomics third, and staggered. Chairs with height adjustment run roughly Rs 3,500 each; 12 of them would consume the whole budget. Buy 6 this quarter for the agents who sit longest, with footrests and wrist supports, and phase the rest next quarter. Agents can share the improved seating across shifts.
  4. CRT monitors last. They are bulky, contain leaded glass and may carry a small scrap or buy-back value - but the recycler route, not the scrap dealer, is the compliant one.

Reasoning: the cheapest fix here is the largest recurring saving, so budget should not be spent on it at all; the money should go where the risk is physical and the cost is unavoidable.

2. Draft the green IT points the client's audit will look for in the written policy.

Read the worked answer

A policy that only says 'save the environment' fails an audit. The auditable points are specific and assigned:

  • Power management: all workstations and monitors shut down at end of shift; one nominated machine remains on for overnight backup; monitors sleep after 10 minutes. Named owner: shift supervisor. Evidence: shutdown checklist signed per shift.
  • E-waste: no IT asset leaves the premises except through an authorised recycler; every disposal logged with date, asset type, serial or count, recycler name and manifest number. Batteries kept separately, never mixed with general waste.
  • Procurement: new equipment must carry an energy-efficiency rating (BEE star rating for monitors and UPS), and old equipment is decommissioned only after a recorded data-wipe, which is both a green and a data-protection control.
  • Paper and consumables: e-tickets and digital attendance by default; printing only for statutory records; refilled cartridges.
  • Measurement: monthly kWh reading and cost per seat reported alongside the electricity bill, so the saving is visible and not assumed.
  • Training: every new joiner gets a 15-minute induction on the shutdown rule and the e-waste route.

Reasoning: each item has an owner, a record and a frequency. That is what separates a policy that survives an audit from a poster on the wall.

3. Address the reported health symptoms with a costed action plan, including the voice-specific risks of a domestic voice process.

Read the worked answer

Throat irritation in two agents is the classic voice-agent pattern: prolonged talking, dry air-conditioned air, shallow breathing from a hunched posture, and often inadequate water intake because breaks are tightly scheduled. Actions: repair the water cooler and provide drinking water at each bay; mandate a sip between calls; set microphone gain and headset volume correctly so agents are not compensating by raising their voice; enforce a short voice rest in every hour rather than one long break; and check the air-conditioning humidity, since very dry air aggravates the throat.

Wrist pain and blurred vision in one agent point to workstation setup: plastic chairs with no height adjustment force the wrists above elbow level and the eyes too close to the screen. With the budget constrained, do the free fixes now - monitor top edge at eye level, screen about an arm's length away, feet flat, 20-20-20 rule (look 20 feet away for 20 seconds every 20 minutes), headset cable routed so the arm is not pulling - and buy the six adjustable chairs this quarter.

Reporting: any symptom that persists beyond two weeks goes to a doctor, not just to the supervisor; log it and check whether it is becoming a pattern across the floor. Occupational health records are part of the audit evidence, and a repeated complaint from the same seat is a signal to inspect the workstation, not the agent.

Reasoning: most of this costs nothing but attention. The Rs 45,000 should be reserved for what attention cannot fix - the chairs, the cooler repair and compliant e-waste disposal.