III IC-99 study materials
III IC-99 study resources

Cold-Storage Fire: Coinsurance, Debris, Bylaw and Business Income

III IC-99 · Put your knowledge to work in context.

All case studies

Cold-Storage Fire: Coinsurance, Debris, Bylaw and Business Income

Halcyon Foods Ltd owns a cold-storage and packing plant. Its property policy is written on a replacement-cost basis with an 80% coinsurance clause, a $2,000,000 building limit, a $600,000 machinery limit, a $5,000 deductible, and a $120,000 business income limit with a 72-hour waiting period. At renewal the broker submitted a statement of values showing $2,000,000 for the building, based on a valuation report dated five years earlier; the underwriter accepted the values without inspection. In June a compressor caught fire. The adjuster measured the building's full replacement cost at $3,100,000 and the actual repair cost at $420,000, of which $65,000 was for demolition and removal of debris and $38,000 was to comply with a new fire-safety bylaw requiring a sprinkler upgrade in the rebuilt section. Production stopped for 11 days. The insured's records show average daily contribution (net profit plus continuing fixed costs) of $9,000, and it continued to pay $2,200 per day to idle salaried staff.

1. Calculate the building indemnity the insurer should pay, showing each step, and state what the insured bears itself.

Read the worked answer

Apply the coinsurance test before the deductible, in this order.

1. Required amount of insurance. 80% × replacement cost $3,100,000 = $2,480,000.

2. Carried / required. $2,000,000 ÷ $2,480,000 = 0.8065 (80.65%). Because the limit is below the requirement, the insured is a coinsurer for the shortfall.

3. Loss payable before deductible. 0.8065 × $420,000 = $338,710. The limit of $2,000,000 is far above the loss, so the limit does not cap the calculation.

4. Deductible. $338,710 − $5,000 = $333,710.

5. Amount the insured absorbs. $420,000 − $333,710 = $86,290, being the $81,290 coinsurance penalty plus the $5,000 deductible.

Check the assumption behind the valuation. The valuation is five years old, and building costs have moved. The coinsurance penalty arose not because the insured chose a low limit deliberately but because the broker recycled a stale report and the underwriter accepted it without inspection. The insured still bears the contractual penalty, but it has a strong errors-and-omissions argument against the broker, and the underwriter should expect a question about why a $3.1 million risk was accepted on an unsupported $2 million value. Note also that the policy is replacement-cost, so depreciation is not deducted - but the insured must actually repair, or the claim reverts to actual cash value.

2. The insured also claims the $65,000 debris removal and the $38,000 bylaw-driven sprinkler upgrade. Advise on each.

Read the worked answer

These two items sit on opposite sides of the line, and the reason is whether the policy adds coverage beyond the direct physical loss.

Debris removal - likely payable, subject to form wording. Most commercial property forms grant debris removal as an additional amount of insurance, commonly up to 25% of the amount paid for the direct loss plus the deductible. If that extension is present, the $65,000 is paid on top of the building indemnity, provided the total does not exceed the policy limit. If the form instead treats removal as part of the loss, the figure is simply inside the $420,000 already tested for coinsurance - which is how the adjuster has treated it. Read the extension first; do not assume the adjuster's treatment is right.

Bylaw upgrade - excluded unless endorsed. The cost of complying with an ordinance or law regulating construction, repair or demolition is a classic exclusion. The sprinkler upgrade is required by the new bylaw after the loss, not by the fire, so it falls squarely inside the exclusion. It would be payable only under an Ordinance or Law endorsement written on either a limited basis (typically 10–25% of the limit, for undamaged portions) or a full increased-cost-of-construction basis. A 10% endorsement on a $2,000,000 limit gives $200,000 and would absorb the $38,000; without it, the insured pays. The loss adjuster should confirm whether the sprinkler work also upgrades the undamaged area, because limited-form endorsements often cover only the damaged portion.

3. Assess the business income claim and identify the two issues most likely to cause dispute.

Read the worked answer

The period. 11 days of stopped production, less the 72-hour waiting period, gives roughly 8 indemnity days. The waiting period runs from the date of damage, so partial production on the day of restart complicates the count; use the insured's daily production records rather than a round figure.

The amount. $9,000 per day is already expressed as net profit plus continuing fixed costs, which is the correct measure - do not add the $2,200 payroll again on top of it, because continuing payroll is part of the $9,000 contribution figure. 8 × $9,000 = $72,000, inside the $120,000 limit. If the $9,000 were net profit only, then $2,200 × 8 = $17,600 of continuing payroll would be added; confirm which basis the accountant used before paying.

Issue 1 - whether the limit is adequate. With a $120,000 limit and a $9,000 daily contribution, the policy covers about 13 days. A cold-storage plant with a single compressor and long lead times for replacement parts should carry a much longer indemnity period. That is an underwriting and advisory failure to be documented, and it may support an E&O claim if the insured can show it asked for more.

Issue 2 - the cause of the delay. If the 11 days included time lost because the insured could not obtain a compressor quickly, the adjuster must test whether the delay was reasonable and unavoidable, or whether the insured failed to mitigate by using a temporary unit or a third-party cold store. Insurers pay for the time reasonably required to restore operations; they do not pay for slow purchasing decisions. Ask for the repair timeline, quotations and any interim storage arrangements.