IOV Valuer study materials
IOV Valuer study resources

Stranding Risk and the EPC Deadline

IOV Valuer · Put your knowledge to work in context.

All case studies

Stranding Risk and the EPC Deadline

A 1990s office building of 3,200 sq m is let to a single tenant until 2029 at a passing rent of €620,000. Market rent is €700,000. The building has an EPC rating of E. Local regulations require a minimum EPC C to grant a new lease from 2027 and EPC B from 2030. Achieving B would require roof insulation, glazing, a heat pump and PV at a cost of €1.85m, and would produce an eight-month void at lease expiry. The tenant pays all energy bills and has refused to contribute. Recent sales show EPC B offices at 5.5% cap rates; EPC E offices at 7.0%–7.5%, with agents reporting 'market hesitancy'. The client instructs you to value on the basis that 'the tenant pays the bills, so the EPC is not a landlord issue'. The loan security valuation is due in 10 days, and the client wants a single figure, not a range.

1. Assess whether the client's instruction is consistent with professional standards and market evidence. What regulatory and market factors must be reflected?

Read the worked answer

The instruction is not consistent with professional standards The client's statement that 'the tenant pays the bills, so the EPC is not a landlord issue' confuses the split of operating costs with the landlord's legal ability to let. From 2027, a new lease requires EPC C; from 2030, EPC B. The landlord bears the compliance risk and the capex.

Factors to reflect

  • Regulatory risk: the building may be unlettable at lease expiry without works; the timing is fixed.
  • Capex: €1.85m is a landlord cost, plus disruption and professional fees.
  • Void: eight months at lease expiry, possibly longer if works overrun or the market is weak.
  • Market evidence: EPC B offices at 5.5% versus EPC E at 7.0%–7.5% show a clear pricing differential. 'Market hesitancy' is evidence of risk, not a reason to ignore it.
  • Rental effect: post-works the building may command a 5% premium and a wider buyer pool; that benefit must be weighed against the cost.
  • ESG and liquidity: poor energy performance can lengthen marketing periods and reduce the number of bidders.

Conclusion The valuation must reflect the cost and timing of compliance, the void and the market's yield differential. A 'clean' valuation that ignores the EPC would overstate value and mislead the lender.

2. Quantify the likely impact on value and recommend how the valuation should be expressed.

Read the worked answer

Quantified approach A simple as-is capitalization of passing income at 7.25% gives €620,000 / 0.0725 = €8.55m. That ignores the reversion and the compliance costs, so it is not sufficient.

A short DCF reflects the lease to 2029, the capex, the void and the post-works income:

  • PV of passing rent for three years at 8%: about €1.60m.
  • PV of capex €1.85m at year 3: about €1.47m.
  • PV of eight-month void at €700,000 and leasing fees: about €0.43m.
  • Post-works rent at a 5% premium: €735,000. Capitalized at 5.75%: €12.78m; PV at year 3: about €10.15m. Net indication: 1.60 - 1.47 - 0.43 + 10.15 = €9.85m. Deduct purchaser's costs of 2.5% if the cap rate is not already net: about €9.6m.

Recommended expression Provide a single figure around €9.6m–€9.8m, with a range of €9.2m–€10.2m reflecting a 12-month void, capex overrun and yield movement. The client's requested 'ignore EPC' basis would produce about €8.55m on passing income or higher on reversion, but it would not reflect the obligation. A 12-month void instead of eight reduces value by roughly €0.3m; a 20% capex overrun reduces it by roughly €0.4m; a 6.25% exit cap adds about €0.8m.

3. Set out the report disclosures, assumptions and data limitations you would include.

Read the worked answer

Report disclosures

  • The EPC rating, certificate date and the regulatory timetable (C by 2027, B by 2030).
  • The client's instruction to ignore the EPC, and the valuer's reason for rejecting it. This protects the file and the lender.
  • The capex estimate of €1.85m, its source and its uncertainty; no contractor's quote has been seen.
  • The assumption that works can be completed in eight months and that the lease ends in 2029. If either is wrong, value changes.
  • The market evidence: 5.5% for EPC B and 7.0%–7.5% for EPC E. Explain the yield differential and the liquidity effect.
  • Tenant covenant and lease terms; the tenant's refusal to contribute is a fact, not an assumption.
  • The valuation basis, the date, the inspection, and the fact that no energy audit or measured data was provided.
  • A sensitivity table and, if appropriate, a material uncertainty clause because the capex and regulatory outcome are not fully known.

Professional point The report should not hide behind a single figure. It should show that the valuer understood the ESG risk and priced it. That is what a lender needs to make a credit decision.