Activated Sludge Plant Losing Biomass in the Monsoon

ISRO Scientist Civil · Put your knowledge to work in context.

All case studies

Activated Sludge Plant Losing Biomass in the Monsoon

A 30 MLD conventional activated sludge plant serves a mixed residential and textile-dyeing town. The aeration tank volume is 6,000 m³ with MLSS of 3,000 mg/L in the dry season, and there are two secondary clarifiers of 24 m diameter each. Three blowers (two duty, one standby) supply fine-bubble diffusers at 4.5 m submergence, and sludge age is controlled by wasting 200 m³/d at 7,000 mg/L. Dry-season influent is 30 MLD with BOD 250 mg/L, SS 250 mg/L and TKN 35 mg/L, and the plant meets the discharge norm. In the monsoon the flow rises to 45 MLD with BOD 110 mg/L and TKN 22 mg/L; MLSS falls to 1,400 mg/L, effluent BOD rises to 40 mg/L and SS to 60 mg/L, DO in the tank rises to 4.5 mg/L, SVI is 240 mL/g and a sludge blanket appears on the clarifier surface. Filaments are visible under the microscope and the inlet sewer smells strongly of sulphide.

1. Compute F/M, HRT and SRT for both seasons and identify which parameter has actually failed.

Read the worked answer

Dry season

  • BOD load = 30,000 × 0.250 = 7,500 kg/d; VX = 6,000 × 3.0 = 18,000 kg → F/M = 0.42 d⁻¹
  • HRT = 6,000/30,000 = 0.20 d = 4.8 h
  • Sludge out = wasting 200 × 7.0 = 1,400 kg/d + effluent SS ~20 mg/L × 30,000 = 600 kg/d = 2,000 kg/d → SRT = 18,000/2,000 = 9 d

Monsoon

  • BOD load = 45,000 × 0.110 = 4,950 kg/d; VX = 6,000 × 1.4 = 8,400 kg → F/M = 0.59 d⁻¹
  • HRT = 6,000/45,000 = 0.133 d = 3.2 h
  • Sludge out = 1,400 (wasting) + 45,000 × 0.060 = 2,700 kg/d = 4,100 kg/d → SRT = 8,400/4,100 = 2.0 d

Diagnosis: the F/M barely changes (0.42 → 0.59) and is not in the low-F/M bulking range at all, so low-F/M filament bulking is not the mechanism. What collapses is SRT, from 9 d to 2 d, and that loss is entirely through the effluent (2,700 of the 4,100 kg/d leaving in the overflow) - a hydraulic washout, not a wasting decision. HRT also falls to 3.2 h, below the ~4–6 h needed to damp a shock organic load in a fully mixed tank. The biomass is being flushed out faster than it can grow.

2. What causes the bulking and the clarifier blanket, and what does the 4.5 mg/L DO reading tell you?

Read the worked answer

The high DO is diagnostic. At 4.5 mg/L the aeration system is not limiting; low-DO filamentous bulking (Type 1701, Sphaerotilus) is ruled out, and the low organic load in the monsoon means less oxygen demand. So the filaments are substrate/electron-acceptor driven, not oxygen driven.

Bulking mechanisms that fit the data:

  • Short HRT with high soluble substrate entering in a fully mixed tank gives dispersed growth and favours fast-growing filaments over floc formers.
  • Sulphide in the inlet is the decisive clue. Long detention in the sewers, plus sulphate-rich dyeing effluent, produces sulphide and a low redox potential; sulphur-oxidising filaments (Thiothrix, Type 021N, Beggiatoa) thrive on reduced sulphur compounds. This explains both the 240 mL/g SVI and the septic odour.

Blanket: at SVI 240 mL/g with MLSS 1.4 g/L, the 30-minute settled volume is 240 × 1.4 = 336 mL/L, i.e. about a third of the clarifier depth, while the hydraulic flow is 50% higher and the RAS pumps (sized for 30 MLD) cannot return the required 1.5–2.0 Q. The sludge rises rather than being under-returned because of the area. Solids loading = (45,000 + 18,000) × 1.4 / 904 m² ≈ 98 kg/m²·d, which is within the acceptable band - so the blanket is a settleability and return-capacity failure, not a clarifier-area failure.

3. Give immediate operational actions and the permanent works needed, with the size of the permanent works quantified.

Read the worked answer

Immediately (this monsoon):

  1. Divert or equalise the excess 15 MLD. A storm-holding tank of 15,000 m³/d × 0.5 d = 7,500 m³, or throttled diversion to a storm overflow, protects the biomass.
  2. Stop wasting until MLSS recovers above 2,500 mg/L; run all RAS pumps at maximum and check the RAS capacity - it must handle 1.5–2.0 Q at 45 MLD, i.e. 67,000–90,000 m³/d, not the current 15,000 m³/d.
  3. Dose PAC or polyaluminium chloride to the clarifier as a short-term settling aid, and pre-aerate the incoming sewage to strip sulphide before it reaches the aeration tank.
  4. If filaments persist, dose the return sludge with 2–3 kg Cl per tonne MLSS for 3–5 days, watching for nitrifier kill.

Permanent works:

  1. Aeration volume. For a 6 h HRT at 45 MLD the tank must be 45,000 × 0.25 = 11,250 m³, an increase of 5,250 m³; alternatively add an anoxic/selector compartment ahead of the tank, which suppresses filaments far more cheaply than extra volume.
  2. Third clarifier or larger RAS capacity to keep the solids loading below about 120 kg/m²·d at the peak flow.
  3. Source control: sulphate/sulphide limits and pre-treatment for the dyeing cluster, plus sewer rehabilitation to cut infiltration - the flow rise from 30 to 45 MLD is a collection-system problem, not a treatment problem.
  4. Install DO and MLSS control loops, since the monsoon DO of 4.5 mg/L shows the blowers are running flat out for no benefit.