ISRO Scientist Civil key terms
ISRO Scientist Civil · Get comfortable with the vocabulary.
- Limit state of collapse
- Related: Partial safety factor, Characteristic strength
A design condition in which a structure or member reaches its maximum load-carrying capacity through yielding, crushing, or buckling, and is checked using factored loads with partial safety factors applied to both loads and material strengths.
- Partial safety factor
- Related: Limit state of collapse, Characteristic strength
A multiplier applied separately to loads and to material strengths to account for uncertainty and variability, producing design values that ensure adequate safety against the specified limit state within a chosen probability of failure.
- Characteristic strength
- Related: Partial safety factor, Limit state of collapse
The value of material strength below which not more than five percent of test results are expected to fall, determined statistically from cube or cylinder tests and used as the base value before applying partial safety factors.
- Moment distribution method
- Related: Stiffness, Influence line
An iterative structural analysis technique that releases joints to find unbalanced moments, then distributes them in proportion to member stiffnesses and carries over fixed fractions to far ends until residual moments become negligible.
- Influence line
- Related: Moment distribution method
A diagram showing the variation of a specific response quantity, such as shear, bending moment, or deflection at a chosen section, as a unit load moves across the structure from one end to the other.
- Slenderness ratio
- Related: Effective length, Buckling
The ratio of a compression member's effective length to its least radius of gyration, indicating its susceptibility to buckling; larger values lower the permissible compressive stress in steel and concrete column design.
- Effective length
- Related: Slenderness ratio, Buckling
The equivalent pin-ended length of a compression member that would buckle at the same load as the actual member with its real end restraints, obtained by multiplying the actual length by a support-condition factor.
- Buckling
- Related: Slenderness ratio, Effective length
Sudden lateral instability of a slender member under compression when the applied load reaches a critical value, causing large deformation and possible collapse well before the material's yield strength is exhausted.
- Liquefaction
- Related: Effective stress, Standard penetration test
Loss of shear strength in saturated loose cohesionless soil during earthquake shaking, when cyclic loading raises pore water pressure until effective stress approaches zero and the soil behaves like a fluid.
- Effective stress
- Related: Liquefaction, Consolidation
The intergranular stress carried by the soil skeleton, equal to total stress minus pore water pressure; it governs compressibility, shear strength, and volume change in saturated soils.
- Consolidation
- Related: Effective stress, Void ratio
Time-dependent volume reduction of a saturated soil caused by gradual expulsion of pore water under sustained load, described by a coefficient of consolidation and a compression index derived from an oedometer test.
- Void ratio
- Related: Consolidation
The ratio of the volume of voids to the volume of solids in a soil mass, a fundamental phase parameter used to compute porosity, unit weight, and degree of saturation.
- Standard penetration test
- Related: Liquefaction
An in-situ test in which a split-spoon sampler is driven into the ground by a hammer and the blow count for a specified penetration is recorded, giving the N value used to estimate relative density and strength.
- Reynolds number
- Related: Froude number, Hydraulic jump
A dimensionless ratio of inertial forces to viscous forces in a flow, used to classify flow as laminar or turbulent and to predict transition and friction characteristics in pipes and channels.
- Froude number
- Related: Hydraulic jump, Specific energy
A dimensionless ratio of inertial forces to gravitational forces in free-surface flow, whose value relative to unity distinguishes subcritical, critical, and supercritical flow in open channels.
- Hydraulic jump
- Related: Froude number, Specific energy
An abrupt rise in water surface when a supercritical flow changes to subcritical flow, dissipating energy through turbulence and used in stilling basins below spillways and drop structures.
- Specific energy
- Related: Froude number, Hydraulic jump
The total head of flowing water measured relative to the channel bed, equal to the sum of depth and velocity head, whose minimum value at a given discharge defines critical flow conditions.
- Unit hydrograph
- Related: Infiltration, Return period
The direct runoff hydrograph resulting from one unit of effective rainfall uniformly distributed over a catchment in a specified duration, used to derive flood hydrographs for other rainfall events by superposition.
- Infiltration
- Related: Unit hydrograph
The downward entry of water into the soil surface, expressed as a rate that typically starts high under dry conditions and decays toward a constant value as the soil profile wets up.
- Return period
- Related: Unit hydrograph
The average interval in years between occurrences of a hydrologic event equaled or exceeded, equal to the reciprocal of the annual exceedance probability and used to select design flood magnitudes.
- Biochemical oxygen demand
- Related: Chemical oxygen demand, Activated sludge process
The amount of dissolved oxygen consumed by microorganisms while decomposing organic matter in a water sample over a specified incubation period, commonly five days at twenty degrees Celsius, indicating organic pollution strength.
- Chemical oxygen demand
- Related: Biochemical oxygen demand
The oxygen equivalent of organic matter in a water sample oxidized by a strong chemical agent under acidic conditions, measured rapidly and including both biodegradable and non-biodegradable matter.
- Activated sludge process
- Related: Biochemical oxygen demand
A secondary biological treatment in which sewage is aerated with a recycled microbial culture that oxidizes organic matter, followed by sedimentation; performance is controlled by solids retention time and food-to-microorganism ratio.
- Coagulation and flocculation
- Related: Sedimentation
A water treatment sequence in which a chemical coagulant neutralizes particle charges and gentle mixing promotes collisions, forming larger settleable flocs that are removed in subsequent sedimentation.
- Sedimentation
- Related: Coagulation and flocculation
Gravity settling of suspended particles in still or slowly moving water, designed using overflow rate and detention time so that particles with a given settling velocity are removed with known efficiency.
- CBR value
- Related: Flexible pavement
The California Bearing Ratio, a penetration test result expressed as a percentage of the load required to penetrate a standard crushed stone sample, used to characterize subgrade strength and design flexible pavement thickness.
- Flexible pavement
- Related: CBR value
A road structure in which load spreads gradually through successive granular and bound layers that deform elastically with the subgrade, designed by limiting vertical compressive strain and tensile strain at layer interfaces.
- Design speed
- Related: Superelevation, Sight distance
The chosen speed used to determine geometric features such as horizontal curve radius, superelevation, sight distance, and gradient, selected from terrain and road classification and generally exceeding the operating speed of most vehicles.
- Superelevation
- Related: Design speed
The transverse slope provided on a horizontal curve by raising the outer edge, which counteracts centrifugal force and is limited by friction between tyre and pavement and by comfort considerations.
- Sight distance
- Related: Design speed
The length of carriageway visible to a driver ahead, comprising stopping sight distance based on reaction time and braking distance and overtaking sight distance for two-lane roads.
- Bench mark
- Related: Reduced level, Closing error
A permanently established point whose reduced level is known with high accuracy and from which vertical differences to other points are measured during leveling surveys.
- Reduced level
- Related: Bench mark, Closing error
The elevation of a survey point expressed relative to a chosen datum, obtained by adding or subtracting successive level differences measured with a leveling instrument and staff.
- Closing error
- Related: Bench mark, Reduced level
The discrepancy between the computed and known values of a traverse or level run, such as a nonzero sum of internal angles or a mismatched final elevation, indicating measurement mistakes or accumulated random errors.
- Ground sample distance
- Related: NDVI
The distance on the ground represented by one pixel of a remotely sensed image, determined by sensor altitude, focal length, and detector size, and controlling the smallest feature that can be resolved.
- NDVI
- Related: Ground sample distance
The normalized difference vegetation index, computed from near-infrared and red reflectance as their difference divided by their sum, giving a value from minus one to plus one that indicates vegetation vigor and density.
- Critical path
- Related: Float
In a project network, the longest sequence of dependent activities from start to finish, whose duration equals the project duration and where any delay directly extends the completion date.
- Float
- Related: Critical path
The amount of time an activity can be delayed without delaying the project completion or violating a successor constraint, distinguishing total float from free float in network scheduling.
- Rate analysis
- Related: Bill of quantities
The process of determining the unit cost of a construction item by summing material, labour, plant, and overhead components per unit quantity, forming the basis of bill of quantities rates.
- Bill of quantities
- Related: Rate analysis
A tender document listing measured quantities of work items with descriptions, against which bidders quote unit rates and which forms the basis for interim payments and variations during construction.