ITI Mechanic Auto Electrical & Electronics (AITT Theory) study materials
ITI Mechanic Auto Electrical & Electronics (AITT Theory) study resources

Flooded EV, Isolation Fault and Out-of-Date Gloves

ITI Mechanic Auto Electrical & Electronics (AITT Theory) · Put your knowledge to work in context.

All case studies

Flooded EV, Isolation Fault and Out-of-Date Gloves

A 2021 battery-electric hatchback with a 355 V nominal (96-cell) pack is towed in after being parked for two hours in a flooded underground car park; water reached the lower sill. The instrument cluster displays 'Electrical system fault – stop safely' and the workshop scan tool logs P0AA6 (high-voltage system isolation fault). The workshop is a general repair garage with one technician trained to work on HV vehicles; a second technician is on site. On the shelf are Class 0 insulating gloves whose last dielectric test date was 11 months ago, one CAT III 1000 V DMM, one insulation tester with 250/500/1000 V ranges, and a 12 V test lamp. The apprentice proposes lifting the rear seat, probing the orange HV cables at the pack service disconnect with the DMM on ohms to 'find the short', and using the test lamp to check whether the cable is live before touching it. The customer wants the car back the same day.

1. Before any measurement is taken, what must be in place, and how do you prove the HV system is de-energised? State the acceptance criteria you would use.

Read the worked answer

Do not start until the conditions are met.

  • Personnel: one HV-trained technician performing the work, a second person present who can isolate and call for help. The apprentice does not probe anything.
  • PPE: Class 0 gloves in use are normally re-tested every 6 months, so 11 months means they are out of test and must not be used. Obtain in-date gloves, plus insulated tools, no metal jewellery or watch, and work single-handed where possible.
  • Area: vehicle isolated, wheel chocks, 5 m boundary with warning signs, no water on the floor (this car has just come out of a flood).
  • Instrument: CAT III 1000 V (ideally CAT IV) meter rated above the 355 V system voltage. The 12 V test lamp is not an instrument.

De-energisation sequence: ignition off, key/fob removed and kept several metres away, HV service disconnect removed, then wait the manufacturer's discharge time (typically 5–10 minutes) for the inverter capacitors.

Verification: measure HV+ to HV– and each HV rail to chassis with the CAT III meter, using the live–dead–live rule: prove the meter on a known live source, measure, then prove it again. The system is only considered safe when the reading is below the manufacturer's threshold (commonly ≤60 V DC, and often ≤5 V on newer vehicles). Because the pack has been immersed, the vehicle should not be re-energised; the pack is a thermal-event risk and should be quarantined away from the building.

2. How would you use the insulation tester to find where the isolation fault actually is, and what readings would you accept or reject?

Read the worked answer

Method (divide and conquer, working from the pack outward):

  1. With the system de-energised and the service disconnect out, separate the pack from the vehicle HV loom.
  2. Insulation-test the vehicle side first: HV+ to chassis, HV– to chassis, and HV+ to HV–. Then test the pack side the same way - only if the manufacturer permits testing the pack at that voltage.
  3. Use the manufacturer's stated test voltage; 500 V DC is common on 355 V systems. Do not apply an insulation test to ECU or inverter terminals that the manual says must be disconnected - 500 V DC can destroy low-voltage electronics.
  4. If the vehicle side reads low, reconnect the HV components one at a time (compressor, PTC heater, charger, inverter) and re-test after each. The reading that collapses when a component is connected identifies the leaking branch.

Accept/reject criteria: the common rule is ≥100 Ω per volt of system voltage, so ≥35.5 kΩ here is the absolute floor; a healthy system typically reads in the megohm range (often >10 MΩ). A reading that falls from megohms to a few hundred kilohms when one component is reconnected condemns that component (or its cable/connector - look for water tracks and green corrosion in the connector first).

Water ingress in a flooded car usually gives several parallel leakage paths, so expect more than one culprit and re-test after every repair.

3. Explain why the DMM on its ohms range and the 12 V test lamp are both unacceptable for this job.

Read the worked answer

DMM on ohms:

  • The ohms range applies only a couple of volts at microamps; it cannot characterise insulation. A leakage path of a few hundred kilohms - enough to set P0AA6 - is buried among parallel paths, semiconductor junctions and moisture films, so the number you read tells you nothing about dielectric strength.
  • It also proves nothing about whether the circuit is live. An ohmmeter connected to a live 355 V DC bus is a meter-destroying, arc-producing event.
  • Ohm checks are for continuity of a de-energised 12 V circuit, not for HV insulation.

12 V test lamp:

  • A bulb has no defined current limit and no voltage rating for 355 V. Contact with a live HV bus will vaporise the filament, sustain an arc, and present the technician with a burn/arc-blast hazard and the pack with a dead short. It is the classic way to get an HV fatality.
  • It also cannot distinguish 12 V from 300 V, so a 'no glow' result gives false confidence.

What is acceptable: a CAT III/IV meter rated for the system voltage for absence-of-voltage verification, and a dedicated insulation tester at the manufacturer's test voltage for the isolation measurement. Nothing else.