UPJEE(P) - the Uttar Pradesh Joint Entrance Examination for Polytechnic - is a state-level examination run by the Joint Entrance Examination Council, Uttar Pradesh (JEECUP), which was formed in 1986-87 to admit students to all polytechnic institutions in the state through a state-level admission test. The examination is for candidates seeking admission to government and private polytechnic colleges of Uttar Pradesh, and the council's portal covers examination, admission and eCounselling services for Session 2026. The JEECUP (UP Polytechnic) case studies are 5 cases and about 3,168 words.

1

Sizing a Solar Street-Light Pole Against a Frozen Budget

A government polytechnic in Kanpur is replacing 12 damaged street lights along its hostel lane with LED fittings. Each fitting draws 30 W and is switched on for 10 hours a night, all year.

634 words, about 3 min
2

Neutralising a Waste Acid Drum Before Drain Disposal

The first-year chemistry laboratory of a polytechnic has accumulated 5.0 L of waste hydrochloric acid left over from titration practicals; its measured pH is 2.0. College rules permit disposal through the laboratory drain only after the waste has been brought into the pH 6 to 8 band.

620 words, about 3 min
3

Is the Hostel Pump Really Undersized?

A polytechnic hostel lifts water from a ground-level sump into a 2000 litre overhead tank on the roof. The water surface in the tank stands 12 m above the sump surface, and the pipework, bends, foot valve and strainer together add friction equivalent to 3 m of head at the design flow.

640 words, about 3 min
4

Zero Error, Least Count and a Lot of 200 Pins

In workshop practice, 200 mild-steel pins of nominal diameter 12.00 mm must be inspected before assembly; the drawing allows ±0.05 mm. The store holds only two instruments: a steel rule with a least count of 0.5 mm, and a vernier caliper with a least count of 0.02 mm whose jaws, when fully closed, show a vernier reading of 0.06 mm.

630 words, about 3 min
5

How Many Drums of Distemper for the Workshop Hall?

A polytechnic must paint its workshop hall before an inspection. The hall is 20 m long, 12 m wide and 4.5 m high.

644 words, about 3 min