The JKSSB Junior Engineer (Civil) recruitment is conducted by the Jammu and Kashmir Services Selection Board, the body that advertises and selects candidates for civil posts under the Union Territory government. The post is aimed at civil engineering diploma and degree holders who want a technical position in a Jammu and Kashmir government department, and selection is through a competitive written examination. The JKSSB JE Civil case studies are 5 cases and about 3,060 words.
1M25 Cube Failure at an Overhead Tank Site
During a 28-day quality audit of an M25 reinforced-concrete overhead tank staged in Jammu, the site engineer records three cube results from the same batch: 26.4, 24.1 and 18.8 N/mm². Batch records show OPC 43 grade cement at 380 kg/m³, fly ash added at 25% of cementitious content, water/cementitious ratio entered as 0.50 in the register, and sand batched by volume from a stockpile whose moisture test on the same morning reads 6.2%.
717 words, about 4 min2RTI Reply on a ₹4.2 Crore Road Contract
On 3 March, a resident of a J&K district files an RTI application with the PIO of the PWD circle seeking the comparative statement and tender evaluation report for a ₹4.2 crore road contract awarded on 18 January. The PIO forwards the file to you, the junior engineer who prepared the evaluation, on 25 March.
626 words, about 3 min3Five Inspection Points Before the Payment Cut-off
Five inspection points on a canal-lining project must be covered on five consecutive working days, Monday to Friday, one per day: B (bridge), C (canal lining), D (drain), E (embankment) and F (filter house). The executive engineer gives you these constraints: C cannot be inspected on Monday or Friday; B must be inspected immediately before D; E is fixed for Wednesday because the concrete pour is scheduled that day; F must come after C; and D must come before E.
626 words, about 3 min4Storm-Water Drain Estimate Against a Fixed Sanction
A junior engineer prepares an estimate for a 1,250 m long open storm-water drain. Internal width is 0.60 m and internal depth is 0.90 m.
524 words, about 3 min5Editing an Inspection Note Before It Enters the Project File
Your assistant drafts the following paragraph for a site inspection note: 'The contractor has been instructed to remove all the debris from the site before 5 p.m. Neither the supervisor nor the workers was present when the inspection team arrive.
567 words, about 3 min