Maharashtra HSC NSQF Plumber General II study materials
Maharashtra HSC NSQF Plumber General II study resources

Maharashtra HSC NSQF Plumber General II study plan

Maharashtra HSC NSQF Plumber General II · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Plumbing Works and Pipe Fitting & Trade Tools, Equipment and Materials

  • Classify at least 12 pipe types (GI, CI, PVC, CPVC, HDPE, copper) by material, jointing method and typical use without notes

  • Demonstrate and label the sequence for threading, solvent-welding and compression jointing, listing the tool used at each step

  • Identify 15 trade tools and state one safety check for each before use

  • Solve 10 pipe-size and fitting-selection problems by matching nominal bore to fixture demand

Your checkpoint

A one-page tool-and-joint reference chart plus a scored 10-item pipe-selection worksheet (target 8/10)

Week 2

Plumbing Works and Pipe Fitting & Water Supply and Drainage Systems

  • Sketch and explain direct and indirect cold-water supply layouts, naming each component in flow order

  • Compare one-pipe, two-pipe and single-stack drainage systems by venting, cost and where each is suited

  • Trace a full soil-to-sewer path including traps, vent pipe, inspection chamber and gradient

  • Calculate required fall for a 12 m drain run at 1:60 and state the resulting invert levels

Your checkpoint

Two hand-drawn system diagrams (cold-water supply and single-stack drainage) with every component labelled and annotated

Week 3

Water Supply and Drainage Systems & Sanitary Fixtures, Fittings and Appliances

  • Explain overhead tank sizing, plumbing of inlet/outlet/washout and overflow, and backflow prevention

  • Match at least 10 sanitary fixtures and fittings (WC, wash basin, sink, floor trap, bib cock) to their correct trap or fitting

  • Describe correct installation heights and clearances for common fixtures with reasons

  • Diagnose three common fixture faults (running cistern, gurgling trap, leaking tap) and name the likely cause and fix

Your checkpoint

A fixture installation checklist covering 8 fixtures with mounting heights, required fittings and one common fault each

Week 4

Occupational Safety, Health and Working Environment & Maintenance, Repair and Testing

  • List personal protective equipment and site hazards for plumbing work, and match each hazard to a control

  • Explain safe handling of gas cylinders, soldering heat sources and confined-space entry

  • Sequence a hydrostatic pressure test: fill, vent air, pressurise, hold, inspect, record

  • Describe how to test a drainage line with air or water and interpret a pressure drop

Your checkpoint

A written pressure-test procedure with a sample test record sheet (line ID, test pressure, duration, result, signature)

Week 5

Drawing, Estimation and Costing & Sanitary Fixtures, Fittings and Appliances

  • Read a simple plumbing plan and produce a material take-off list for one bathroom with quantities

  • Apply unit rates to the take-off and compute a total cost including wastage allowance

  • Draw an isometric sketch of a bathroom plumbing layout from given dimensions

  • Explain how to measure pipe runs and count fittings accurately for estimation

Your checkpoint

A complete bathroom estimate: take-off table, unit-rate calculation and total cost within 10% of a self-checked figure

Week 6

Maintenance, Repair and Testing & Plumbing Works and Pipe Fitting

  • Diagnose and describe repair steps for 6 faults: burst pipe, leaking joint, blocked drain, faulty float valve, noisy pipe, low pressure

  • Explain leak-detection methods on concealed lines including isolation testing

  • Describe preventive maintenance schedules for tanks, pumps and drainage

  • Plan a safe shutdown and repair sequence for a leaking riser in an occupied building

Your checkpoint

A troubleshooting matrix of 6 faults with symptom, cause, tool, repair step and prevention for each

Week 7

Employability Skills and Entrepreneurship & Occupational Safety, Health and Working Environment

  • Explain workplace rights, duties and reporting procedures relevant to a plumbing worksite

  • Describe communication and teamwork behaviours that prevent site errors, with two concrete examples

  • Outline the steps to start a small plumbing service business: costing, pricing, licensing and record-keeping

  • Prepare answers to common employability interview questions for a plumber role

Your checkpoint

A one-page business and employability brief covering pricing method, safety responsibility and two interview answers

Week 8

Plumbing Works and Pipe Fitting & Water Supply and Drainage Systems & Sanitary Fixtures, Fittings and Appliances & Drawing, Estimation and Costing & Maintenance, Repair and Testing

  • Complete two full-length timed mock papers across all domains and score each

  • Review every wrong answer and write the correct reasoning for each

  • Revisit the three weakest domains and re-test with 15 targeted questions each

  • Confirm final recall of key formulas, gradients, test pressures and fixture heights

Your checkpoint

Two scored mock papers with a written error log and a final one-page revision sheet

Milestones

Week 2: Can explain and draw both water supply and drainage layouts from memory with all components labelled

Week 4: Scores 80% or higher on a self-made 20-question safety and pipe-fitting test

Week 6: Produces a bathroom estimate and a 6-fault troubleshooting matrix without reference notes

Week 8: Both timed mock papers scored at 70% or above, with error log completed and weak areas re-tested