Maharashtra SSC Power Consumer Energy Meter Pre-Voc/NSQF study materials
Maharashtra SSC Power Consumer Energy Meter Pre-Voc/NSQF study resources

Maharashtra SSC Power Consumer Energy Meter Pre-Voc/NSQF: Construction and Components

Maharashtra SSC Power Consumer Energy Meter Pre-Voc/NSQF · Work through your exam, one topic at a time.

All guide sections

Construction and Components

Domain 4: Construction and Components

This domain tests the parts of induction and static meters and how each part affects registration, safety and sealing.

Core rules

  • Induction meter: voltage coil with many turns of fine wire, current coil with few turns of thick wire, aluminium disc, brake magnet, register, terminal block, cover and seal.
  • The brake magnet controls disc speed; moving it changes calibration and must not be done in the field.
  • Static meter: current sensor, voltage divider, metering IC, microcontroller, EEPROM, LCD, optical port and communication module.
  • The terminal block carries supply and load; poor torque causes heating and voltage drop.
  • Seals and calibration marks are evidence of authorized adjustment.

Worked example

If the brake magnet is moved closer to the disc, eddy-current braking increases, so the disc runs slower and the meter under-registers. If the magnet is moved away, the meter runs fast. The reasoning is that braking torque depends on magnetic flux and disc speed; calibration sets the balance between driving torque and braking torque.

Traps that cost marks

  • Confusing voltage and current coils.
  • Assuming a static meter has a disc.
  • Tightening terminals without the specified torque.
  • Breaking a seal to adjust a meter in the field.
  • Ignoring a damaged terminal block that can overheat.