The MPPSC State Engineering Service (SES) Examination in Electrical Engineering is Madhya Pradesh's state-level recruitment exam for graduate engineers seeking assistant engineer and equivalent posts in state government departments. It is intended for candidates with a B.E./B.Tech or equivalent in Electrical Engineering who want a public-sector engineering career in Madhya Pradesh rather than a central-service or private-sector role. The MPPSC SES Electrical case studies are 5 cases and about 4,400 words.
1Rising Acetylene in a 10 MVA Distribution Transformer: De-rate, Monitor or Withdraw?
A 10 MVA, 33/11 kV, Dyn11 distribution transformer commissioned in 2009 supplies an industrial feeder. Peak demand has grown from 6.5 MW to 8.6 MW at 0.90 power factor, so the unit runs near nameplate for about five hours every evening.
907 words, about 5 min2Zone 2 Trip on a Healthy Parallel 220 kV Line During a Single Line-to-Ground Fault
A 220 kV double-circuit line is 92 km long, with both circuits on the same towers, solidly grounded at both ends. Each circuit has a numerical distance relay with quadrilateral characteristics and a CT ratio of 1200/1 A.
881 words, about 4 min3Capacitor Failures and Harmonic Resonance After a 250 kW Six-Pulse Drive Is Added
A plant is fed by a 1 MVA, 11/0.415 kV transformer with 6% impedance. The 415 V bus has a 400 kVAR fixed capacitor bank for power-factor correction and a 300 kW linear load.
847 words, about 4 min4Regenerative Braking Energy on a 1500 V DC Suburban Section: Timetable, Storage or Reversible Substations?
On a 1500 V DC suburban section, nine-car rakes run at three-minute headway in the peak and eight minutes off-peak. Each station stop regenerates about 2.4 kWh at the third rail, and there are 320 such regeneration events per day across the section.
894 words, about 4 min5Commissioning Certificate, Undersized Busbar and a Request to Backdate Test Records
You are the substation O&M engineer for a new 33/11 kV indoor switchgear installation that will feed a district hospital. During pre-commissioning high-voltage tests, a flashover occurred across an 11 kV busbar joint in Panel 5.
871 words, about 4 min