RBSE Sec Voc Plumbing study plan
RBSE Sec Voc Plumbing · Give each week a clear focus.
8 weeks · About 7 hours per week
Trade Fundamentals, Tools, Materials and Safety & Water Supply Systems: Pipes, Fittings and Installation
Identify and name at least 25 hand and power tools used in plumbing, stating the specific task each performs.
Classify common pipe materials (GI, CI, PVC, CPVC, HDPE, copper, PPR) by pressure rating, joining method and typical application, without notes.
Read pipe sizing tables for a simple supply layout and select correct diameters for a bathroom group and a kitchen line.
List the PPE and site-safety rules that apply before starting any pipe installation task.
Your checkpoint
A one-page tool-and-material reference sheet plus a solved pipe-sizing exercise for a two-bathroom layout, checked against sizing tables.
Water Supply Systems: Pipes, Fittings and Installation & Plumbing Fixtures, Fittings and Appliances
Draw and label a direct and an indirect cold-water supply system showing overhead tank, distribution pipe and branches.
Describe the function of gate valve, ball valve, check valve, pressure-reducing valve and air vent, and state where each is fitted.
Match at least 15 fixtures and fittings (bib cock, pillar cock, flush valve, ball float, mixing tap, shower rose) to their location and purpose.
Explain how a geyser or electric water heater is connected to the supply line, including the safety valve position.
Your checkpoint
Annotated schematic of a full house water supply system with all valves and fixtures labelled, plus a fixture-to-application matching table of 15 items.
Sanitary Drainage, Soil and Waste Systems & Sanitary Fixtures, Traps and Venting
Trace a soil and waste drainage layout from water closet to inspection chamber, naming each pipe, fitting and gradient.
Calculate the required fall for a 4-inch drain over a 12-metre run at the standard gradient.
Explain the purpose of a trap, a vent pipe, an anti-siphon arrangement and an inspection chamber, and state the code-based spacing rules you have studied.
Sketch a P-trap, an S-trap and a bottle trap and state where each is permitted or prohibited.
Your checkpoint
A scaled single-line drainage plan of a two-storey house showing stacks, vents, traps and two inspection chambers, with gradients computed and written on the drawing.
Sanitary Drainage, Soil and Waste Systems & Sanitary Fixtures, Traps and Venting & Water Storage, Tanks and Pumps
Size a domestic overhead and underground tank for a stated daily demand and justify the capacity chosen.
Compare centrifugal, submersible and jet pumps by head, application and installation position.
Describe the correct sequence for installing a pump with foot valve, suction line and pressure switch.
Explain how venting prevents trap seal loss, using the concept of air pressure equalisation in your own words.
Your checkpoint
A timed 40-question self-test covering Domains 4, 5 and 6, scored and reviewed with every wrong answer corrected in writing.
Soldering, Brazing, Welding and Pipe Joining & Trade Fundamentals, Tools, Materials and Safety
Demonstrate or describe step by step the soldering of a copper joint: cutting, deburring, fluxing, heating and applying solder.
State the correct flux, filler and temperature range for soldering versus brazing copper pipe.
List the safety precautions for hot work, including fire watch, cylinder handling and ventilation.
Explain solvent cementing of PVC and threading of GI pipe, including the number of turns and dope application.
Your checkpoint
A written joint-procedure card for four joining methods (solder, braze, solvent weld, threaded) with temperatures, materials and safety steps, plus a practice joint photo log if workshop access is available.
Drawing, Estimating, Costing and Measurement & Repair, Maintenance and Leak Detection
Take off quantities of pipe, fittings and fixtures from a given plumbing drawing and prepare a material schedule.
Compute a cost estimate including material, labour and overhead for a small bathroom installation.
Describe at least five leak-detection methods (pressure test, dye test, acoustic, moisture meter, visual inspection) and when each is used.
Outline the repair procedure for a leaking float valve, a dripping tap and a cracked PVC joint.
Your checkpoint
A complete estimate sheet for a bathroom plumbing job with quantities, rates, labour and total cost, plus a leak-repair procedure list of five methods.
Workplace Safety, Environment and Entrepreneurship & Plumbing Fixtures, Fittings and Appliances
List the statutory and site safety requirements for plumbing work, including excavation, confined space and electrical safety near water.
Describe safe handling and disposal of lead, solvent cement and asbestos-cement pipe waste.
Explain the basic elements of running a small plumbing enterprise: quotation, licence, record keeping and customer service.
Revisit fixture and appliance installation errors and state the correct practice for each.
Your checkpoint
A two-part document: a workplace safety checklist of at least 15 items and a one-page small-business start-up note covering licence, pricing and record keeping.
Trade Fundamentals, Tools, Materials and Safety & Water Supply Systems: Pipes, Fittings and Installation & Sanitary Drainage, Soil and Waste Systems & Sanitary Fixtures, Traps and Venting & Water Storage, Tanks and Pumps & Soldering, Brazing, Welding and Pipe Joining & Drawing, Estimating, Costing and Measurement & Repair, Maintenance and Leak Detection & Workplace Safety, Environment and Entrepreneurship & Plumbing Fixtures, Fittings and Appliances
Complete two full-length timed mock exams under exam conditions and score each.
Review every incorrect answer and map it back to its domain and study week.
Re-drill the two weakest domains with targeted questions until accuracy exceeds 80 percent.
Recite key numbers (gradients, trap seal depth, vent distances, tank sizing, solder temperatures) from memory.
Your checkpoint
A final revision log showing both mock scores, error-domain breakdown and a signed statement that all weak areas were re-tested above 80 percent accuracy.
Milestones
Week 2: Can draw and explain a complete cold-water supply system and correctly match 15 fixtures to their applications without notes.
Week 4: Scores at least 70 percent on the 40-question Domain 4/5/6 self-test and has corrected every wrong answer in writing.
Week 6: Produces a full material take-off and cost estimate for a bathroom job that balances and matches quantities to the drawing.
Week 8: Scores at least 80 percent on both full-length mock exams, with no domain below 70 percent.