RBSE SS Voc Construction flashcards
RBSE SS Voc Construction · Build recall with a focused review session.
34 cards. Read the term and the definition here. The deck at the top of this page is optional.
- First class brick
- A burnt clay brick with sharp edges, water absorption less than 20% by weight, and compressive strength of at least 10.5 N/mm², used for superior masonry work.
- Initial setting time of cement
- The time from adding water to the point when cement paste begins to lose plasticity; for ordinary Portland cement it must not be less than 30 minutes.
- Concrete grade M20
- Concrete with characteristic cube compressive strength of 20 N/mm² at 28 days, used for normal reinforced concrete work and tested on 150 mm cubes.
- Water-cement ratio
- The ratio of water to cement by weight in a concrete mix; lower values increase strength and durability, while excess water causes bleeding and shrinkage cracks.
- English bond
- A brick masonry bond with alternating courses of headers and stretchers, producing strong walls with no continuous vertical joints; used for walls one brick or thicker.
- Damp-proof course
- A continuous layer of waterproof material, such as cement mortar with waterproofing compound or bitumen felt, laid at plinth level to stop moisture rising into walls.
- Staircase rise and tread
- Rise is the vertical height of one step and tread is the horizontal going; typical values are rise 150-190 mm and tread 250-300 mm for comfortable use.
- Concrete cover
- The thickness of concrete between the reinforcement and the outer surface, protecting steel from corrosion and fire; typical values are 40 mm for footings and 20 mm for slabs.
- Scale 1:100
- A drawing scale where one unit on the drawing represents 100 units on the ground, so 1 cm on paper equals 1 m in reality; common for building plans.
- Hidden line
- A dashed line on a technical drawing used to show edges or features that are not visible from the viewing direction, such as embedded reinforcement or concealed openings.
- Bar bending schedule
- A table listing each reinforcement bar's mark, diameter, shape, number, cutting length, and weight, used for fabrication, checking, and payment in reinforced concrete work.
- Section drawing
- A drawing showing the internal details of a building or component as if cut by an imaginary plane, with cut surfaces hatched to indicate materials.
- Plinth area estimate
- A preliminary cost estimate calculated by multiplying the plinth area of a building by a standard plinth area rate per square metre for similar construction.
- Centre-line method
- An estimating method for walls where the total centre-line length is multiplied by breadth and depth; junction adjustments are made for wall thickness to avoid double counting.
- Bill of quantities
- A document listing items of work with descriptions, units, and quantities, used for tendering and item-rate contracts; rates are filled in by bidders to form the contract sum.
- Rate analysis
- The process of determining the unit rate of a construction item by summing material, labour, plant, overhead, and profit components per unit of work.
- Whole circle bearing
- A bearing measured clockwise from magnetic north through 360 degrees, used in compass surveying; it is converted to reduced bearing for calculations.
- Height of instrument
- In levelling, the reduced level of the line of sight of the instrument, calculated as the backsight reading added to the reduced level of the benchmark.
- 3-4-5 method
- A setting-out technique for establishing a right angle on site by forming a triangle with sides in the ratio 3:4:5, where the angle opposite the 5-unit side is 90 degrees.
- Contour line
- A line on a map joining points of equal elevation above a datum; closely spaced contours indicate steep ground and widely spaced contours indicate gentle slopes.
- Needle vibrator
- An internal concrete vibrator with a flexible shaft and vibrating needle, used to compact reinforced concrete and remove air voids; over-vibration can cause segregation.
- Sheep-foot roller
- A compaction roller with projecting feet on its drum, suitable for cohesive soils such as clay; it kneads and compacts the soil in layers.
- Safe working load
- The maximum load that a crane, hoist, sling, or scaffold is designed to carry safely under normal operating conditions, marked on the equipment and never exceeded.
- Plumb bob
- A pointed weight suspended from a string, used to check verticality of walls, columns, and formwork by aligning the string with a reference mark.
- Hierarchy of controls
- The order of risk control measures from most to least effective: elimination, substitution, engineering controls, administrative controls, and personal protective equipment.
- Excavation shoring
- Temporary support such as timber or steel bracing used to prevent collapse of excavation sides, required for depths beyond about 1.2 to 1.5 metres depending on soil.
- Silica dust hazard
- Fine dust produced by cutting, grinding, or drilling concrete and stone; inhalation can cause silicosis, so wet cutting and dust masks are required.
- Residual current device
- A safety device that quickly disconnects an electrical circuit when it detects leakage current to earth, protecting workers from electric shock on site.
- Vernier caliper least count
- The smallest measurement a vernier caliper can read, typically 0.02 mm, calculated as the difference between one main scale division and one vernier scale division.
- Tap drill size
- The diameter of the hole drilled before tapping an internal thread, approximately equal to the nominal thread diameter minus the thread pitch.
- Curing of concrete
- Keeping concrete moist after placing to allow cement hydration; at least 7 days is required, and 14 days in hot weather, to achieve design strength and durability.
- Break-even point
- The level of sales or output at which total revenue equals total cost, calculated as fixed cost divided by the difference between selling price and variable cost per unit.
- Retention money
- A percentage, typically 5-10%, withheld from each payment to a contractor until completion, to ensure defects are rectified and obligations are met.
- STAR interview method
- A technique for answering interview questions by describing the Situation, Task, Action taken, and Result achieved, giving structured and evidence-based responses.