UPMSP Vocational Plant Nursery study plan
UPMSP Vocational Plant Nursery · Give each week a clear focus.
8 weeks · About 7 hours per week
Plant Nursery Fundamentals and Nursery Layout & Plant Propagation (Seed, Vegetative, Grafting and Budding)
Sketch a to-scale nursery layout on graph paper showing propagation beds, potting yard, shade house, irrigation source, compost pit, road and drainage, and label each block with its function
Define nursery types (temporary, permanent, hi-tech) and write one line on where each fits a small Indian enterprise
List the stages of sexual propagation from seed lot to saleable seedling and mark the two stages where losses are highest
Compare seed dormancy types (physical, physiological, combined) and match each to one pre-sowing treatment such as scarification, stratification or gibberellic acid soak
Build a 20-term glossary card set covering nursery and propagation vocabulary with one Hindi equivalent per term
Your checkpoint
A labelled one-page nursery layout sketch plus a 20-term bilingual glossary
Plant Propagation (Seed, Vegetative, Grafting and Budding)
Describe vegetative propagation methods - cutting, layering, division, sucker, offset, tuber, bulb - and name one crop suited to each
Explain the role of auxin, node position, leaf area and juvenility in rooting of stem cuttings
Compare air layering, ground layering and stooling step by step, and note which is cheapest for a small nursery
Differentiate grafting from budding and list five conditions for a successful union (cambium contact, compatibility, polarity, tightness, aftercare)
Select the right budding season and rootstock for mango, guava and citrus in the local climate
Your checkpoint
A one-page method-selection table for 15 crops giving propagation method, season and expected success rate
Plant Propagation (Seed, Vegetative, Grafting and Budding) & Soil, Media, Compost and Nutrient Management
Practise at least 10 whip-and-tongue or veneer grafts and 10 T-bud or patch buds on spare rootstock, then record take percentage after three weeks
Prepare three growing media mixes (soil:sand:FYM, cocopeat-based, and soil-less) and compare water retention and cost per cubic metre
Explain composting and vermicomposting steps, carbon-to-nitrogen ratio, turning schedule and maturity signs
Calculate a fertilizer dose for a nursery bed from NPK percentage and area, and interpret a soil test report
List symptoms of nitrogen, phosphorus, potassium, iron and zinc deficiency in nursery seedlings and the quick correction for each
Your checkpoint
A grafting and budding practice log with take percentage and a costed media comparison sheet for three mixes
Soil, Media, Compost and Nutrient Management & Irrigation, Drainage and Nursery Water Management
Design a weekly fertigation or drench schedule for a 1,000-seedling batch from germination to dispatch
Compare overhead sprinkler, drip, capillary mat and hand watering for water use, disease risk and labour
Diagnose waterlogging, salt burn and drought stress from leaf and root symptoms and state the corrective action
Calculate irrigation requirement from evapotranspiration, pot size and plant stage, and check drainage slope and outlet placement in a nursery layout
Test irrigation water pH, electrical conductivity and hardness and decide if treatment is needed
Your checkpoint
A 4-week irrigation and nutrient schedule sheet with water-quality test values and corrective notes
Nursery Structures, Tools and Equipment & Pest, Disease and Weed Management in Nurseries
Identify nursery structures - shade net house, polyhouse, mist chamber, lath house, cold frame, hardening area - and state the shade percentage and use of each
Match 15 tools and equipment (secateurs, grafting knife, khurpi, sieve, sprayer, wheelbarrow, pH meter) to their task and maintenance routine
Explain sanitation and sterilisation of tools, media and trays as the first line of disease control
Describe integrated pest management for five common nursery pests - aphid, whitefly, thrips, mealybug, mite - with monitoring, biological and chemical options
Distinguish damping-off, powdery mildew, leaf spot and root rot by symptom, causal agent and control measure
Plan a weed management calendar combining hand weeding, mulching, stale seedbed and herbicide safety
Your checkpoint
A pest, disease and weed identification chart of 12 entries with symptom, cause, threshold and control
Pest, Disease and Weed Management in Nurseries & Ornamental, Fruit and Forest Plant Production
List 10 ornamental plants with season, propagation method and pot size for sale
Plan a 12-month production calendar for three fruit crops (mango, guava, citrus) covering sowing, grafting, hardening and dispatch
Select and describe 10 forest and avenue species for nursery production, noting seed treatment and root-shoot ratio at dispatch
Explain hardening of seedlings and its effect on field survival, with a 7-day hardening protocol
Apply integrated pest management decisions to a written pest scenario using threshold, beneficials and safe pesticide choice
Your checkpoint
A 12-month crop production calendar plus a 30-plant catalogue with botanical name, family, propagation method and sale season
Post-Harvest Handling, Packing and Marketing of Nursery Stock & Entrepreneurship, Record Keeping and Nursery Business Management
Describe lifting, grading, root pruning, bare-root versus polybag dispatch and the care needed at each step
Design packaging for seedlings and grafts that survives transport, and label it with species, grade, batch and date
Calculate cost of production per plant including media, seed, labour, water and depreciation, and set a selling price with margin
Draft a simple set of nursery records - mother stock register, propagation register, sales register, input and wage register
List licensing, plant quarantine and certification requirements for selling nursery stock, and outline a basic marketing channel mix
Your checkpoint
A costed one-page business model for a 2,000-plant nursery with a sample sales and propagation register
Plant Nursery Fundamentals and Nursery Layout & Plant Propagation (Seed, Vegetative, Grafting and Budding) & Soil, Media, Compost and Nutrient Management & Irrigation, Drainage and Nursery Water Management & Nursery Structures, Tools and Equipment & Pest, Disease and Weed Management in Nurseries & Ornamental, Fruit and Forest Plant Production & Post-Harvest Handling, Packing and Marketing of Nursery Stock & Entrepreneurship, Record Keeping and Nursery Business Management
Revise all nine domains using the glossary, charts, calendars and registers built in weeks 1 to 7
Attempt two timed full-length mock tests and mark weak domains from the score breakdown
Re-practise the two weakest propagation or media calculations until solved without notes
Summarise each domain on a single revision card with the five most examinable facts
Your checkpoint
Nine one-page revision cards plus a mock-test score log with a named weak-area action list
Milestones
Week 2: Can name the propagation method, season and success rate for 15 crops without notes, and has completed at least 10 grafting and 10 budding attempts with recorded take percentage
Week 4: Can calculate a fertilizer dose and an irrigation requirement from given figures and explain three water-stress diagnoses correctly
Week 6: Can identify 12 pest, disease and weed problems from written symptom descriptions and state a control measure for each
Week 8: Scores at least 70 percent on two full-length mock tests with no domain below 50 percent, and holds all nine revision cards