UPMSP Vocational Plant Nursery study materials
UPMSP Vocational Plant Nursery study resources

UPMSP Vocational Plant Nursery study plan

UPMSP Vocational Plant Nursery · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Plant Nursery Fundamentals and Nursery Layout & Plant Propagation (Seed, Vegetative, Grafting and Budding)

  • Sketch a to-scale nursery layout on graph paper showing propagation beds, potting yard, shade house, irrigation source, compost pit, road and drainage, and label each block with its function

  • Define nursery types (temporary, permanent, hi-tech) and write one line on where each fits a small Indian enterprise

  • List the stages of sexual propagation from seed lot to saleable seedling and mark the two stages where losses are highest

  • Compare seed dormancy types (physical, physiological, combined) and match each to one pre-sowing treatment such as scarification, stratification or gibberellic acid soak

  • Build a 20-term glossary card set covering nursery and propagation vocabulary with one Hindi equivalent per term

Your checkpoint

A labelled one-page nursery layout sketch plus a 20-term bilingual glossary

Week 2

Plant Propagation (Seed, Vegetative, Grafting and Budding)

  • Describe vegetative propagation methods - cutting, layering, division, sucker, offset, tuber, bulb - and name one crop suited to each

  • Explain the role of auxin, node position, leaf area and juvenility in rooting of stem cuttings

  • Compare air layering, ground layering and stooling step by step, and note which is cheapest for a small nursery

  • Differentiate grafting from budding and list five conditions for a successful union (cambium contact, compatibility, polarity, tightness, aftercare)

  • Select the right budding season and rootstock for mango, guava and citrus in the local climate

Your checkpoint

A one-page method-selection table for 15 crops giving propagation method, season and expected success rate

Week 3

Plant Propagation (Seed, Vegetative, Grafting and Budding) & Soil, Media, Compost and Nutrient Management

  • Practise at least 10 whip-and-tongue or veneer grafts and 10 T-bud or patch buds on spare rootstock, then record take percentage after three weeks

  • Prepare three growing media mixes (soil:sand:FYM, cocopeat-based, and soil-less) and compare water retention and cost per cubic metre

  • Explain composting and vermicomposting steps, carbon-to-nitrogen ratio, turning schedule and maturity signs

  • Calculate a fertilizer dose for a nursery bed from NPK percentage and area, and interpret a soil test report

  • List symptoms of nitrogen, phosphorus, potassium, iron and zinc deficiency in nursery seedlings and the quick correction for each

Your checkpoint

A grafting and budding practice log with take percentage and a costed media comparison sheet for three mixes

Week 4

Soil, Media, Compost and Nutrient Management & Irrigation, Drainage and Nursery Water Management

  • Design a weekly fertigation or drench schedule for a 1,000-seedling batch from germination to dispatch

  • Compare overhead sprinkler, drip, capillary mat and hand watering for water use, disease risk and labour

  • Diagnose waterlogging, salt burn and drought stress from leaf and root symptoms and state the corrective action

  • Calculate irrigation requirement from evapotranspiration, pot size and plant stage, and check drainage slope and outlet placement in a nursery layout

  • Test irrigation water pH, electrical conductivity and hardness and decide if treatment is needed

Your checkpoint

A 4-week irrigation and nutrient schedule sheet with water-quality test values and corrective notes

Week 5

Nursery Structures, Tools and Equipment & Pest, Disease and Weed Management in Nurseries

  • Identify nursery structures - shade net house, polyhouse, mist chamber, lath house, cold frame, hardening area - and state the shade percentage and use of each

  • Match 15 tools and equipment (secateurs, grafting knife, khurpi, sieve, sprayer, wheelbarrow, pH meter) to their task and maintenance routine

  • Explain sanitation and sterilisation of tools, media and trays as the first line of disease control

  • Describe integrated pest management for five common nursery pests - aphid, whitefly, thrips, mealybug, mite - with monitoring, biological and chemical options

  • Distinguish damping-off, powdery mildew, leaf spot and root rot by symptom, causal agent and control measure

  • Plan a weed management calendar combining hand weeding, mulching, stale seedbed and herbicide safety

Your checkpoint

A pest, disease and weed identification chart of 12 entries with symptom, cause, threshold and control

Week 6

Pest, Disease and Weed Management in Nurseries & Ornamental, Fruit and Forest Plant Production

  • List 10 ornamental plants with season, propagation method and pot size for sale

  • Plan a 12-month production calendar for three fruit crops (mango, guava, citrus) covering sowing, grafting, hardening and dispatch

  • Select and describe 10 forest and avenue species for nursery production, noting seed treatment and root-shoot ratio at dispatch

  • Explain hardening of seedlings and its effect on field survival, with a 7-day hardening protocol

  • Apply integrated pest management decisions to a written pest scenario using threshold, beneficials and safe pesticide choice

Your checkpoint

A 12-month crop production calendar plus a 30-plant catalogue with botanical name, family, propagation method and sale season

Week 7

Post-Harvest Handling, Packing and Marketing of Nursery Stock & Entrepreneurship, Record Keeping and Nursery Business Management

  • Describe lifting, grading, root pruning, bare-root versus polybag dispatch and the care needed at each step

  • Design packaging for seedlings and grafts that survives transport, and label it with species, grade, batch and date

  • Calculate cost of production per plant including media, seed, labour, water and depreciation, and set a selling price with margin

  • Draft a simple set of nursery records - mother stock register, propagation register, sales register, input and wage register

  • List licensing, plant quarantine and certification requirements for selling nursery stock, and outline a basic marketing channel mix

Your checkpoint

A costed one-page business model for a 2,000-plant nursery with a sample sales and propagation register

Week 8

Plant Nursery Fundamentals and Nursery Layout & Plant Propagation (Seed, Vegetative, Grafting and Budding) & Soil, Media, Compost and Nutrient Management & Irrigation, Drainage and Nursery Water Management & Nursery Structures, Tools and Equipment & Pest, Disease and Weed Management in Nurseries & Ornamental, Fruit and Forest Plant Production & Post-Harvest Handling, Packing and Marketing of Nursery Stock & Entrepreneurship, Record Keeping and Nursery Business Management

  • Revise all nine domains using the glossary, charts, calendars and registers built in weeks 1 to 7

  • Attempt two timed full-length mock tests and mark weak domains from the score breakdown

  • Re-practise the two weakest propagation or media calculations until solved without notes

  • Summarise each domain on a single revision card with the five most examinable facts

Your checkpoint

Nine one-page revision cards plus a mock-test score log with a named weak-area action list

Milestones

Week 2: Can name the propagation method, season and success rate for 15 crops without notes, and has completed at least 10 grafting and 10 budding attempts with recorded take percentage

Week 4: Can calculate a fertilizer dose and an irrigation requirement from given figures and explain three water-stress diagnoses correctly

Week 6: Can identify 12 pest, disease and weed problems from written symptom descriptions and state a control measure for each

Week 8: Scores at least 70 percent on two full-length mock tests with no domain below 50 percent, and holds all nine revision cards