WBBSE Madhyamik Telecom (Vocational) study materials
WBBSE Madhyamik Telecom (Vocational) study resources

WBBSE Madhyamik Telecom (Vocational) study plan

WBBSE Madhyamik Telecom (Vocational) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Introduction to Telecom and Communication Systems

  • Define communication and state the three essential elements (transmitter, channel, receiver) plus noise, giving one everyday Indian telecom example of each.

  • Classify signal modes as simplex, half-duplex and full-duplex, and sketch one real example of each (e.g. TV broadcast, walkie-talkie, telephone call).

  • Convert between frequency, wavelength and time period for five given values (e.g. 900 MHz, 2.4 GHz, 1,550 nm) showing full working.

  • Label the parts of a telephone instrument (microphone, earpiece, hook switch, dial pad, ringer, hybrid) and state the function of each in one line.

  • Distinguish baseband from broadband transmission and list the bandwidth units Hz, kHz, MHz and GHz with one telecom use for each range.

Your checkpoint

A single A4 handwritten sheet carrying the labelled communication-system block diagram, a three-row signal-mode table, and five solved frequency–wavelength conversions, self-scored against the textbook at 90% or better.

Week 2

Telecom Network Fundamentals: Switching, Transmission and Optical Fibre

  • Compare circuit, message and packet switching, giving one advantage, one disadvantage and one suitable service (voice, telegraph-style data, internet data) for each.

  • Trace a local call from the subscriber loop through the line circuit, switching matrix and trunk to the destination exchange, naming every stage in order.

  • Explain PCM as sample → quantise → encode, then calculate the 8 kHz sampling rate for a 4 kHz voice channel and the resulting 64 kbps bit rate at 8 bits per sample.

  • Classify transmission media as guided (twisted pair, coaxial, optical fibre) or unguided (radio, microwave), listing typical bandwidth and one deployment use for each.

  • Explain FDM, TDM and WDM with one worked example each of how multiple channels share a single medium.

Your checkpoint

A one-page comparison table of switching types and media plus a fully worked PCM calculation sheet (sampling rate, bits per sample, bit rate, and one TDM frame sketch).

Week 3

Telecom Network Fundamentals: Switching, Transmission and Optical Fibre

  • Draw and label the core, cladding, buffer and outer jacket of an optical fibre, and explain total internal reflection with a ray diagram at the core–cladding boundary.

  • Distinguish step-index from graded-index fibre and single-mode from multimode fibre, stating typical core diameter and one application for each.

  • List two optical sources (LED, laser diode) and two detectors (PIN, APD), and give one selection criterion for choosing between them.

  • Identify four causes of optical loss (absorption, Rayleigh scattering, bending, connector/splice loss) and explain why loss is measured in dB and power in dBm.

  • Compute a simple link power budget: transmitter output minus fibre, splice and connector losses must stay above receiver sensitivity.

Your checkpoint

A labelled fibre cross-section with ray diagram plus one solved link-budget problem showing margin in dB and a written pass/fail conclusion.

Week 4

Mobile and Wireless Communication Technologies

  • Explain the cellular concept - cell, cluster, frequency reuse, handoff and roaming - and sketch a 7-cell reuse pattern with channel groups marked.

  • Compare 1G to 5G in a table covering approximate launch decade, access technology, typical peak data rate and one representative service.

  • Draw the GSM architecture (MS = SIM + ME, BTS, BSC, MSC, HLR, VLR) and state the function of each block without notes.

  • Differentiate FDMA, TDMA, CDMA and OFDMA by how they divide the resource, and give one trade-off of each.

  • Explain path loss, fading and co-channel interference in radio propagation, and name three mitigation techniques such as antenna diversity, power control and sectorisation.

Your checkpoint

A hand-drawn GSM architecture diagram plus a 1G–5G comparison table, checked closed-book against notes with at least 90% of cells correct.

Week 5

Internet, Data Communication and Broadband Services & Customer Service and Telecom Operations

  • Map the seven OSI layers to the four-layer TCP/IP model and place HTTP, TCP, IP and Ethernet at their correct layer.

  • Convert three given IPv4 addresses to binary, identify the address class, and explain in three lines why NAT is used in home broadband.

  • Compare ADSL, cable, FTTH and 4G/5G fixed wireless on medium, typical download speed and one practical limitation each.

  • Trace a web page request end-to-end through DNS lookup, home router with NAT, ISP network and HTTP server, drawing it as a labelled flow diagram.

  • Apply a complaint-handling flow (receive, log, diagnose, escalate, resolve, close, follow-up) to two written customer scenarios and calculate MTTR and ARPU from supplied figures.

Your checkpoint

One labelled end-to-end internet access diagram plus two written complaint scenarios with correct MTTR and ARPU calculations, scored against a 10-point self-rubric.

Week 6

Telecom Equipment, Installation and Maintenance

  • Identify at least twelve items in a telecom technician's toolkit (crimping tool, punch-down tool, OTDR, optical power meter, fusion splicer, multimeter, earth tester, cable stripper) and state each one's use.

  • Terminate an RJ-45 plug on Cat 5e/6 cable using T568B colour sequence and verify continuity/pin-out with a LAN tester or a paper pin-out check.

  • Write a step-by-step fibre connector and splice procedure checklist, including inspection and cleaning of the ferrule before mating.

  • Diagnose five fault symptoms - no dial tone, slow broadband, fibre link down, dead battery bank, earthing fault - naming the likely cause and the first-line test for each.

  • Draft a preventive maintenance schedule for an exchange or BTS site, separating daily, weekly, monthly and quarterly tasks.

Your checkpoint

A five-row fault-diagnosis table (symptom, likely cause, test, corrective action) plus a T568B wiring sketch verified pin-by-pin, plus the written maintenance schedule.

Week 7

Occupational Safety, Health and Environment in Telecom & Employability, Entrepreneurial and Soft Skills

  • Identify telecom workplace hazards - electrical shock, RF radiation near antennas, work at height, glass fibre splinters, battery acid - and state one control measure for each.

  • Describe correct use of PPE (helmet, full-body harness, insulating gloves, goggles) and the safe procedure for ladder and mast work.

  • Explain the purpose of equipment earthing and surge protection, and describe first aid for electric shock and for a fibre splinter in the eye or skin.

  • State the accident reporting chain and explain what a material safety data sheet (MSDS) tells a technician handling battery electrolyte.

  • Draft a one-page CV and deliver a 60-second self-introduction for a telecom technician role, naming three customer-facing soft skills with a workplace example each.

Your checkpoint

A one-page site safety checklist for a BTS/telecom installation site plus a one-page CV draft, both reviewed against a checklist of required items.

Week 8

Introduction to Telecom and Communication Systems & Telecom Network Fundamentals: Switching, Transmission and Optical Fibre & Mobile and Wireless Communication Technologies & Internet, Data Communication and Broadband Services & Telecom Equipment, Installation and Maintenance & Customer Service and Telecom Operations & Occupational Safety, Health and Environment in Telecom & Employability, Entrepreneurial and Soft Skills

  • Complete two full-length timed mock papers of 90 minutes covering all eight domains and re-work every wrong answer to the correct reasoning.

  • Redraw from memory the three highest-yield diagrams: communication system block diagram, GSM architecture, and fibre cross-section with total internal reflection.

  • Recall key figures on demand: 8 kHz sampling and 64 kbps PCM, 7-cell reuse, 32-bit IPv4 versus 128-bit IPv6, T568B pin order, and dB versus dBm.

  • Compress the whole syllabus into a one-page formula and terminology sheet that you can revise in ten minutes.

  • Role-play one customer complaint call and answer a five-minute viva on site safety, scoring yourself on clarity and correctness.

Your checkpoint

Two completed mock papers scoring at least 75% each, plus a one-page personal revision sheet of formulas, diagrams and key numbers.

Milestones

Week 3: Closed-book recall test of 20 items on Domains 1–2 (signal modes, PCM numbers, switching types, fibre structure and loss): score 80% or above before moving to mobile technologies.

Week 4: Draw the GSM architecture and the 7-cell reuse pattern from memory and fill the 1G–5G table with no notes; at least 9 of 10 rows and all architecture blocks correct.

Week 6: Correctly diagnose 4 of 5 given fault symptoms and produce a pin-accurate T568B termination; any missed item is re-tested in week 7.

Week 8: Both timed mock papers scored at 75% or higher overall with no domain below 60%; weak domains are listed for final-day revision.