WBCHSE Costing & Taxation study materials
WBCHSE Costing & Taxation study resources

WBCHSE Costing & Taxation key terms

WBCHSE Costing & Taxation · Get comfortable with the vocabulary.

Cost centre

A location, person, or item of equipment for which costs are separately collected and recorded. It lets management assign responsibility and measure the cost of a specific activity or function.

Related: Profit centre, Cost unit
Cost unit

The quantitative basis used to express the cost of a product or service, such as one tonne of steel or one passenger-kilometre. Choosing a suitable unit makes costs comparable across periods and volumes.

Related: Cost centre, Prime cost
Prime cost

The total of direct material, direct labour, and direct expenses incurred to make a product. It represents costs that can be traced directly to the cost unit without apportionment.

Related: Direct expense, Works cost
Works cost

Prime cost plus factory or works overheads. It shows the total cost incurred inside the production function before administration, selling, and distribution costs are added.

Related: Prime cost, Factory overhead
Direct expense

An expense other than direct material or direct labour that is incurred specifically for a particular cost unit, such as hire of a special machine for one contract. It forms part of prime cost.

Related: Prime cost, Cost unit
Profit centre

A responsibility centre whose performance is measured by both the costs it incurs and the revenue it earns. Managers are judged on the margin or profit generated by their segment.

Related: Cost centre
Economic order quantity

The purchase quantity that minimises the combined annual cost of ordering and holding inventory. At this point, ordering cost and carrying cost are equal, so total relevant cost is lowest.

Related: Carrying cost, Reorder level
Reorder level

The inventory balance at which a fresh purchase order must be placed so that stock does not run out before the new consignment arrives. It depends on maximum usage and maximum lead time.

Related: Economic order quantity, Lead time
Lead time

The interval between raising a purchase order and receiving the materials into stores. It is used with consumption rates to fix reorder levels and safety stock.

Related: Reorder level, Safety stock
Safety stock

Extra inventory held to cover unexpected delays in delivery or sudden rises in consumption. It protects production from stock-outs but increases carrying cost.

Related: Reorder level, Carrying cost
Carrying cost

The cost of holding inventory, including storage, insurance, obsolescence, and the interest on funds tied up in stock. It usually rises in proportion to the average quantity held.

Related: Economic order quantity, Safety stock
FIFO method

A pricing rule for material issues that assumes the oldest stock is consumed first. Issues are valued at the earliest purchase prices, leaving recent prices in closing inventory.

Related: Weighted average method, LIFO method
Weighted average method

A pricing rule that values issues at a rate recalculated after each receipt, dividing total value of stock by total quantity. It smooths out price fluctuations over the period.

Related: FIFO method
LIFO method

A pricing rule that assumes the latest stock received is issued first. Issues are charged at recent prices, so closing inventory is valued at older prices; it is not permitted under Indian accounting standards.

Related: FIFO method
Bin card

A record kept at each storage bin showing quantities received, issued, and on hand. It tracks quantity only, while the stores ledger also records value.

Related: Stores ledger, Stock turnover ratio
Stores ledger

A record maintained for each material item showing receipts, issues, and balance in both quantity and value. It is kept in the costing department, separate from the bin card.

Related: Bin card
Time rate system

A wage system that pays workers a fixed rate per hour or day worked, irrespective of output. It suits work where quality matters more than speed or output cannot be measured easily.

Related: Piece rate system, Labour turnover
Piece rate system

A wage system that pays a fixed amount for each unit produced, so earnings vary directly with output. It rewards speed but may encourage careless work and ignores waiting time.

Related: Time rate system, Halsey plan
Halsey plan

An incentive scheme that pays a guaranteed time wage plus a bonus of half the time saved, valued at the time rate. It shares the benefit of efficiency between worker and employer.

Related: Rowan plan, Piece rate system
Rowan plan

An incentive scheme that pays a bonus equal to time taken divided by standard time, multiplied by time saved and the time rate. The bonus is capped as time saved grows.

Related: Halsey plan
Labour turnover

The rate at which workers leave and are replaced during a period, usually expressed as a percentage of average workforce. High turnover signals recruitment, training, and morale problems.

Related: Idle time, Time rate system
Idle time

Paid time during which a worker produces no output because of machine breakdown, material shortage, or other causes. Normal idle time is treated as overhead, while abnormal idle time is charged to profit and loss.

Related: Labour turnover, Overhead absorption
Overhead absorption

The process of charging indirect costs to cost units using a predetermined rate, such as a rate per labour hour or per machine hour. It converts pooled overheads into product cost.

Related: Apportionment, Under-absorption
Apportionment

The distribution of an overhead cost among several cost centres on a reasonable basis, such as floor area for rent or machine hours for power. It applies where a cost serves more than one centre.

Related: Allocation, Overhead absorption
Allocation

The direct charging of an entire overhead cost to a single cost centre because the cost is wholly attributable to it. No sharing between centres is involved.

Related: Apportionment
Under-absorption

The situation where overhead recovered through predetermined rates is less than the overhead actually incurred. The shortfall is usually written off to profit and loss or carried forward.

Related: Overhead absorption, Over-absorption
Over-absorption

The situation where overhead recovered through predetermined rates exceeds the overhead actually incurred. The excess is credited to profit and loss or adjusted in the next period.

Related: Under-absorption
Cost sheet

A statement that assembles prime cost, works cost, cost of production, and cost of sales for a period in a standard format. It helps fix selling prices and compare actual costs with estimates.

Related: Prime cost, Works cost
Cost of goods sold

The cost of units actually sold during a period, calculated as opening finished stock plus cost of production minus closing finished stock. It excludes selling and distribution costs.

Related: Cost sheet, Cost of production
Cost of production

Works cost plus administration overheads, adjusted for opening and closing work-in-progress. It represents the cost of goods completed and ready for sale.

Related: Works cost, Cost of goods sold
Job costing

A method of costing used where work is carried out to customer order in distinct, identifiable jobs. Costs are collected against each job number, often using a job cost sheet.

Related: Batch costing, Contract costing
Contract costing

A method used for large, long-duration projects such as construction, where each contract is a separate cost unit. Revenue and profit are recognised by stage of completion.

Related: Job costing, Notional profit
Notional profit

The difference between the value of work certified plus work uncertified and the cost incurred to date on an incomplete contract. Only a prudent portion is transferred to profit and loss.

Related: Contract costing, Work certified
Work certified

The value of work completed on a contract and approved by the customer's surveyor or architect. It forms the basis for progress payments to the contractor.

Related: Notional profit, Contract costing
Normal loss

The unavoidable loss of input expected in a process under normal operating conditions. It is absorbed by the good output, raising the effective cost per unit.

Related: Abnormal loss, Equivalent production
Abnormal loss

Loss in a process that exceeds the normal level and is not expected in ordinary operations. It is valued at full cost and written off to profit and loss.

Related: Normal loss
Equivalent production

The conversion of partly finished units into an equivalent number of fully completed units, based on degree of completion. It allows correct valuation of work-in-progress in process costing.

Related: Normal loss
Reconciliation statement

A statement that explains the difference between profit shown by cost accounts and profit shown by financial accounts. It lists items recorded in one set of books but not the other.

Related: Notional cost, Overhead absorption
Notional cost

A cost included in cost accounts for comparison or decision-making that involves no actual cash outlay, such as notional rent on owned premises. It is excluded from financial accounts.

Related: Reconciliation statement
Residential status

The classification of a taxpayer as resident or non-resident for a financial year, determined by days of stay and other tests. It decides the scope of income taxable in India.

Related: Basic exemption limit, Total income
Previous year

The financial year in which income is earned and which immediately precedes the assessment year. Income of the previous year is taxed in the following assessment year.

Related: Assessment year, Residential status
Assessment year

The twelve-month period beginning on 1 April in which the income of the preceding previous year is assessed and taxed. For income earned in 2024-25, it is 2025-26.

Related: Previous year
Total income

The sum of income under all heads after applying permissible deductions, rounded off as required. Tax liability is computed on this figure using the applicable slab rates.

Related: Deduction under section 80C, Basic exemption limit
Basic exemption limit

The threshold of total income up to which no income tax is payable by an individual. Income above it is taxed at slab rates, and it also affects rebate eligibility.

Related: Total income, Residential status
Deduction under section 80C

A deduction available to individuals and Hindu undivided families for specified investments and payments, such as provident fund and life insurance premiums, within an overall ceiling. It reduces total income.

Related: Total income