InterNACHI Septic study materials
InterNACHI Septic study resources

InterNACHI Septic study plan

InterNACHI Septic · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Septic system components and how they work

  • Diagram a complete conventional gravity septic system from house stub-out to drainfield, labeling every component in flow order

  • Explain the function of the baffles, inlet and outlet tees, and the clear space and scum layers, and state what each protects

  • Distinguish between conventional gravity, pressure distribution, and mound or aerobic unit configurations by their component differences

  • Calculate required tank liquid capacity for a three-bedroom home using the common 1,000-gallon minimum plus per-bedroom allowance rule and note where local rules override it

Your checkpoint

A hand-drawn or digital system diagram with a one-paragraph written explanation of each labeled component, self-graded against a 10-item checklist you write

Week 2

Septic system components and how they work & Defects, failure indicators, and remediation

  • Trace how a blocked outlet baffle or a saturated drainfield produces the same backup symptom at the fixture, and list two checks that separate the two causes

  • Identify the visual and operational differences between a distribution box, a dosing chamber, and a pump vault

  • List the failure indicators visible at the tank lid, the ground surface, and the house plumbing, and rank them by how urgently they point to system failure

  • Describe what a riser, an effluent filter, and a tank inlet inspection port each add to inspectability

Your checkpoint

A two-column symptom-to-cause table with at least 12 rows, each row naming the observation and the most likely defect

Week 3

Site evaluation, soils, and drainfield/absorption area

  • Describe the soil profile evaluation steps performed during a site and soil assessment, from test pit excavation to horizon description

  • Interpret soil texture by ribbon and feel methods and state which textures are acceptable for an absorption area and which are not

  • Explain how depth to a limiting condition such as bedrock, seasonal high water table, or a fragipan constrains drainfield siting

  • Explain how slope, setback distances, and landscape position affect where an absorption area can legally and practically be placed

Your checkpoint

A one-page site evaluation worksheet you design, listing every field observation a candidate should record at a soil test pit

Week 4

Site evaluation, soils, and drainfield/absorption area

  • Compare trench, bed, and mound absorption area layouts by footprint, loading rate assumptions, and site constraints

  • Describe how a drainfield is sized from daily design flow and the soil application rate, and work two example calculations

  • Explain the purpose of a reserve or replacement area and how its presence is verified at inspection

  • Identify grading and drainage defects around an absorption area that shorten its life, and describe the correction for each

Your checkpoint

Two worked sizing calculations with all inputs, units, and assumptions shown, plus a sketch of a trench layout and a mound layout side by side

Week 5

Inspection procedures, safety, and reporting

  • Sequence a full inspection from records review through tank lid access, tank interior observation, and drainfield area walkover

  • List the personal protective equipment and confined-space cautions that apply when a tank lid is opened, and state what an inspector must never do

  • Describe safe and defensible methods for checking tank liquid levels, measuring scum and sludge thickness, and testing baffle integrity

  • Draft report language that separates observed facts, probable cause, and recommended action without overstating certainty

  • Identify the records and documents an inspector should request before arriving on site

Your checkpoint

A complete sample inspection report for a fictional property, including a findings section, a limitations statement, and three prioritized recommendations

Week 6

Operation, maintenance, and homeowner education

  • Explain the sludge and scum accumulation process and state the conditions that justify more frequent pumping than the usual three-to-five-year guidance

  • Build a homeowner maintenance calendar covering pumping, effluent filter cleaning, water use habits, and what never to flush or pour down the drain

  • Explain why additives, harsh cleaners, and garbage disposals affect biological treatment and system longevity

  • Describe how to explain inspection findings to a homeowner in plain language, including how to frame a recommendation without causing panic or false reassurance

Your checkpoint

A one-page homeowner education handout covering maintenance intervals, warning signs, and prohibited practices

Week 7

Defects, failure indicators, and remediation

  • Classify defects by severity into safety hazard, active failure, marginal condition, and maintenance item, with a defensible example of each

  • Diagnose the common failure modes including hydraulic overload, biomat clogging, broken laterals, crushed pipe, root intrusion, and a failed pump or float switch

  • Describe remediation options from repair to full replacement, and state the site and permit conditions that make each option viable

  • Explain how a failed system affects real estate transactions and what an inspector's role is and is not in that process

Your checkpoint

A defect catalog of at least 15 entries, each with severity class, typical cause, and recommended remediation

Week 8

Septic system components and how they work & Site evaluation, soils, and drainfield/absorption area & Inspection procedures, safety, and reporting & Operation, maintenance, and homeowner education & Defects, failure indicators, and remediation

  • Answer 100 or more practice questions across all five domains and log every miss by domain and by root cause

  • Re-teach your three weakest sub-topics from your own notes without consulting reference material

  • Rehearse a 20-minute verbal walkthrough of an inspection, from arrival to report delivery, for a peer or a recording

  • Review every deliverable from weeks 1 through 7 and correct any factual errors you find

Your checkpoint

A scored practice test log with a remediation note for each missed question and a final one-page summary sheet of the facts you most often got wrong

Milestones

Week 2: Can explain, without notes, how a system works from house to drainfield and name the most likely cause of a backup given two different sets of observations

Week 4: Can complete a soil and site evaluation worksheet and size a drainfield from design flow and application rate with correct units

Week 6: Can produce a defensible inspection report and a homeowner handout that a non-expert could act on

Week 8: Scores 80 percent or higher on a 100-question mixed-domain practice test, with no single domain below 70 percent