IRM International Certificate study materials
IRM International Certificate study resources

IRM International Certificate cheat sheet

IRM International Certificate · Keep the key ideas within reach.

Quick reference

Principles of Risk and Risk Management

  • Risk is the effect of uncertainty on objectives; effects are deviations from the expected, positive or negative, and objectives can be strategic, operational, financial or compliance-related.

  • ISO 31000 defines risk as the effect of uncertainty on objectives; the older probability-times-consequence view (ISO Guide 73) is a measurable special case, not the general definition.

  • Risk management is coordinated activities to direct and control an organisation with regard to risk; the framework provides the foundations and arrangements, while the process is applied to individual risks.

  • The ISO 31000 process steps in order are: establishing scope, context and criteria; risk identification; risk analysis; risk evaluation; risk treatment; and monitoring and review with recording and reporting throughout.

  • Inherent risk is assessed before controls; residual risk after controls; target risk is the level the organisation is willing to accept, and the gap between residual and target drives treatment decisions.

  • Risk appetite is the amount and type of risk an organisation is willing to pursue or retain; risk tolerance is the acceptable variation around that appetite, often expressed as measurable thresholds or limits.

  • Risk attitude is the organisation's approach to assessing and eventually pursuing, retaining, taking on or turning away from risk; it is influenced by conscious and subconscious biases.

  • Three lines model: the first line owns and manages risk in the business, the second line provides oversight, guidance and challenge, the third line (internal audit) provides independent assurance.

  • Uncertainty has two dimensions: aleatory (irreducible randomness or variability) and epistemic (reducible lack of knowledge); only epistemic uncertainty can be reduced by gathering information.

Quick reference

Practice of Risk Management

  • Risk identification techniques include brainstorming, structured interviews, Delphi, SWIFT (structured what-if), HAZOP, FMEA, fault tree and event tree analysis, scenario analysis and bow-tie analysis.

  • The risk matrix plots likelihood against consequence; risk score = likelihood x consequence, and the matrix's cells map to treatment priorities, but scores are ordinal and should not be summed across different risks.

  • The 4Ts of hazard response: Tolerate (accept and monitor), Treat (apply controls to reduce likelihood or impact), Transfer (insurance, contracts, outsourcing) and Terminate (avoid the activity).

  • The hierarchy of controls, most to least effective, is: eliminate, substitute, engineering controls, administrative controls, then personal protective equipment.

  • Bow-tie analysis links causes (threats) through preventive controls to a top event, and from the top event through mitigating controls to consequences; it makes control effectiveness visible on both sides.

  • Key risk indicators are forward-looking metrics with defined thresholds (often amber and red) that signal rising exposure; they are leading indicators, unlike loss data which is lagging.

  • A risk register typically records risk ID, description, cause, consequence, owner, inherent and residual ratings, existing controls, treatment actions, due dates and review dates; a risk owner is accountable for managing the risk.

  • Business continuity uses a business impact analysis to set recovery time objectives (RTO) and recovery point objectives (RPO); the RTO must not exceed the maximum tolerable period of disruption.

  • Monitoring and review is continuous: controls are tested, indicators tracked, and the register refreshed at defined intervals, with escalation triggered when residual risk exceeds tolerance.