32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Net assignable area
The usable floor area of a space measured to the inside faces of enclosing walls, excluding circulation, columns, and mechanical shafts.
Efficiency ratio
Net assignable area divided by gross area, expressing how much of a building supports its primary function; office targets are often 0.75 to 0.85.
Adjacency matrix
A planning tool that lists spaces in rows and columns and rates the required proximity of each pair to guide block planning and bubble diagrams.
Bubble diagram
A non-scaled diagram using circles or shapes to represent spaces and lines to show functional relationships, used early in programming and schematic design.
Occupant load
The number of people a space is designed to hold, calculated from floor area divided by the occupant load factor in IBC Table 1004.5.
Universal design
Design of environments usable by all people to the greatest extent possible without adaptation, guided by seven principles including equitable use and flexibility.
IBC occupancy groups
Classification of buildings by use, such as A assembly, B business, E educational, F factory, H high hazard, I institutional, M mercantile, R residential, S storage, and U utility.
Type I construction
The most fire-resistive construction type under the IBC, using noncombustible materials with high hourly fire-resistance ratings for structural elements.
Means of egress
A continuous and unobstructed path from any point in a building to a public way, consisting of exit access, exit, and exit discharge components.
Accessible route
A continuous, unobstructed path connecting accessible elements and spaces, with a minimum clear width of 36 inches and compliant turning spaces.
Floor area ratio
The total building floor area divided by the lot area, used in zoning to regulate building bulk and density on a site.
MasterFormat
A CSI standard organizing construction specifications into 50 divisions by work type, with Division 01 for general requirements and Division 09 for finishes.
Performance specification
A specification that states required results or performance criteria rather than prescribing specific materials or methods, allowing contractor flexibility.
Water-cement ratio
The ratio of water to cementitious material in a concrete mix, controlling strength, durability, and workability; lower ratios generally increase strength.
Nominal vs actual lumber
Nominal dimensions are the rough sawn size before surfacing; actual dimensions are smaller, such as a 2x4 measuring 1-1/2 by 3-1/2 inches.
Rainscreen principle
An exterior wall design that separates cladding from the drainage plane with an air space, allowing moisture to drain and evaporate.
Submittal review
The architect's review of contractor shop drawings, product data, and samples for design intent; it does not approve means and methods or shift responsibility.
Footcandle
A unit of illuminance equal to one lumen per square foot; one footcandle equals 10.76 lux, used to specify lighting levels.
Luminous efficacy
The efficiency of a light source measured in lumens per watt; LEDs typically exceed 100 lm/W while incandescent lamps are about 15 lm/W.
Color rendering index
A scale from 0 to 100 describing how accurately a light source renders colors compared to a reference; values above 80 are generally acceptable for interiors.
Sensible heat ratio
The sensible cooling load divided by the total cooling load, indicating how much of the load is temperature versus moisture removal.
Fixture units
A numerical value assigned to plumbing fixtures based on their load-producing effect, used to size water supply and drainage piping.
Equal friction method
A duct sizing technique that selects duct dimensions to maintain a constant pressure drop per unit length along the duct run.
Drawing scale
The ratio of drawing size to actual size, such as 1/4 inch = 1 foot for architectural plans or 1:100 for metric drawings.
Orthographic projection
A method of representing three-dimensional objects in two dimensions using plan, elevation, and section views projected onto planes.
Construction documents
The drawings and specifications that define the scope, materials, and workmanship of a project and form part of the contract for construction.
Level of Development
A BIM framework from LOD 100 to LOD 500 describing the degree of detail and reliability of model elements at each project phase.
Door schedule
A tabular drawing component listing each door's mark, size, type, material, hardware, and fire rating, forming part of the contract documents.
AIA B101
A standard owner-architect agreement defining basic services, compensation, and responsibilities for design and construction contract administration.
Design-bid-build
A project delivery method where the owner contracts separately with an architect for design and then with a contractor selected through competitive bidding.
Standard of care
The degree of skill and care ordinarily exercised by architects under similar circumstances; it is the benchmark for professional negligence claims.
Substantial completion
The stage when the work is sufficiently complete for the owner's intended use, triggering warranty periods and final payment procedures.