- Lead time vs cycle time
- Cycle time is the elapsed time to complete one unit of work; lead time includes queue and wait time from request to delivery. Lead time equals cycle time plus wait time.
- Little's Law
- Average work in progress equals arrival rate multiplied by average lead time. Reducing WIP at a constant arrival rate proportionally reduces lead time through the workflow.
- Swimlane process map
- A process diagram with one lane per actor. Each step sits in the lane of whoever performs it, and any step crossing lanes marks a handoff where delay or error typically occurs.
- Bottleneck identification
- The bottleneck is the step with the longest time per unit or the least capacity. Throughput of the entire workflow cannot exceed the bottleneck's rate.
- Conflict check sequence
- Search party names, adverse parties, related entities, and personnel affiliations before any substantive work. A matter cannot open until the conflict screen returns clear or is resolved.
- Intake triage criteria
- Priority is assigned by deadline or limitation severity, matter value, risk exposure, and complexity. Any limitation date creates a calendar entry at the moment of intake.
- Engagement letter essentials
- A written engagement states scope and exclusions, fee basis and rate, cost responsibility, client duties, and termination terms, and is signed before work begins.
- Client identity verification
- Verification requires a government photo identity document plus a corroborating source. Entity clients require identification of owners and controllers to the applicable threshold.
- Version numbering convention
- Drafts before approval use 0.x numbering. The first issued version is 1.0, minor edits increment the decimal, and a substantive re-issue increments the whole number.
- Document status lifecycle
- Documents move through Draft, In Review, Approved, Executed, and Superseded. Executed and Superseded records are read-only and cannot be edited in a compliant repository.
- Document register
- A register lists each document's owner, version, status, distribution list, and retention class. The register, not the folder structure, is the authoritative index of the matter file.
- Check-in and check-out
- Locking a document during editing prevents concurrent overwrite. Edits made outside the system of record create shadow copies that must be reconciled before the document is finalized.
- Cost performance index
- CPI equals earned value divided by actual cost. A value below 1.0 indicates that spending is outpacing progress against the budgeted plan for the matter.
- Estimate at completion
- EAC equals budget divided by CPI when current cost trends continue. Comparing EAC to the approved budget forecasts overrun before the matter closes.
- Budget variance formula
- Variance equals actual minus budget, divided by budget. Report variance by phase and by timekeeper role, since total variance can mask offsetting phase overruns.
- Alternative fee arrangement risk
- A fixed fee shifts volume risk to the firm. A capped fee shifts overrun risk to the firm above the cap. A success fee ties part of compensation to the outcome achieved.
- Rule anatomy
- Every automation rule has a trigger event, a condition set using explicit all-or-any logic, and an action. Ambiguous condition logic is the most frequent rule defect.
- Deadline calculation inputs
- Deadline rules require a trigger date, a counting method of calendar or business days, a jurisdiction holiday calendar, and a roll-forward rule for weekends and holidays.
- Automation exception routing
- Failed or unmatched automation cases route to a named human queue with an owner and due date. Silent failure on a legal deadline is the highest-severity automation risk.
- Template variable mapping
- Each template variable must map to a validated data source field. Unmapped or invalid variables cause document generation to fail or produce incorrect output.
- Matter number as primary key
- The matter number links time entries, documents, tasks, calendar events, and invoices. A matter opened without a number cannot be reliably billed or reported.
- Ethical wall
- A restriction that blocks specific users from specific matters regardless of their role permissions. It supplements role-based access control rather than replacing it.
- System-generated calendar entries
- Deadlines are created by the case management system from the matter record rather than typed manually, preserving the link between the deadline and its source event.
- Data migration reconciliation
- Before cutover, field mapping and deduplication rules are applied, then source and target record counts are compared to confirm that no records were lost.
- Technology competence duty
- A lawyer must understand the technology used in a matter well enough to identify its risks and supervise its output, including automated drafting and review tools.
- Scope of confidentiality
- Confidentiality covers all information relating to the representation, not only privileged material. Inadvertent disclosure triggers notification and mitigation obligations.
- Imputed conflicts
- A conflict affecting one lawyer is generally imputed to the entire firm. A screen alone does not cure it unless the applicable rules permit screening for that situation.
- Confidentiality label tiers
- Records are labeled Public, Internal, Confidential, or Highly Confidential. Access controls follow the label assigned to the record rather than its location in a folder tree.
- Legal hold effect
- A hold suspends scheduled disposition of affected records. Release requires written confirmation from counsel that the matter is concluded and no obligation remains.
- Intake conversion rate
- Conversion equals matters opened divided by intake inquiries. A low rate usually points to triage criteria or response time rather than to the source of inquiries.
- Rework rate
- Rework rate equals documents or tasks returned for correction divided by total completed. A rising rate signals a template, training, or review-gate defect in the workflow.
- ADKAR sequence
- The change sequence is Awareness, Desire, Knowledge, Ability, Reinforcement. A gap at Desire cannot be closed by adding more training or documentation.