- Working height definition
- Working height is the maximum height the platform floor reaches plus the manufacturer's stated reach above the platform, usually about 1.8 m (6 ft). It is not the same as platform height.
- MEWP group A versus B
- Group A lifts move the platform vertically only, such as scissor lifts. Group B lifts extend beyond the chassis footprint, such as boom lifts. The group affects travel-when-elevated rules.
- Type 1, 2, and 3 travel
- Type 1 cannot travel when elevated except within its footprint. Type 2 can travel elevated with platform controls. Type 3 can travel elevated with controls at the chassis or base.
- Insulated bucket truck limits
- The insulating boom section and bucket liner protect only when clean, dry, and undamaged. Voltage rating and test intervals come from the manufacturer and applicable standards; never assume protection.
- Platform rated capacity
- The maximum total load the platform may carry, including occupants, tools, materials, and attachments. Capacity may decrease with platform extension or jib use, so check the placard.
- Elevated travel rule
- Unless the lift is rated for travel while elevated, lower the boom and platform before moving. Keep the platform over the chassis footprint when driving to reduce tipping risk.
- Fall protection in boom lifts
- Boom lift occupants wear a full-body harness attached to the manufacturer's designated anchor point. The lanyard must be short enough to prevent falling over the guardrail.
- Fall protection in scissor lifts
- Scissor lift occupants typically do not need fall arrest when the gate is closed and guardrails are intact. The manufacturer's manual governs, and a restraint system may be required.
- Minimum approach distance
- The closest permitted distance between an energized line and any part of the lift, load, or operator. Values depend on voltage and on whether the worker is qualified.
- Unqualified person line distance
- OSHA 1926.1408 Table A requires 20 ft for lines up to 350 kV for unqualified persons, with greater distances for higher voltages. The lift operator is generally unqualified.
- Qualified person MAD 50 kV
- OSHA 1910.269 Table R-6 sets the phase-to-phase minimum approach distance at 10 ft (3.05 m) for 50 kV and below for qualified employees, with added distance above that.
- Line contact response
- If the lift contacts a line, stay in the platform and warn others away until the line is de-energized. If fire forces exit, jump clear and shuffle or hop away.
- Pre-use inspection scope
- A walkaround check of structure, welds, hoses, leaks, tires, battery, and decals, plus fluid levels and a function test of controls, emergency stop, tilt alarm, and emergency lowering.
- Function test items
- Test platform and ground controls, emergency stop, horn, tilt and overload alarms, leveling, steering, brakes, travel speed limits, outrigger interlocks, and the emergency lowering system.
- Inspection intervals
- Pre-use inspection each shift, frequent inspection at manufacturer intervals (often monthly), annual comprehensive inspection by a qualified person, and inspection after any incident or repair.
- Defective lift handling
- Tag out the lift, remove it from service, and record the defect in the maintenance log. Never operate a lift with an inoperative safety device.
- Tilt indicator use
- The tilt indicator shows whether the chassis is within the manufacturer's slope limit, often around 5 degrees or less. Confirm level before elevating the platform.
- Outrigger set-up rule
- Fully extend outriggers or stabilizers onto pads sized for the ground bearing capacity. Interlocks should prevent boom operation when outriggers are not properly set.
- Ground bearing pressure
- The load per unit area the lift imposes on the ground, including machine weight and rated load. It can be several times the empty machine pressure; verify slab or soil capacity.
- Spotter duties
- The spotter guides travel, watches for overhead obstructions and pedestrians, and keeps communication with the operator. The spotter stays out of the lift's travel path.
- Wind limit rule
- The manufacturer's rated wind speed is a maximum, not a target. Stop when gusts exceed the rating or when the platform becomes hard to control with the load or canopy.
- Site survey items
- Check overhead lines and voltage, slope, drop-offs, trenches, soft fill, buried utilities, floor load ratings, clearances, traffic, and wind exposure before setting up the lift.
- Risk assessment sequence
- Identify hazards, evaluate severity and likelihood, apply controls in order (eliminate, substitute, engineer, administrate, PPE), then re-evaluate before work and after any change.
- Overhead line priority
- Overhead power lines are the leading cause of fatal aerial lift incidents. Treat every line as energized until the utility confirms de-energized and grounded status in writing.
- Rescue plan requirement
- A rescue plan identifies the retrieval method, rescuer, and equipment before the lift goes up. Ground-level emergency lowering is the first-line rescue for platform failure.
- Suspension trauma risk
- A worker hanging motionless in a harness can lose consciousness quickly. Prompt rescue and medical evaluation are required; do not leave the worker suspended.
- Rigging and lift platforms
- Never tie rigging lines or loads to the platform or boom. The lift is not a rigging anchor, and side loads can tip or damage it. Rig from the tree or a separate anchor.
- Canopy hazard inspection
- Before entering the canopy, check for deadwood, hangers, bee or wasp nests, poison ivy or oak, and unstable leaders. Position the boom through a clear path.
- Tree-side positioning
- Account for the tree's lean, root flare, and disturbed soil. Avoid setting outriggers on roots or near the stump where the ground may be weak.
- OSHA aerial lift citations
- 29 CFR 1926 Subpart L covers construction aerial lifts, 1910.67 covers vehicle-mounted platforms in general industry, and 1910.269 covers power generation and distribution work.
- ANSI/SAIA A92 series
- A92.20 covers design, A92.22 covers safe use, A92.24 covers training, and A92.2 covers vehicle-mounted rotating work platforms. These standards define lift design and operator training.
- Operator training requirement
- OSHA requires training for each type of lift the operator uses, including familiarization with that model's controls, capacity, and limitations. Retraining follows incidents or unsafe operation.