ISA AM study materials
ISA AM study resources

ISA AM cheat sheet

ISA AM · Keep the key ideas within reach.

Quick reference

Municipal Arboriculture

  • Municipal tree inventory data elements typically include species, DBH, condition rating, location (address/GPS), maintenance history, and risk rating; inventories drive work-order prioritization and budget justification.

  • Right tree, right place: match mature canopy and root spread to planting space; minimum soil volume rules of thumb range from about 1 m³ per 1 m² of canopy projection up to 2-3 m³ per 1 m² for large shade trees in engineered soils.

  • ANSI A300 (Tree Care Operations) sets standard practices for pruning, fertilization, cabling, and planting; ANSI Z133 covers safety. Best Management Practices (BMP) companion documents translate standards into field procedures.

  • Pruning cycles: structural pruning of young trees every 2-3 years; mature tree maintenance pruning commonly on 5-7 year cycles depending on species and site.

  • Species diversity target: no single genus above ~10% and no single species above ~5% of the public tree population (common urban forestry guideline) to limit pest/disease catastrophe.

  • Stocking level = number of trees present divided by number of planting spaces available; typical municipal street stocking levels run 60-80% in well-managed programs.

  • Tree protection during construction: critical root zone (CRZ) radius often set at 1 foot (0.3 m) per inch DBH, or 1.5x the canopy radius; fencing must be installed before demolition/grade change.

  • Work-order systems should record tree ID, task code, crew hours, and completion date; cost per tree maintained and cost per tree planted are standard performance metrics reported to councils.

Quick reference

Tree Biology and Health

  • CODIT model: four walls - wall 1 plugs xylem vessels, wall 2 reinforces inner annual rings, wall 3 blocks ray parenchyma, wall 4 forms new barrier zone (suberin) in cambium; wall 4 is the strongest defense.

  • Compartmentalization is strongest in species with dense, compartmented wood (e.g., oaks, elms, ginkgo) and weakest in species that bleed or form wetwood (e.g., willows, poplars, birches).

  • Photosynthesis: 6CO2 + 6H2O + light → C6H12O6 + 6O2; stomata regulate gas exchange and close under drought stress, reducing carbon gain before visible wilt.

  • Tree water transport: transpiration pull through xylem driven by leaf water potential; cavitation/embolism risk rises when soil water drops and vapor pressure deficit is high.

  • Mycorrhizae: ectomycorrhizae dominate on pines, oaks, birches; arbuscular mycorrhizae on maples, sycamores, and most tropical species. They extend effective root surface for water and phosphorus uptake.

  • Chlorosis on high-pH soils is usually iron or manganese deficiency; treat with soil acidification, chelated iron, or species substitution rather than nitrogen fertilizer.

  • Growth regulators (e.g., paclobutrazol, uniconazole) reduce internode elongation and can improve drought tolerance but must be applied at labeled rates; they do not cure disease.

  • Bark damage from string trimmers and mowers creates entry courts for decay fungi; maintaining a 1-3 m vegetation-free ring around the trunk is a standard preventive practice.

Quick reference

Tree Risk Assessment and Management

  • Risk = likelihood of failure × likelihood of impact × consequence; a tree with high failure likelihood but no target has zero risk under the ISA TRAQ framework.

  • TRAQ levels of assessment: Level 1 limited visual (walk-by), Level 2 basic (360° visual from ground), Level 3 advanced (aerial, resistograph, sonic tomography, pull test).

  • Targets: people, vehicles, structures, utilities, and other trees within the potential fall zone. Target value and occupancy drive consequence rating.

  • Failure likelihood ratings in TRAQ: improbable, possible, likely, and imminent - each with defined probability ranges (e.g., imminent = failure expected within the assessment period under normal weather).

  • Tree part failure modes: whole-tree uprooting, root/soil failure, trunk buckling, branch failure (union or mid-limb), and crown loss. Each has distinct diagnostic indicators.

  • Mitigation options ranked: (1) move/remove target, (2) remove tree, (3) prune to reduce load or clearance, (4) support with cables/bracing, (5) monitor and reassess. Document residual risk after each.

  • Decay detection: resistograph (drilling resistance), sonic tomography (stress-wave velocity), and visual indicators (conks, cavities, seams, bark cracks). No single tool is definitive; combine with species failure profile.

  • Reassessment interval should reflect risk rating: imminent = days to weeks; likely = months; possible = annually or per cycle; document the rationale.

Quick reference

Municipal Tree Programs and Policy

  • Tree ordinance components: purpose, definitions, jurisdiction, permit requirements for removal/pruning, tree protection during development, mitigation ratios (e.g., 2:1 or 3:1 replacement), and enforcement/penalties.

  • Heritage/landmark tree designation usually requires a nomination, review by an urban forestry board, and public hearing; removal typically requires council approval and mitigation plan.

  • Municipal tree board or commission: advisory body appointed by the governing body; typical duties include policy review, public education, and grant oversight (not day-to-day operations).

  • Tree canopy goals: many cities adopt 30-40% canopy cover targets; measurement via i-Tree Canopy, LiDAR, or aerial photo sampling, with equity analysis by census tract.

  • Funding models: general fund, stormwater utility credits, tree mitigation fees, grants (e.g., USDA Forest Service Urban & Community Forestry), and public-private partnerships.

  • Tree City USA recognition requires four standards: a tree board or department, a tree care ordinance, a community forestry program with annual budget of at least $2 per capita, and an Arbor Day observance/proclamation.

  • Permit workflow: application → site plan review → arborist inspection → decision (approve/deny/condition) → mitigation bond or fee → follow-up inspection; timelines and appeal rights must be specified.

  • Emergency response policy: pre-identified priority routes, mutual aid agreements, debris management contracts, and post-storm damage assessment protocols should be adopted before the event.