ISA TRAQ study materials
ISA TRAQ study resources

ISA TRAQ study plan

ISA TRAQ · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Tree Risk Assessment (domain structure not enumerated in source)

  • Define the three components of risk (likelihood of failure, likelihood of impact, consequences) and state how they combine into an overall risk rating

  • List the eleven ISA Tree Risk Assessment Qualification matrix ratings and order them from negligible to severe

  • Identify the difference between a limited visual assessment, a basic assessment, and an advanced assessment, and state when each is appropriate

  • Describe the role and legal limits of the assessor, including scope of work, client communication, and when to refer to a specialist

Your checkpoint

One-page written summary mapping each assessment level to its typical target, tools, and output, checked against your own notes with no gaps

Week 2

Tree Risk Assessment (domain structure not enumerated in source)

  • Explain how to define and document the target, including occupancy rate and protection status

  • Distinguish likelihood of failure timeframes (imminent, probable, possible, improbable) and assign each to three sample scenarios you invent

  • Describe how site factors such as soil, drainage, exposure, and recent construction change likelihood of failure

  • Practice writing a defensible scope-of-work statement for a residential and a municipal client

Your checkpoint

Three invented tree scenarios written up with target, likelihood of failure, likelihood of impact, and consequences each justified in two sentences

Week 3

Tree Risk Assessment (domain structure not enumerated in source)

  • Identify external and internal visual indicators of defects on trunk, scaffold branches, roots, and crown

  • Explain how to perform a root collar examination and what a girdling root or decay conk implies for failure likelihood

  • Describe when sounding, probing, or increment boring adds value and when each is inappropriate or hazardous to the tree

  • Summarize how woundwood, reaction wood, and callus formation indicate tree response to injury

Your checkpoint

Annotated defect checklist covering at least fifteen indicators, each paired with the assessment level at which it is normally detected

Week 4

Tree Risk Assessment (domain structure not enumerated in source)

  • Compare static and dynamic load testing, resistograph, sonic tomography, and aerial inspection by purpose, cost, and limitation

  • State the training and credential boundaries that determine when an assessor must defer to a specialist

  • Explain how to record field data so another assessor could reproduce the rating

  • Draft mitigation options (pruning, support, exclusion, removal, monitoring) and match each to a defect type

Your checkpoint

A written advanced-assessment decision guide: for eight defect types, state whether advanced tools are warranted and which one, with reasoning

Week 5

Tree Risk Assessment (domain structure not enumerated in source)

  • Apply the full risk matrix end to end on five invented trees and defend each final rating

  • Practice translating a matrix rating into plain-language client recommendations with residual risk stated

  • Explain how risk tolerance differs among owners and how to document informed consent to retain a tree

  • Identify common assessor errors: target misidentification, overconfidence in decay estimates, and ignoring occupancy

Your checkpoint

Five complete mock assessment reports using the standard matrix, each with target, defects, rating, mitigation, and residual risk

Week 6

Tree Risk Assessment (domain structure not enumerated in source)

  • Describe how to design and schedule a monitoring program, including re-inspection intervals tied to risk rating

  • Explain what changes during drought, storm damage, or construction that should trigger reassessment

  • Outline the elements of a tree risk management plan for a population of trees, including prioritization and recordkeeping

  • Distinguish mitigation of risk from elimination of risk in program language

Your checkpoint

A one-page monitoring and reassessment protocol with interval rules keyed to risk rating and trigger events

Week 7

Tree Risk Assessment (domain structure not enumerated in source)

  • Review the full assessment workflow from client request through report delivery and identify weak steps in your own process

  • Practice timed written responses to scenario questions in the style used on the qualification exam

  • Correct every error found in your week 5 reports and rewrite two of them to standard

  • Recite the matrix categories and assessment levels from memory without notes

Your checkpoint

Timed 40-question self-written practice set scored, with every missed item rewritten as a corrected one-line rule

Week 8

Tree Risk Assessment (domain structure not enumerated in source)

  • Complete two full-length timed practice assessments under exam conditions

  • Review all corrected rules from weeks 1 through 7 and consolidate them into a single reference sheet

  • Rehearse verbal justification of risk ratings as required in the practical skills assessment

  • Confirm logistics: registration, identification, field gear, and any pre-course materials required

Your checkpoint

Consolidated one-page rule sheet plus a scored record of both practice attempts with a list of remaining weak areas

Milestones

Week 2: Can define target, likelihood of failure, likelihood of impact, and consequences for any scenario without notes

Week 4: Can justify when advanced assessment is warranted for at least eight defect types

Week 6: Can produce a complete, defensible risk rating and mitigation recommendation in under twenty minutes

Week 8: Scores at least 85 percent on two timed practice assessments and can recite the matrix from memory