CDPSE study materials
CDPSE study resources

CDPSE study plan

CDPSE · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Privacy Engineering

  • Map the privacy engineering domain into its component activities: requirements elicitation, privacy-by-design integration, technical controls, and validation/testing

  • Explain how privacy requirements are derived from legal obligations, data classification, and business process analysis, and translate one obligation into a technical requirement

  • Compare privacy-enhancing technologies (PETs) such as pseudonymization, tokenization, differential privacy, homomorphic encryption, and secure multi-party computation by use case and limitation

  • Draft a build-versus-buy decision note for a privacy control (for example consent management or data discovery) listing evaluation criteria

Your checkpoint

A one-page PET selection matrix covering at least six technologies with use case, maturity, and residual-risk notes

Week 2

Privacy Engineering

  • Design a privacy-by-design and default review checklist that a solution architect could apply at design review

  • Specify functional and non-functional privacy requirements for a sample customer-facing application, including data minimization, retention, and access controls

  • Describe how consent, preference, and rights-request workflows are implemented technically and where they touch downstream systems

  • Identify logging, monitoring, and evidence artifacts that demonstrate a privacy control is operating

Your checkpoint

A completed privacy-by-design review of a hypothetical application with at least ten requirements and mapped controls

Week 3

Privacy Engineering & Data Life Cycle Management

  • Trace a record through collection, use, sharing, retention, and disposal stages and identify the engineering control at each stage

  • Define data classification tiers and specify handling rules for each tier, including test and analytics environments

  • Explain de-identification, anonymization, and pseudonymization differences and assess re-identification risk for a described dataset

  • Design retention and deletion logic that handles backups, archives, derived data, and third-party copies

Your checkpoint

A data life cycle control map for one business process, from collection to disposal, with named controls and evidence sources

Week 4

Data Life Cycle Management & Privacy Governance

  • Build a records-of-processing inventory template and populate it for two distinct processing activities

  • Connect governance structures (roles, accountability, policy hierarchy) to the technical controls they authorize and oversee

  • Explain how privacy program metrics and reporting flow from engineering evidence to governance oversight

  • Draft a data retention schedule for three data categories with justification tied to purpose and legal basis

Your checkpoint

Two completed records-of-processing entries plus a draft retention schedule, reviewed against a self-built completeness checklist

Week 5

Privacy Risk Management and Compliance

  • Perform a privacy risk assessment on a described processing activity using a likelihood-by-impact method and document mitigating controls

  • Distinguish privacy risk from information security risk and explain where the two assessments overlap and diverge

  • Map common legal and regulatory obligations to the controls that satisfy them, without overstating jurisdiction-specific conclusions

  • Design a third-party/vendor privacy due diligence questionnaire and scoring approach

Your checkpoint

A privacy risk register with at least eight risks, scored, with owners and treatment options

Week 6

Privacy Governance & Privacy Risk Management and Compliance

  • Assemble a privacy governance framework outline covering policy, roles, training, monitoring, and incident escalation

  • Describe how a data protection impact assessment is scoped, triggered, and reviewed, and when engineering input is required

  • Explain the components of a privacy incident response process and the engineering evidence needed for investigation and notification decisions

  • Define audit and assurance activities that test control design and operating effectiveness

Your checkpoint

A governance framework outline and a DPIA trigger checklist, each one page

Week 7

Privacy Engineering & Data Life Cycle Management & Privacy Risk Management and Compliance & Privacy Governance

  • Integrate all four domains into a single end-to-end scenario walkthrough from business request to control evidence

  • Identify weak links where governance intent fails to reach engineering implementation and propose fixes

  • Practice scenario-based question analysis: extract the requirement, eliminate distractors, and justify the best answer

  • Time-box and complete a mixed set of practice scenarios under exam-like pacing

Your checkpoint

A written end-to-end scenario analysis with a control gap list and remediation recommendations

Week 8

Privacy Governance & Privacy Risk Management and Compliance & Data Life Cycle Management & Privacy Engineering

  • Revisit every weak area logged during weeks 1-7 and close each gap with a written explanation in your own words

  • Rehearse concise definitions for core terms across all four domains without referring to notes

  • Complete a final timed mixed practice run and analyze every incorrect or uncertain response

  • Finalize a one-page pre-exam summary sheet organized by domain weighting

Your checkpoint

A finalized one-page summary sheet plus a gap-closure log showing each weak area resolved

Milestones

Week 2: Can explain privacy engineering activities and select an appropriate PET for a stated scenario without notes

Week 4: Can produce a records-of-processing entry and a life cycle control map from a short business description

Week 6: Can score a privacy risk and name the governance mechanism that owns its treatment

Week 8: Scores consistently above target on timed mixed scenarios and has no unresolved items on the gap-closure log