IT Risk Fundamentals study materials
IT Risk Fundamentals study resources

IT Risk Fundamentals cheat sheet

IT Risk Fundamentals · Keep the key ideas within reach.

Quick reference

IT Risk Fundamentals

  • Risk = likelihood of a threat event × magnitude of impact; inherent risk excludes controls, residual risk is measured after controls are applied.

  • Risk = Threat × Vulnerability × Impact; a risk requires a threat source, a vulnerability, and an adverse consequence - remove any element and the risk does not exist.

  • Risk appetite is the amount of risk an organization is willing to accept in pursuit of objectives; risk tolerance is the acceptable deviation around that appetite, expressed as measurable limits.

  • Risk capacity is the maximum risk an organization can absorb before viability is threatened; capacity is always greater than or equal to appetite.

  • Qualitative scales (High/Medium/Low) use defined criteria for likelihood and impact; quantitative analysis expresses risk in monetary terms, typically as annualized loss expectancy (ALE).

  • SLE (single loss expectancy) = asset value × exposure factor; ALE = SLE × annualized rate of occurrence (ARO).

  • Risk register entries contain: risk ID, description, cause, affected asset, owner, inherent rating, controls, residual rating, and treatment decision.

  • Four treatment options: mitigate (reduce likelihood or impact), transfer (insurance, contracts), avoid (eliminate the activity), accept (documented decision by risk owner).

  • Risk owner is accountable for the risk and its treatment decision; control owner operates the control; risk owners accept residual risk, not the security team.

Quick reference

IT Risk Fundamentals - Frameworks and Process

  • NIST SP 800-30 risk assessment steps: prepare, conduct (identify threat sources, identify vulnerabilities, determine likelihood, determine impact, determine risk), communicate, maintain.

  • ISO 31000 process: establish context, identify, analyze, evaluate, treat, monitor and review, communicate and consult - iteration is explicit, not linear.

  • COSO ERM components: governance and culture, strategy and objective-setting, performance, review and revision, information-communication-reporting.

  • FAIR (Factor Analysis of Information Risk) decomposes risk into loss event frequency (threat event frequency × vulnerability) and loss magnitude (primary and secondary loss).

  • Three lines model: first line owns and manages risk, second line provides oversight and challenge, third line (internal audit) gives independent assurance.

  • Key risk indicators (KRIs) are forward-looking metrics with thresholds; key performance indicators (KPIs) measure achievement of objectives - a KRI predicts loss, a KPI reports results.

  • Control types: preventive (stops the event), detective (identifies it), corrective (restores after it), compensating (substitutes when the primary control is unavailable).

  • Control categories by nature: administrative/managerial, technical/logical, physical/environmental.

  • Risk treatment must be recorded with a decision date and reviewer; accepted risks require periodic re-evaluation because likelihood and impact change over time.

Quick reference

IT Risk Fundamentals - Threats, Controls and Reporting

  • Threat modeling (e.g., STRIDE: spoofing, tampering, repudiation, information disclosure, denial of service, elevation of privilege) identifies threats against a design before deployment.

  • Vulnerability management metrics: mean time to detect, mean time to remediate (MTTR), and percentage of critical vulnerabilities remediated within SLA.

  • A vulnerability is a weakness; a threat is a potential cause of harm; exposure is the condition of being susceptible - risk combines all three with impact.

  • Risk heat map plots likelihood against impact; cells above the tolerance line require treatment or formal acceptance by the accountable owner.

  • Inherent risk minus control effectiveness equals residual risk; control effectiveness is judged by design adequacy plus operating effectiveness evidence.

  • Business impact analysis (BIA) determines RTO and RPO per process; RTO is maximum tolerable downtime, RPO is maximum tolerable data loss measured in time.

  • Risk aggregation across systems can exceed the sum of individual risks when systems share dependencies, single sign-on, or the same network segment.

  • Third-party risk: inherent vendor risk is tiered by data sensitivity and system criticality; residual vendor risk depends on contractual clauses and assurance reports (e.g., SOC 2 Type II).

  • Risk reporting to the board should state risk exposure against appetite, trend direction, and treatment status - not raw vulnerability counts.