ISO 27701 LA flashcards
ISO 27701 LA · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- PII principal
- The individual to whom personally identifiable information relates; ISO/IEC 27701 uses this term instead of 'data subject' to stay technology-neutral and independent of any single legal system.
- PII controller
- An entity that alone or jointly with others determines the purposes and means of processing PII, and therefore carries accountability for that processing.
- PII processor
- An entity that processes PII on behalf of, and on the documented instructions of, a PII controller, without determining the purposes or the essential means of processing.
- Joint PII controller
- Two or more organizations that jointly determine the purposes and means of PII processing and therefore share accountability for the processing and its outcomes.
- Privacy by design and default
- An approach requiring privacy to be embedded in the design of systems and processes, with default settings set to the most privacy-protective option without user intervention.
- Accountability principle
- The principle that a controller remains answerable for PII it processes, including processing performed by processors on its behalf, and must be able to demonstrate compliance.
- ISO/IEC 29100 principles
- Eleven privacy principles including consent and choice, purpose legitimacy, collection limitation, data minimisation, use and retention limitation, accuracy, openness, individual participation, accountability, information security and privacy compliance.
- Annex A (ISO/IEC 27701)
- The normative part of ISO/IEC 27701 containing PIMS-specific requirements: A.1 for organizations acting as PII controllers and A.2 for organizations acting as PII processors.
- Annex B (ISO/IEC 27701)
- The informative part of ISO/IEC 27701 giving implementation guidance for the Annex A requirements, structured in correspondence with ISO/IEC 27002 control themes.
- PIMS scope statement
- Documented information defining the boundaries of the privacy information management system, including which PII processing activities, roles, locations and entities it covers.
- Privacy policy (PIMS)
- A top-management document stating the organization's privacy commitments; ISO/IEC 27701 clause 5.2.1 covers controllers and clause 5.2.2 covers processors.
- Statement of Applicability
- A document recording which ISO/IEC 27001 and ISO/IEC 27701 Annex A controls are applicable, the justification for inclusion or exclusion, and their implementation status.
- Audit criteria
- The set of requirements used as a reference against which objective evidence is compared, for example ISO/IEC 27701, the organization's privacy policy, contracts and applicable privacy law.
- Objective evidence
- Records, statements of fact or other verifiable information about activities, events or conditions that is relevant to the audit criteria and can be corroborated.
- Major nonconformity
- A nonconformity that affects the management system's ability to achieve intended results or creates significant doubt about the effectiveness of controls, requiring correction and corrective action.
- Evidence-based approach
- The audit principle that findings and conclusions must rest on verifiable, representative objective evidence rather than on opinion, impression or unverified assertion.
- Technical expert
- A person providing specific privacy, legal or sector knowledge or expertise to the audit team, who advises the auditors but does not act as an auditor.
- Audit programme
- Arrangements for a set of one or more audits planned for a specific time frame and directed at a specific purpose, including resources and schedule.
- Audit plan
- A description of the activities and arrangements for a specific audit, covering dates, sites, functions to be audited, auditor allocation and the audit schedule.
- Stage 1 audit
- The initial audit phase that reviews documented information, PIMS scope, controller or processor role determination and readiness, to decide whether stage 2 can proceed.
- Audit time determination
- Calculation of the auditor time needed, based on factors such as scope, complexity, number of sites, personnel, PII volume and sensitivity, and prior audit results.
- Opening meeting
- The meeting at the start of the audit at which scope, criteria, schedule, methods, roles, communication channels and confidentiality arrangements are confirmed with the auditee.
- Audit sampling
- Selecting a representative subset of records, sites or activities for verification; the size and selection must be justified and conclusions are limited to the sample.
- Audit trail
- The documented link from each finding back to the objective evidence and the criterion that supports it, allowing the conclusion to be traced and re-verified.
- Documented processor instructions
- The requirement that a PII processor processes PII only on the controller's documented instructions, including for transfers to third parties or other countries.
- Audit conclusion
- The outcome of an audit, determined after considering the audit objectives and all findings, stating the extent of conformity with the audit criteria.
- Certification decision
- A decision by the certification body, independent of the audit team, to grant, maintain, suspend or withdraw certification, based on the audit report and related evidence.
- Surveillance audit
- A periodic audit after initial certification; the first occurs no later than twelve months from the certification decision date, and at least one takes place each calendar year.
- Corrective action verification
- Confirmation, by documentary review or follow-up audit, that the correction and corrective action for a nonconformity have been implemented and are effective.
- Impartiality in certification
- The absence of conflicts of interest; certification bodies must not consult clients they certify and must identify, analyse and control threats to objectivity.
- Audit programme manager
- The person assigned responsibility and authority for managing the audit programme, including its implementation, resourcing, monitoring, review and improvement.
- Certification cycle
- The three-year period of a certificate, typically comprising initial certification with stage 1 and stage 2, annual surveillance audits, and recertification before expiry.