ISO 27701 LI study plan
ISO 27701 LI · Give each week a clear focus.
8 weeks · About 6 hours per week
Fundamental principles and concepts of a privacy information management system
Define PIMS, personally identifiable information (PII), PII principal, and PII controller versus PII processor in your own words without notes
Explain how ISO/IEC 27701 extends ISO/IEC 27001 and 27002 by mapping privacy controls onto an existing ISMS
Distinguish the controller role annex from the processor role annex and state which annex applies to which organization type
Summarize the privacy principles that underpin the standard: lawfulness, purpose limitation, data minimization, accuracy, storage limitation, integrity and confidentiality, accountability
Your checkpoint
A one-page glossary plus a two-column comparison table of controller and processor obligations, written from memory and then corrected against the standard
Fundamental principles and concepts of a privacy information management system & Initiation of the PIMS implementation
Describe the structure of ISO/IEC 27701: clauses 4 to 8 for general requirements, clauses 5 and 6 for controllers, clauses 7 and 8 for processors, plus the annexes
Identify the inputs needed to start a PIMS: leadership mandate, scope boundary, applicable privacy legislation, existing ISMS artifacts
Draft a scope statement that names business units, products, locations, and systems in scope and explicitly lists exclusions
Map the organization's legal and regulatory obligations to the standard's control themes
Your checkpoint
A draft PIMS scope document with an in-scope/out-of-scope table and a regulation-to-control mapping sheet covering at least three jurisdictions or frameworks
Initiation of the PIMS implementation & Planning a PIMS implementation based on ISO/IEC 27701
Conduct a gap analysis against the ISO/IEC 27701 clauses and annex controls, rating each as absent, partial, or implemented
Perform a risk assessment that treats PII-specific risks (re-identification, unauthorized secondary use, excessive retention) alongside ISMS risks
Build a stakeholder and interested-party register covering data subjects, customers, regulators, and subprocessors
Draft the PIMS policy and objectives so they are consistent with the existing information security policy
Your checkpoint
A completed gap analysis register with risk ratings and a prioritized remediation roadmap sequenced across the remaining study weeks
Planning a PIMS implementation based on ISO/IEC 27701 & Implementation of a PIMS based on ISO/IC 27701
Translate the gap analysis into a formal PIMS implementation plan with owners, dependencies, and target dates
Select and document the controls to apply, including justifications for any control from Annex A or B that is excluded
Establish the documented information required by the standard: policy, roles and responsibilities, records of processing, and PII principal request procedures
Define competence, awareness, and training requirements for staff who handle PII
Your checkpoint
A Statement of Applicability draft listing every applicable privacy control with implementation status and justification for exclusions
Implementation of a PIMS based on ISO/IC 27701
Design PII processing records that capture purpose, categories of PII and principals, recipients, retention, and cross-border transfers
Write procedures for handling PII principal requests: access, correction, erasure, objection, and portability, including response timelines
Specify privacy by design and by default requirements to be embedded in project and change management processes
Define controls for engaging subprocessors, including due diligence, contractual terms, and flow-down obligations
Document incident and breach handling that links security incidents to privacy notification duties
Your checkpoint
A procedure pack containing at least four operational procedures, each with a process owner, trigger, steps, records produced, and review cycle
Monitoring and measurement of a PIMS based on ISO/IEC 27701
Define monitoring, measurement, analysis, and evaluation activities with metrics that are specific and auditable
Set up internal audit planning that covers PII-specific controls, not just the underlying ISMS
Prepare a management review agenda that includes privacy performance, nonconformities, and changes in legal obligations
Design a method for tracking PII principal complaints and requests as a performance indicator
Your checkpoint
A monitoring and measurement plan with at least eight metrics, each with formula, data source, frequency, target, and owner
Monitoring and measurement of a PIMS based on ISO/IEC 27701 & Continual improvement of a PIMS based on ISO/IEC 27701
Run a tabletop internal audit of two or three privacy controls and record findings against the standard's requirements
Classify findings as conforming, observation, minor nonconformity, or major nonconformity with written rationale
Perform root cause analysis on at least two nonconformities and define corrective actions with effectiveness checks
Describe how continual improvement uses audit results, metrics trends, and management review outputs
Your checkpoint
A mock internal audit report with findings, root cause statements, corrective action plan, and a defined verification date for each action
Preparing for a PIMS certification audit & Continual improvement of a PIMS based on ISO/IEC 27701
Assemble the certification audit evidence pack: scope, SoA, policies, procedures, risk assessment, internal audit report, management review minutes
Prepare stage 1 and stage 2 expectations, including what auditors typically examine in each stage
Rehearse answers to likely auditor questions on controller/processor role determination, transfer mechanisms, and retention justification
Build a corrective action tracker that would satisfy an auditor reviewing continual improvement
Complete a timed practice assessment across all seven domains and review every missed item
Your checkpoint
A complete audit readiness pack with an evidence index mapped to each clause and annex control, plus a scored practice exam log with remediation notes
Milestones
Week 2: Can explain controller versus processor obligations and the standard's clause and annex structure without notes, and has an approved draft scope
Week 4: Gap analysis and risk assessment are complete, and the Statement of Applicability draft lists every applicable control with exclusion justifications
Week 6: All core procedures are written and the monitoring plan defines at least eight metrics with owners and targets
Week 8: Mock internal audit closed with corrective actions logged, evidence index complete, and practice exam score above 80 percent across all domains