Fundamental principles and concepts of an AI management system

  • ISO/IEC 42001:2023 is the first international management system standard for AI and follows the harmonized structure with clauses 4 to 10.

  • An AI management system (AIMS) is the part of an organization's management system used to plan, implement, maintain, review and improve the management of AI.

  • An AI system is an engineered system that generates outputs such as predictions, content, recommendations or decisions for a given set of objectives, with varying levels of autonomy.

  • AI system impact is the effect of an AI system on individuals, groups of people, organizations, society or the environment, and may be positive or negative.

  • Annex A is normative (reference control objectives and controls); Annexes B, C and D are informative guidance, risk-source examples and sector guidance.

  • Annex A of ISO/IEC 42001:2023 contains 9 control objectives (A.2 to A.10) and 38 controls covering policy, organization, resources, impacts, life cycle, data, information, use and third parties.

  • The standard is applicable to any organization, regardless of size, type or sector, that develops, provides or uses AI-based products or services.

  • The AIMS follows a continual improvement cycle across clauses 4 to 10: context, leadership, planning, support, operation, performance evaluation and improvement.

  • ISO/IEC 42001 complements rather than replaces ISO/IEC 27001; AI-specific risks such as impact on individuals and unintended behaviour are addressed in addition to information security.

Quick reference

AI management system requirements

  • Clause 4 requires determining external and internal issues, the needs of interested parties, the AIMS scope, and establishing the AIMS and its processes.

  • Clause 5 requires top management to establish an AI policy (5.2) and to assign roles, responsibilities and authorities (5.3).

  • Clause 6.1.2 requires AI risk assessment; 6.1.3 requires AI risk treatment including a Statement of Applicability; 6.1.4 requires an AI system impact assessment.

  • Clause 6.2 requires measurable AI objectives at relevant functions and levels, together with plans for achieving them.

  • Clause 7 covers resources, competence, awareness, communication and documented information.

  • Clause 8 covers operational planning and control and requires the AI risk assessment, risk treatment and impact assessment to be performed operationally (8.2 to 8.4).

  • Clause 9 requires monitoring, measurement, analysis and evaluation (9.1), internal audit (9.2) and management review (9.3).

  • Clause 10 requires continual improvement (10.1) and control of nonconformities with corrective action (10.2).

Quick reference

Fundamental audit concepts and principles

  • An audit is a systematic, independent and documented process for obtaining objective evidence and evaluating it objectively against audit criteria.

  • ISO 19011 defines seven audit principles: integrity, fair presentation, due professional care, confidentiality, independence, evidence-based approach and risk-based approach.

  • Audit criteria are the requirements used as a reference (ISO/IEC 42001, legal and regulatory requirements, the organization's own AIMS documents); the scope defines the boundaries of the audit.

  • First-party audits are internal audits; second-party audits are performed on suppliers or other external providers; third-party audits are independent, such as certification audits.

  • Audit evidence must be verifiable, recorded and traceable; sampling is used because examining the full population within the audit time is not feasible.

  • Audit findings are classified as conformity or nonconformity; nonconformities may be graded major or minor, and observations or opportunities for improvement may also be reported.

  • Auditors must be independent of the activity being audited and must not audit their own work.

  • Audit conclusions state the extent of conformity with the audit criteria and, where in scope, the effectiveness of the management system.

Quick reference

Preparing an ISO/IEC 42001 audit

  • An audit programme is the set of audits planned over a time frame; an audit plan covers a single audit and its schedule and arrangements.

  • Stage 1 of an initial certification audit reviews documented information and readiness; stage 2 evaluates implementation and effectiveness of the AIMS.

  • Key AIMS documents to review: AIMS scope, AI policy, risk assessment and treatment records, Statement of Applicability, impact assessments, internal audit results and management review outputs.

  • The audit plan states objectives, criteria, scope, dates, sites, audit team, schedule and the allocation of time per area.

  • Audit time depends on the AIMS scope and complexity, number and type of AI systems, level of AI risk, number of sites and use of remote auditing techniques.

  • Sampling should follow risk and the audit trail from the AI risk assessment to implemented Annex A controls and to evidence that the controls operate.

  • The opening meeting agenda covers introductions, confirmation of plan, scope and criteria, communication routes, working arrangements and classification of findings.

  • Prepared checklists support but do not replace auditor judgement and the follow-up of leads found during the audit.

Quick reference

Conducting an ISO/IEC 42001 audit

  • Evidence is collected through interviews, observation of activities and review of documents and records; findings should be corroborated by more than one source.

  • A written nonconformity states the requirement (audit criteria), the objective evidence, and the gap between the evidence and the requirement.

  • A major nonconformity means the AIMS cannot achieve its intended results (e.g. missing required process, systemic failure, unaddressed legal requirement); a minor nonconformity is an isolated lapse.

  • The audit trail links the AI risk assessment to controls listed in the Statement of Applicability and to records demonstrating those controls operate.

  • For Annex A, auditors verify impact assessment (A.5), AI life cycle controls (A.6), data quality and provenance (A.7), information for interested parties (A.8) and third-party relationships (A.10).

  • Audit progress is controlled through audit team meetings and communication with the auditee; any change to scope or plan is agreed with the client and recorded.

  • Auditors use open questions and follow leads; undocumented verbal claims are not accepted as the sole basis for a finding.

  • Findings are reviewed with the auditee's management before the closing meeting to confirm factual accuracy.

Quick reference

Closing an ISO/IEC 42001 audit

  • The closing meeting presents findings, nonconformities and conclusions and states the report distribution and follow-up process.

  • The audit report includes objectives, scope, criteria, team, dates, findings, conclusions and, where applicable, a statement on conformity and effectiveness.

  • The audit ends when the audit report is issued; defined follow-up activities, where required, are planned and may be conducted as a separate audit.

  • The auditee responds to nonconformities with correction, root-cause analysis, corrective action and a completion date; the auditor verifies the effectiveness of the action taken.

  • Certification decisions are made by the certification body independently of the audit team, based on the audit report and related information.

  • Records of the audit, including findings and reports, are retained as documented information for traceability and confidentiality.

  • Audit results feed management review and continual improvement under clauses 9.3 and 10.1.

Quick reference

Managing an ISO/IEC 42001 audit programme

  • An audit programme is a set of one or more audits planned for a specific time frame, with defined objectives, extent, resources and procedures.

  • Programme planning is risk-based: frequency, duration and depth are driven by AI risk, previous audit results, changes to the organization and complaints.

  • A certification cycle consists of an initial certification audit (stage 1 and stage 2), surveillance audits at least once a year, and recertification before the three-year cycle expires.

  • The programme manager identifies risks and opportunities affecting the programme (e.g. auditor competence gaps, scheduling conflicts, auditee availability) and plans mitigation.

  • Programme resources include auditors competent in AI technology, AI risk and the applicable legal and regulatory context, plus sufficient time for each audit.

  • Programme performance is monitored and reviewed (e.g. audit completion, trends in findings, timeliness) and the programme is adjusted accordingly.

  • Records of the programme and of each audit are retained to demonstrate that the programme was implemented as planned.