ISO 42001 Lead Implementer flashcards
ISO 42001 Lead Implementer · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- AI management system
- The interrelated policies, objectives, processes and responsibilities an organization uses to direct and control its development, provision and use of AI, as specified by ISO/IEC 42001.
- AI system
- An engineered system that generates outputs such as predictions, content, recommendations or decisions for human-defined objectives, operating with varying degrees of autonomy and adaptivity.
- AI system impact
- The effect an AI system has on individuals, identifiable groups, society or the environment, assessed separately from organizational risk because it concerns harm to others, not just to the organization.
- Harmonized Structure
- The common clause framework (scope, context, leadership, planning, support, operation, performance evaluation, improvement) that lets ISO/IEC 42001 be integrated with ISO 9001 and ISO/IEC 27001.
- AI system owner
- The named person accountable for a specific AI system across its lifecycle, with defined authority for its risk decisions, performance and conformity with the organization's AI policy.
- AIMS scope statement
- Documented information defining the boundaries of the management system - organizational units, products, services and locations covered - and the applicability of requirements within those boundaries.
- AI policy
- Top management's documented direction for AI: appropriate to purpose, committing to applicable requirements and continual improvement, providing a framework for objectives, and communicated and available.
- AI risk assessment
- A Clause 6 process that identifies, analyzes and evaluates risk to the organization's AI objectives against defined criteria, producing documented information that is retained and updated.
- AI system impact assessment
- A required evaluation of how an AI system affects individuals, groups, society and the environment, used to decide whether the system may proceed and what safeguards are needed.
- Annex A controls
- The reference control set in ISO/IEC 42001 organized by theme, covering policies, organization, resources, impact assessment, lifecycle, data, transparency, use and third parties.
- Statement of Applicability
- Documented justification listing each Annex A control, declaring it applicable or not, and recording the reason for inclusion or exclusion; a primary entry point for auditors.
- Gap analysis
- A structured comparison of current practice against Clauses 4-10 and applicable Annex A controls, producing a register of missing controls and documentation with owners and target dates.
- Risk criteria definition
- Pre-agreed thresholds for acceptable AI risk, impact levels, assessment frequency and escalation to top management, established before assessment so results are comparable and defensible.
- Risk-based control selection
- The planning decision that determines which Annex A controls apply, based on assessed risk and impact, with exclusions justified and retained as documented information.
- Boundary risk
- The exposure created when an AI system is excluded from the AIMS scope but still used or provided by the organization, undermining the credibility of the scope statement.
- Implementation roadmap
- The sequenced plan from gap analysis through risk and impact assessment, control implementation, internal audit, management review and certification, with owners and milestones.
- AI system inventory
- A controlled record of every AI system with its purpose, owner, lifecycle stage, data sources, model type, users, and risk and impact rating; the backbone of implementation.
- AI lifecycle controls
- Controls applied from requirements and design through data preparation, model building and validation, deployment, operation and monitoring, to decommissioning of the AI system.
- Data provenance record
- Documented lineage of training and operational data: source, collection method, lawful basis, transformations, quality checks and retention or disposal rules applied.
- Human oversight design
- The specified arrangement of which AI-influenced decisions require human review, what information reviewers receive, and how override and escalation operate in practice.
- Model change control
- Version control and approval over models, datasets and prompts, with environment separation, testing before release and traceability of what changed, who approved it and when.
- AI incident handling
- The process for detecting and responding to AI-specific events such as harmful or biased output, model drift, data leakage, prompt injection and misuse, including corrective action.
- Monitoring plan elements
- The defined answer to what is measured, by which method, when, by whom results are analyzed, and when they are evaluated against criteria for the AIMS.
- Model drift trigger
- A pre-agreed threshold comparing production behavior to a baseline that, when crossed, mandates investigation and possible retraining, rollback or decommissioning of the model.
- Internal audit programme
- The planned schedule of objective, impartial audits covering all clauses and applicable controls, weighted by process importance and prior results, with auditors independent of the work audited.
- Management review inputs
- Required review content: audit results, nonconformities and corrective actions, monitoring results, risk and impact status, and interested-party feedback, leading to documented decisions.
- Auditable AI objective
- An objective stated with a measurable indicator, a target value, a deadline and an accountable owner, so that progress can be evidenced to an auditor.
- Major nonconformity
- A certification audit finding of a systemic failure or an unaddressed requirement affecting the management system's ability to achieve intended results; usually requires follow-up verification.
- Corrective action
- Action taken to eliminate the root cause of a detected nonconformity so it does not recur, evidenced by the analysis method, the action and verification of effectiveness.
- Stage 1 certification audit
- The readiness review that examines documentation, scope, and AIMS structure to confirm the organization is prepared for the Stage 2 evaluation of implementation and effectiveness.
- Stage 2 certification audit
- The on-site evaluation of whether the AIMS is implemented and effective, sampling evidence for conformity with Clauses 4-10 and the controls declared applicable.
- Surveillance audit
- A periodic audit after initial certification, at least annually within the three-year cycle, checking continued conformity and specified areas rather than repeating the full assessment.
- Recertification audit
- The full audit conducted before the three-year certificate expires to confirm the AIMS remains suitable, adequate and effective, renewing certification for a further cycle.