ISO 45001 LI study materials
ISO 45001 LI study resources

ISO 45001 LI case studies

ISO 45001 LI · Put your knowledge to work in context.

The PECB Certified ISO 45001 Lead Implementer is a professional credential for people who establish, implement, manage, and maintain an occupational health and safety management system (OH&S MS) against ISO 45001:2018. The qualification route is a five-day training course followed by a certification exam; passing the exam lets you apply for the credential, which PECB describes as IAS accredited and internationally recognized and as validating competence to implement an OH&S MS. The ISO 45001 LI case studies are 5 cases and about 4,867 words.

1

The zero-LTI warehouse: worker consultation and participation in practice

Meridian Fulfilment runs a single 44,000 m2 distribution centre with 620 people on site: 340 permanent employees and 280 agency workers on rolling eight-week contracts, with agency turnover around 70% a year. Work runs over three shifts and includes automated conveyor sortation, twelve counterbalance forklifts, manual order picking against a 180-items-per-hour target, and loading of third-party haulier vehicles.

960 words, about 5 min
2

Scope and initiation pressure on a seven-month deadline

Northgate Built Environment Group has 240 staff in three divisions: mechanical and electrical installation (110), reactive maintenance (85) and demolition and strip-out (45). It holds ISO 9001 and ISO 14001 certificates from the same body, valid for another 14 months, and wants ISO 45001 before a client prequalification window closes in seven months.

983 words, about 5 min
3

Planning the controls for a new high-care line

Calder Valley Foods runs a ready-meal factory with 380 employees on two shifts and is commissioning a new high-care assembly line in ten weeks. The line adds 60 staff, a new wash-down regime and a chilled-water plant, and no risk assessment exists for it yet.

992 words, about 5 min
4

Monitoring, audit and management review at a plating plant

Atlas Metal Finishing employs 150 people across two chromic acid plating lines, a phosphating line, a wastewater plant and an on-site laboratory. A local exhaust ventilation system serves the plating tanks.

953 words, about 5 min
5

Five weeks from stage 2: whether to proceed

Vantage Renewables Services employs 190 technicians maintaining wind turbines and solar farms from four regional depots. Its OH&S management system has been running for 22 months, and its certification body has scheduled the stage 2 audit in five weeks following a one-day remote stage 1.

979 words, about 5 min