Product risk
The risk that a product or component may fail to meet stakeholder needs. Its level is derived from likelihood of occurrence and potential impact, and it drives test prioritisation.
Risk-based testing
An approach in which test effort, test coverage and execution order are allocated in proportion to the level of product risk, so that the highest-risk areas receive the most thorough testing.
Risk assessment
The combination of risk identification, risk analysis (estimating likelihood and impact) and risk evaluation (deciding whether the risk is acceptable); performed early and repeated whenever new information appears.
Risk mitigation through testing
Activities that reduce risk; testing mitigates by providing information about quality. Higher risk levels demand more rigorous techniques, stronger coverage targets and greater test independence.
Risk matrix
A table that crosses likelihood categories with impact categories to produce a risk level such as very high, high, medium or low, used to rank requirements and test conditions.
Risk tracking
Ongoing monitoring that re-evaluates each risk after changes, new defects or new information, so the test analyst can reallocate effort and coverage during the project.
Risk poker
A consensus workshop technique in which participants independently estimate the likelihood and impact of identified risks and then discuss the differences to agree a shared rating.
Test condition
A testable aspect or attribute of a component or system identified from the test basis during test analysis, forming the input from which test cases are designed.
Equivalence partitioning
A black-box technique that divides input values or outputs into partitions expected to be processed identically; one test case per partition, with invalid partitions tested separately.
Boundary value analysis
A black-box technique testing values at the edges of ordered equivalence partitions; for a range a to b, two-value BVA uses a-1, a, b and b+1.
Decision table testing
A technique that models combinations of conditions and their resulting actions. With n binary conditions a full table has 2^n rules, each rule yielding at least one test case.
State transition testing
A technique modelling states, events and transitions of state-dependent behaviour; coverage criteria are all states, all valid transitions, and N-switch sequence coverage.
Pairwise testing
A combinatorial technique in which every combination of two parameter values appears in at least one test case, cutting combinations substantially while maintaining good defect detection.
Use case testing
A technique based on use cases where test cases cover the basic flow plus alternative and exception flows; coverage is the percentage of flows exercised.
Functional suitability
The ISO 25010 characteristic combining functional completeness, functional correctness and functional appropriateness, describing whether the system provides the required functions with the required accuracy.
Usability subcharacteristics
Learnability, operability, user error protection, user interface aesthetics and accessibility; the test analyst verifies these with checklists and user-centred scenarios.
Interoperability testing
A compatibility subcharacteristic verifying that the system exchanges and uses information correctly with other systems, checking data formats, interface protocols and error handling.
Accessibility testing
Testing whether people with disabilities can use the product, usually against standards such as WCAG, whose principles are perceivable, operable, understandable and robust.
Portability testing
Checking adaptability, installability and replaceability, that is, that the product works correctly across the specified hardware, software and organisational environments.
Data conversion testing
Verifying that data migrated from a legacy or source system retains the required completeness, correctness and integrity, using record counts, checksums and key field comparisons.
Inspection
The most formal review type: defined roles and entry and exit criteria, moderator-led individual preparation with checklists, documented findings and a formal follow-up of defect resolution.
Technical review
A formal review performed by technically qualified peers who examine a work product for technical correctness and adherence to standards; it may proceed without a fully defined process.
Walkthrough
A review in which the author leads reviewers through the work product, seeking feedback and establishing a shared understanding; it can also serve to train new team members.
Review roles
Manager, moderator, author, reviewers, review leader and scribe. The test analyst typically acts as a reviewer, judging testability, completeness and verifiability of the work product.
Perspective-based reading
A review technique where each reviewer examines the work product from a specific stakeholder viewpoint, such as tester, designer or user, guided by viewpoint-specific checklists.
Entry criteria for reviews
Conditions that must be met before a formal review starts, such as the document being complete and available; failure to meet them normally leads to postponement.
Severity versus priority
Severity is the impact of a defect on the system and is assigned by testers; priority is the urgency of correction, agreed with business stakeholders, and the two are independent.
Defect report content
At minimum: unique identifier, title, author and date, environment, steps to reproduce, expected and actual results, severity, priority, status and references to the test basis.
Defect removal efficiency
The percentage of defects found before release out of all defects found before and after release; a measure of how effective testing was at removing defects.
Defect density
The number of defects identified in a work product divided by a size measure such as function points, lines of code or test cases; used to compare modules and estimate remaining defects.
Requirements traceability matrix
A table linking test basis items to test conditions, test cases and results; it supports coverage measurement and impact analysis when requirements change.
Defect triage meeting
A regular meeting where testers, developers and business stakeholders review reported defects to agree status, severity, priority and whether each is fixed, deferred or rejected.