Quick reference

Risk-Based Testing

  • Risk level = likelihood of occurrence × impact (probability × consequence); rank product risks to allocate test effort and depth.

  • Product risk concerns quality characteristics of the test object; project risk concerns management and control of the project (schedule, staffing, tooling).

  • Risk-based testing is a continuous activity: identify, assess, mitigate via test design/execution, then re-evaluate as information changes.

  • PRISMA or similar techniques use likelihood and impact factors scored on scales; the product of the factors gives the risk class.

  • Pareto principle: a small proportion of risk items typically accounts for most defect-caused failures; coverage of high-risk items is prioritized.

  • Risk mitigation includes choosing test techniques, coverage levels, independence of testers, and review intensity proportional to risk.

  • Residual risk is the risk remaining after testing; it must be communicated to stakeholders for release decisions.

  • Risk-based regression testing selects test cases by risk of change impact and business criticality, not by test age or convenience.

Quick reference

White Box Testing

  • Statement coverage: percentage of executable statements exercised; it is the weakest structural coverage criterion and does not guarantee decision coverage.

  • Decision (branch) coverage requires each decision outcome (true and false) to be exercised at least once; it subsumes statement coverage.

  • Condition coverage exercises each atomic condition to both true and false but does not require decision outcomes to be exercised.

  • Decision-condition coverage requires both decision outcomes and each atomic condition's true/false values to be exercised.

  • MC/DC requires each atomic condition to independently affect the decision outcome while all other conditions are held fixed.

  • Cyclomatic complexity V(G) = E − N + 2 (edges − nodes + 2), or number of decision points + 1; it equals the number of linearly independent paths.

  • Basis path testing derives a set of linearly independent paths equal to V(G) and designs at least one test per path.

  • Data flow testing uses definitions (defs) and uses (c-uses, p-uses); all-defs, all-uses, and all-du-paths are coverage levels of increasing strength.

  • Loop testing applies minimum, maximum, and one-beyond-maximum iteration counts, plus skipped-loop and interior-path variants.

Quick reference

Static and Dynamic Analysis

  • Static analysis examines code or models without execution; dynamic analysis executes code, typically instrumented, to observe runtime behavior.

  • Static analysis detects violations of coding standards, unreachable code, unused variables, and suspicious data flow patterns before test execution.

  • Control flow anomalies detectable statically include unreachable code, multiple exits from a loop, and unconditional jumps into loop bodies.

  • Data flow anomaly: a variable defined but never used (dead), used before definition (undefined), or defined twice without intervening use.

  • Dynamic analysis detects memory leaks, unassigned pointers, pointer arithmetic errors, and array bound violations during execution.

  • Static analysis produces false positives; findings must be reviewed and triaged, not treated as confirmed defects.

  • Static analysis is applied early in the lifecycle and is more cost-effective per defect than dynamic detection of the same class.

  • Dynamic analysis tools instrument code and add overhead, so they are typically run on selected builds or test environments.

Quick reference

Non-Functional Testing

  • Performance testing types: load (expected load), stress (beyond limits), spike (sudden load change), endurance/soak (sustained load), scalability (increasing load).

  • ISO 25010 quality characteristics include performance efficiency, reliability, security, compatibility, usability, and maintainability.

  • Performance efficiency sub-characteristics: time behavior, resource utilization, and capacity.

  • Reliability sub-characteristics: maturity, availability, fault tolerance, and recoverability.

  • Usability testing evaluates effectiveness, efficiency, satisfaction, and freedom from risk in a specified context of use.

  • Security testing targets confidentiality, integrity, authentication, authorization, non-repudiation, and availability.

  • Non-functional tests need measurable acceptance criteria (e.g., 95th percentile response time, throughput, error rate) defined before execution.

  • Load test results must be analyzed with monitoring data (CPU, memory, I/O, network) to distinguish application bottlenecks from environment limits.

Quick reference

Test Automation

  • Test automation is the use of software to perform or support test activities; it does not replace test design or judgment.

  • Automation ROI depends on initial investment, maintenance cost, execution frequency, and lifetime of the test object.

  • The test automation pyramid favors many unit tests, fewer service/API tests, and few UI tests, reflecting cost and fragility.

  • A test automation architecture separates test cases, test logic (keywords/actions), and test harness/drivers for maintainability.

  • Design patterns: Page Object Model encapsulates UI structure; Keyword-Driven and Data-Driven separate data from script logic.

  • Automated test maintenance is driven by changes to the SUT, test data, environment, and tool versions; brittle locators increase maintenance cost.

  • Automated tests need their own verification: false positives (tests pass when they should fail) and false negatives undermine trust.

  • Continuous integration executes automated tests on every change; test selection and parallelization control feedback time.

  • Automation supports static analysis, coverage measurement, and dynamic analysis as well as regression test execution.