IWCF WIPC Level 2 study materials
IWCF WIPC Level 2 study resources

IWCF WIPC Level 2: Coiled Tubing Operations

IWCF WIPC Level 2 · Work through your exam, one topic at a time.

All guide sections

Coiled Tubing Operations

Coiled Tubing Operations tests pressure control around a continuous pipe string, BOP stack configuration, check-valve philosophy, and the limits that make CT different from jointed pipe.

Core rules

  • CT is not a standalone barrier. The barrier envelope is the CT string plus the stripper, BOP rams, and downhole check valves.
  • The CT BOP stack normally includes blind/shear rams, pipe rams, slip rams, and an annular or stripper. Function-test and pressure-test before the job and after BHA changes.
  • Fit at least two back-pressure check valves in the BHA; the CT string itself can be plugged by solids or damaged.
  • Monitor stripper leakage, CT weight, circulation pressure, and fatigue. Do not exceed the CT operator's fatigue or ovality limits.
  • Keep the lubricator or riser length compatible with the BHA.

Worked example

A 1.75 in CT string has a 1.5 in ID and is 3,500 m long. Internal area = π/4 × (1.5 × 0.0254)² ≈ 0.00114 m². Volume = 0.00114 × 3,500 ≈ 3.99 m³, or about 25 bbl. This volume is used to size a displacement pill. If pump output is 0.1 m³/min, displacement takes about 40 min, plus correction for CT stretch and shoe position.

Traps

  • Treating CT as the only barrier.
  • Forgetting to test the BOP after changing the BHA.
  • Using a single check valve as the only backflow barrier.
  • Ignoring CT stretch when correlating depth.
  • Shearing CT without confirming the shear ram can cut that size and grade.