IWCF WIPC Level 2 study plan

IWCF WIPC Level 2 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Completion Operations (compulsory) & Completion Equipment (compulsory)

  • Define the five primary completion types (single-zone cased-hole, openhole, gravel-packed, multi-zone, intelligent) and list the barrier envelope of each from memory

  • Sketch a tubing string from memory labeling tubing joints, blast joint, flow coupling, no-go nipple, landing nipple, sealbore packer, and safety valve with the function of each in one line

  • Explain how a packer sets and releases mechanically, hydraulically, and by wireline, and identify which setting method each of five named tools uses

  • Describe the sequence of a basic cased-hole completion from perforating through packer setting to tree installation

  • List the API and ISO references that govern tubing, packers, and completion accessories and state what each covers

Your checkpoint

A one-page hand-drawn completion schematic with 15+ labeled components and a 200-word written walkthrough of the installation sequence, self-marked against the course notes

Week 2

Completion Operations (compulsory) & Completion Equipment (compulsory)

  • Compare packer types ( retrievable, permanent, sealbore, gravel-pack, ESP) on setting method, release method, pressure rating, and temperature rating in a table built from memory then corrected

  • Explain the function and failure modes of subsurface safety valves (SCSSV/SSSV) including flapper, ball, tubing pressure actuation, and control line

  • Describe gas lift valve operation, mandrel types, and unloading sequence

  • Identify completion accessories (circulating valves, chemical injection mandrels, gauge carriers, sand screens, inflow control devices) and state where each sits in the string

  • Calculate hydrostatic pressure and differential pressure across a packer for three given depth and fluid-weight scenarios

Your checkpoint

A 12-row equipment comparison table (tool, setting method, release method, rating, typical position) plus worked solutions to three packer differential-pressure calculations

Week 3

Completion Operations (compulsory) & Completion Equipment (compulsory)

  • Walk through the barrier philosophy for a live well: primary, secondary, and tertiary barriers and which completion equipment provides each

  • Explain annular pressure buildup, trapped annulus, and thermal expansion effects and how completion design mitigates them

  • Describe sand control selection logic (standalone screen, gravel pack, frac pack) against formation and production parameters

  • Outline completion fluid selection, filtration, and cleanliness requirements and the consequences of solids in the wellbore

  • Explain how a completion is tested after installation (pressure test, inflow test, valve function test) and what constitutes a valid test

Your checkpoint

A written barrier diagram for one worked example well naming every barrier, its test method, and its acceptance criterion, reviewed against the well control notes

Week 4

Coiled Tubing Operations (optional)

  • Describe coiled tubing surface equipment: injector head, stripper, BOP stack, reel, and pressure control equipment, and state the function and failure mode of each

  • Explain CT string fatigue, cycle counting, and the role of the fatigue management system, and interpret a sample fatigue log

  • Describe CT well control: stripping, snubbing with CT, and the procedure for tripping with pressure on the well

  • Explain CT applications (wellbore cleanout, milling, acidizing, nitrogen lifting, plug setting) and the limits of each

  • Calculate CT reach or a basic force balance for a given well geometry and string size

Your checkpoint

A completed CT job outline for a hypothetical cleanout: equipment list, step-by-step procedure, pressure control points, and one worked reach or force calculation

Week 5

Wireline Operations (optional)

  • Distinguish slickline, braided wireline, and electric line by capability, typical use, and pressure control equipment

  • Describe wireline pressure control: grease injection head, flow tubes, BOP, lubricator, and the procedure for lubricating in and out of a live well

  • Explain wireline logging conveyance, depth control, and the risks of toolstring sticking and cable damage

  • Describe common wireline interventions (perforating, plug setting and retrieval, gauge runs, valve shifting) and their well control implications

  • Explain wireline tension, weak point selection, and the procedure when a toolstring becomes stuck

Your checkpoint

A wireline pressure control checklist for lubricating a toolstring into a live well, with each step annotated by the hazard it controls, plus a one-page stuck-toolstring decision tree

Week 6

Snubbing Operations (optional)

  • Describe snubbing unit components (slips, traveling and stationary, jack, rotary table, BOP stack, work window) and the function of each

  • Explain the difference between stripping and snubbing and when each is used, including pipe-light and pipe-heavy transition

  • Describe snubbing well control: kick detection, shut-in, and the procedure for handling pressure while tripping

  • Explain buckling and the effect of snubbing forces on pipe, and how to calculate the point of neutral buoyancy

  • List snubbing applications (live well workovers, plug drilling, fishing, underbalanced operations) and their hazards

Your checkpoint

A written snubbing procedure for tripping pipe into a live well, including pipe-light to pipe-heavy transition, with a worked neutral-buoyancy calculation for a given pipe and well pressure

Week 7

Subsea Operations (optional or standalone)

  • Describe subsea completion architecture: subsea tree, tubing hanger, wellhead, umbilical, and control system, and the function of each

  • Explain subsea well control: BOP stack, EDS, and the barrier philosophy for a subsea well

  • Describe subsea intervention methods (rig, riserless light well intervention, subsea wireline, ROV) and their limits

  • Explain subsea tree types (vertical, horizontal) and their installation and workover implications

  • Describe hydrate, wax, and asphaltene risks in subsea flowlines and how they are managed

Your checkpoint

A one-page subsea completion schematic with 12+ labeled components and a written comparison of vertical versus horizontal tree selection for two given field scenarios

Week 8

Completion Operations (compulsory) & Completion Equipment (compulsory) & Coiled Tubing Operations (optional) & Wireline Operations (optional) & Snubbing Operations (optional) & Subsea Operations (optional or standalone)

  • Revisit every domain's weak points identified in weeks 1-7 and close each gap with a written explanation

  • Complete a timed 60-question mixed mock covering all six domains and record the score by domain

  • Explain the common well control thread across CT, wireline, snubbing, and subsea operations in a single written summary

  • Rehearse the barrier philosophy and pressure control fundamentals until they can be stated without notes

  • Build a one-page formula and reference sheet for hydrostatics, differential pressure, and neutral buoyancy

Your checkpoint

A timed 60-question mock exam scored by domain with a written remediation list for every domain below 70%, plus the completed formula sheet

Milestones

Week 2: Can label a completion schematic and state the setting and release method of five packer types from memory without notes

Week 4: Can walk through a CT pressure control stack and a cleanout procedure end to end, and correctly solve one reach or force calculation

Week 6: Can explain stripping versus snubbing and the pipe-light to pipe-heavy transition, and correctly solve one neutral-buoyancy calculation

Week 8: Scores at least 70% on the timed 60-question mixed mock with no domain below 60%, and has a written remediation list for every weak area