IWCF WIPC Level 2 study plan
IWCF WIPC Level 2 · Give each week a clear focus.
8 weeks · About 7 hours per week
Completion Operations (compulsory) & Completion Equipment (compulsory)
Define the five primary completion types (single-zone cased-hole, openhole, gravel-packed, multi-zone, intelligent) and list the barrier envelope of each from memory
Sketch a tubing string from memory labeling tubing joints, blast joint, flow coupling, no-go nipple, landing nipple, sealbore packer, and safety valve with the function of each in one line
Explain how a packer sets and releases mechanically, hydraulically, and by wireline, and identify which setting method each of five named tools uses
Describe the sequence of a basic cased-hole completion from perforating through packer setting to tree installation
List the API and ISO references that govern tubing, packers, and completion accessories and state what each covers
Your checkpoint
A one-page hand-drawn completion schematic with 15+ labeled components and a 200-word written walkthrough of the installation sequence, self-marked against the course notes
Completion Operations (compulsory) & Completion Equipment (compulsory)
Compare packer types ( retrievable, permanent, sealbore, gravel-pack, ESP) on setting method, release method, pressure rating, and temperature rating in a table built from memory then corrected
Explain the function and failure modes of subsurface safety valves (SCSSV/SSSV) including flapper, ball, tubing pressure actuation, and control line
Describe gas lift valve operation, mandrel types, and unloading sequence
Identify completion accessories (circulating valves, chemical injection mandrels, gauge carriers, sand screens, inflow control devices) and state where each sits in the string
Calculate hydrostatic pressure and differential pressure across a packer for three given depth and fluid-weight scenarios
Your checkpoint
A 12-row equipment comparison table (tool, setting method, release method, rating, typical position) plus worked solutions to three packer differential-pressure calculations
Completion Operations (compulsory) & Completion Equipment (compulsory)
Walk through the barrier philosophy for a live well: primary, secondary, and tertiary barriers and which completion equipment provides each
Explain annular pressure buildup, trapped annulus, and thermal expansion effects and how completion design mitigates them
Describe sand control selection logic (standalone screen, gravel pack, frac pack) against formation and production parameters
Outline completion fluid selection, filtration, and cleanliness requirements and the consequences of solids in the wellbore
Explain how a completion is tested after installation (pressure test, inflow test, valve function test) and what constitutes a valid test
Your checkpoint
A written barrier diagram for one worked example well naming every barrier, its test method, and its acceptance criterion, reviewed against the well control notes
Coiled Tubing Operations (optional)
Describe coiled tubing surface equipment: injector head, stripper, BOP stack, reel, and pressure control equipment, and state the function and failure mode of each
Explain CT string fatigue, cycle counting, and the role of the fatigue management system, and interpret a sample fatigue log
Describe CT well control: stripping, snubbing with CT, and the procedure for tripping with pressure on the well
Explain CT applications (wellbore cleanout, milling, acidizing, nitrogen lifting, plug setting) and the limits of each
Calculate CT reach or a basic force balance for a given well geometry and string size
Your checkpoint
A completed CT job outline for a hypothetical cleanout: equipment list, step-by-step procedure, pressure control points, and one worked reach or force calculation
Wireline Operations (optional)
Distinguish slickline, braided wireline, and electric line by capability, typical use, and pressure control equipment
Describe wireline pressure control: grease injection head, flow tubes, BOP, lubricator, and the procedure for lubricating in and out of a live well
Explain wireline logging conveyance, depth control, and the risks of toolstring sticking and cable damage
Describe common wireline interventions (perforating, plug setting and retrieval, gauge runs, valve shifting) and their well control implications
Explain wireline tension, weak point selection, and the procedure when a toolstring becomes stuck
Your checkpoint
A wireline pressure control checklist for lubricating a toolstring into a live well, with each step annotated by the hazard it controls, plus a one-page stuck-toolstring decision tree
Snubbing Operations (optional)
Describe snubbing unit components (slips, traveling and stationary, jack, rotary table, BOP stack, work window) and the function of each
Explain the difference between stripping and snubbing and when each is used, including pipe-light and pipe-heavy transition
Describe snubbing well control: kick detection, shut-in, and the procedure for handling pressure while tripping
Explain buckling and the effect of snubbing forces on pipe, and how to calculate the point of neutral buoyancy
List snubbing applications (live well workovers, plug drilling, fishing, underbalanced operations) and their hazards
Your checkpoint
A written snubbing procedure for tripping pipe into a live well, including pipe-light to pipe-heavy transition, with a worked neutral-buoyancy calculation for a given pipe and well pressure
Subsea Operations (optional or standalone)
Describe subsea completion architecture: subsea tree, tubing hanger, wellhead, umbilical, and control system, and the function of each
Explain subsea well control: BOP stack, EDS, and the barrier philosophy for a subsea well
Describe subsea intervention methods (rig, riserless light well intervention, subsea wireline, ROV) and their limits
Explain subsea tree types (vertical, horizontal) and their installation and workover implications
Describe hydrate, wax, and asphaltene risks in subsea flowlines and how they are managed
Your checkpoint
A one-page subsea completion schematic with 12+ labeled components and a written comparison of vertical versus horizontal tree selection for two given field scenarios
Completion Operations (compulsory) & Completion Equipment (compulsory) & Coiled Tubing Operations (optional) & Wireline Operations (optional) & Snubbing Operations (optional) & Subsea Operations (optional or standalone)
Revisit every domain's weak points identified in weeks 1-7 and close each gap with a written explanation
Complete a timed 60-question mixed mock covering all six domains and record the score by domain
Explain the common well control thread across CT, wireline, snubbing, and subsea operations in a single written summary
Rehearse the barrier philosophy and pressure control fundamentals until they can be stated without notes
Build a one-page formula and reference sheet for hydrostatics, differential pressure, and neutral buoyancy
Your checkpoint
A timed 60-question mock exam scored by domain with a written remediation list for every domain below 70%, plus the completed formula sheet
Milestones
Week 2: Can label a completion schematic and state the setting and release method of five packer types from memory without notes
Week 4: Can walk through a CT pressure control stack and a cleanout procedure end to end, and correctly solve one reach or force calculation
Week 6: Can explain stripping versus snubbing and the pipe-light to pipe-heavy transition, and correctly solve one neutral-buoyancy calculation
Week 8: Scores at least 70% on the timed 60-question mixed mock with no domain below 60%, and has a written remediation list for every weak area