JNCIE-ENT study materials
JNCIE-ENT study resources

JNCIE-ENT study plan

JNCIE-ENT · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

System Management and Monitoring & Layer 2 Switching and Features

  • Build a lab topology of at least four Junos devices (vMX/vQFX or mixed) with out-of-band management reachable from a single jump host

  • Configure commit-confirm, rescue configuration, and automatic rollback on each device, then deliberately break and restore one device to prove recovery works

  • Set up syslog to a collector plus SNMPv3 polling and verify both receive data from every device

  • Capture baseline interface counters and routing tables with operational commands and store them as reference files

Your checkpoint

A version-controlled lab diagram plus a one-page runbook listing the exact recovery commands, verified by a screenshot-free written log of the break/fix exercise

Week 2

System Management and Monitoring & Layer 2 Switching and Features

  • Configure a Virtual Chassis or MC-LAG pair and verify control-plane and data-plane redundancy by disabling one member

  • Implement storm control, MAC limiting, and DHCP snooping on access ports and confirm each feature triggers as expected

  • Configure 802.1X with a RADIUS server (or a simulated one) on at least two ports and test accept, reject, and re-authentication

  • Automate collection of interface error statistics and log them on a schedule via a Python or PyEZ script

Your checkpoint

A written test report documenting each Layer 2 feature's trigger condition and observed output, plus the working automation script

Week 3

Layer 2 Switching and Features & Layer 3 Switching and Features

  • Configure RSTP and MSTP across a redundant triangle and verify convergence times and root election after a link failure

  • Build a multi-area OSPFv2 and OSPFv3 topology and verify adjacency, summarization, and stub areas behave as designed

  • Configure VRRP or IS-IS, or both, with authentication and verify failover and graceful restart

  • Tune IGMP snooping and PIM sparse mode on a small multicast segment and confirm group membership and RPF paths

Your checkpoint

A convergence matrix table listing each protocol, the failure injected, and the measured recovery time

Week 4

Layer 3 Switching and Features & EVPN and Services

  • Configure BGP with at least three peers, including route reflection, and verify policy application with show commands and traceroute

  • Deploy EVPN-VXLAN with a two-leaf, one-spine fabric and verify MAC and IP learning in the EVPN table

  • Configure an Ethernet segment with EVPN multihoming (ESI-LAG) and test link failure and designated forwarder election

  • Implement route policy to prefer one path and confirm with the routing table and BGP output

Your checkpoint

A fabric design document with the working configuration, EVPN table output, and a failover test log

Week 5

EVPN and Services & System Management and Monitoring

  • Configure EVPN Type-5 route advertisement for a tenant and verify inter-VLAN routing through the fabric

  • Set up a Layer 3 VPN over MPLS or an EVPN-based alternative and verify route exchange between customer sites

  • Add CoS classification and scheduling to the fabric and verify behavior under congestion with a traffic generator

  • Configure RPM probes and streaming telemetry to monitor fabric health

Your checkpoint

An end-to-end service test showing tenant traffic, EVPN route types in use, and CoS behavior under load

Week 6

Class of Service (CoS) & System Management and Monitoring

  • Design and implement a full CoS hierarchy: classifiers, rewrite rules, schedulers, drop profiles, and shaping on an uplink

  • Verify multi-field classification matches on the intended traffic and rewrite markings are correct at egress

  • Test WRED and priority scheduling under congestion and record drop and queue statistics

  • Configure per-class accounting and use it to prove the intended bandwidth allocation

Your checkpoint

A CoS design table mapping traffic class to queue, scheduler parameters, and measured behavior, with the verified configuration

Week 7

System Management and Monitoring & Layer 2 Switching and Features & Layer 3 Switching and Features

  • Build a full mock lab scenario combining switching, routing, and management features in a single topology

  • Practice timed troubleshooting on injected faults and document the diagnostic path

  • Review weak areas from earlier weeks and re-run the failing tests

  • Harden the configuration with firewall filters, rate limiting, and secure management access

Your checkpoint

A timed troubleshooting log for at least five injected faults with root cause and resolution time for each

Week 8

System Management and Monitoring & EVPN and Services & Class of Service (CoS)

  • Run a full timed practice exam under exam conditions with no notes

  • Review every missed item and write the correct approach for each

  • Re-verify the two weakest domains with fresh hands-on configurations

  • Finalize a checklist of commands and design patterns used most often

Your checkpoint

A scored practice exam result with a written remediation list and a final command checklist

Milestones

Week 2: Can recover any lab device from a broken commit using commit-confirm and rescue configuration without external notes

Week 4: Can build a working EVPN-VXLAN fabric with multihoming from scratch and explain the EVPN route types learned

Week 6: Can design and verify a complete CoS hierarchy under congestion with measured evidence

Week 8: Achieves a passing score on the timed practice exam and has a written remediation plan for every missed area