JNCIP-DC study materials
JNCIP-DC study resources

JNCIP-DC study plan

JNCIP-DC · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Data Center Architecture and Deployment & Data Center Switching and Fabric Technologies

  • Map the JNCIP-DC blueprint against your current knowledge and log a confidence score (1-5) plus a gap note for each domain

  • Sketch a two-tier VXLAN EVPN spine-leaf topology from memory, labeling underlay links, loopbacks, anycast gateways, and border roles

  • Configure and verify an OSPF or IS-IS underlay on a lab fabric, then confirm loopback reachability across all leaf and spine nodes

  • Explain when to choose a collapsed-core versus spine-leaf design and list the failure-domain tradeoffs of each

Your checkpoint

A one-page architecture diagram plus a written gap analysis covering all six domains with confidence scores

Week 2

Data Center Switching and Fabric Technologies

  • Build a vPC domain between two leaf switches and verify peer-link, keepalive, and orphan-port behavior

  • Compare vPC and EVPN multihoming for dual-homed server attachment and document when each is preferred

  • Configure VLANs, trunk allowed lists, and spanning-tree guards, then predict and confirm which ports forward

  • Test vPC failure scenarios (peer-link down, keepalive loss, member link loss) and record resulting forwarding states

Your checkpoint

A troubleshooting log of three vPC failure scenarios with observed states and the commands used to confirm each

Week 3

Data Center Switching and Fabric Technologies & Data Center Routing and Overlay Networking

  • Configure a VXLAN EVPN fabric with BGP EVPN as the control plane and verify Type-2 and Type-3 route advertisement

  • Trace a MAC-to-route path for a locally learned host and confirm the corresponding EVPN route on a remote leaf

  • Compare centralized versus distributed anycast gateway and configure distributed anycast gateway on the lab fabric

  • Verify data-plane encapsulation by inspecting VXLAN headers and confirming VNI-to-VLAN mappings

Your checkpoint

A working two-leaf, two-spine EVPN fabric with hosts communicating across VNIs, documented with show-command output proving route and data-plane state

Week 4

Data Center Routing and Overlay Networking & Data Center Architecture and Deployment

  • Configure EVPN route types 5 and verify prefix advertisement between VRFs across the fabric

  • Design and implement multi-site EVPN with a border gateway and document the control-plane and data-plane paths

  • Compare EVPN multihoming and vPC for a given server requirement and justify the choice in writing

  • Validate underlay and overlay convergence by shutting a spine link and timing reconvergence

Your checkpoint

A multi-site or inter-VRF design document with verification output and measured convergence timings

Week 5

Data Center Security and Network Services

  • Configure port security, DHCP snooping, dynamic ARP inspection, and storm control on access ports and verify each blocks the intended traffic

  • Configure a stateful firewall or security policy between VRFs and confirm permitted versus denied flows

  • Implement CoPP and control-plane protection, then verify which exception traffic is policed

  • Document a segmentation strategy that maps tenants to VRFs and VLANs with explicit policy boundaries

Your checkpoint

A security configuration checklist with pass/fail evidence for each control tested in the lab

Week 6

Data Center Automation and Orchestration

  • Write a repeatable configuration template or script that provisions a new leaf into the fabric

  • Automate retrieval of fabric state and export it to a structured format for comparison

  • Use a configuration-management or telemetry tool to detect drift between intended and running configuration

  • Version-control your automation artifacts with meaningful commits and a documented rollback path

Your checkpoint

A working automation script or template that adds a leaf and produces a diff report, stored in a version-controlled repository

Week 7

Data Center Monitoring, Troubleshooting, and Operations & Data Center Switching and Fabric Technologies

  • Build a troubleshooting decision tree for EVPN route not appearing, traffic not forwarding, and vPC inconsistency symptoms

  • Capture and analyze streaming telemetry or SNMP data to identify a degraded link or interface error trend

  • Inject three faults into the lab fabric and resolve each within a self-imposed time limit

  • Document the exact commands and log locations you would use for each fault class

Your checkpoint

A troubleshooting playbook covering at least five fault classes with commands, expected output, and resolution steps

Week 8

Data Center Architecture and Deployment & Data Center Switching and Fabric Technologies & Data Center Routing and Overlay Networking & Data Center Security and Network Services & Data Center Automation and Orchestration & Data Center Monitoring, Troubleshooting, and Operations

  • Re-score each domain against your week-1 confidence baseline and identify remaining weak areas

  • Complete timed practice scenarios that combine switching, routing, security, and automation tasks

  • Re-read your gap analysis and playbook, correcting any inaccurate or outdated notes

  • Write a one-page pre-exam summary of the highest-risk topics and last-minute verification commands

Your checkpoint

A final readiness report with updated domain scores, remaining gaps, and a one-page pre-exam summary sheet

Milestones

Week 2: You can build a vPC pair from scratch and explain forwarding behavior when the peer-link fails, without referring to notes

Week 4: Hosts on different VNIs and VRFs communicate across a multi-site or inter-VRF EVPN fabric, proven by route and ping output

Week 6: A new leaf can be provisioned by automation and drift between intended and running configuration is detected and reported

Week 8: All six domains score at least 4 of 5 on your self-assessment, and you resolve injected faults within your time limits