JNCIS-MistAI-Wired study materials
JNCIS-MistAI-Wired study resources

JNCIS-MistAI-Wired study plan

JNCIS-MistAI-Wired · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Wired Switching Fundamentals

  • Map each layer-2 concept tested by the exam (VLANs, trunking, 802.1Q tagging, spanning tree variants, link aggregation) to a one-line definition you can recite without notes

  • Draw from memory the packet-walk of a frame crossing an access port, an 802.1Q trunk, and a LAG bundle, labeling where tags are added and stripped

  • Configure two VLANs, an 802.1Q trunk, and a LACP bundle on lab switches and verify forwarding with show commands

  • Differentiate RSTP, STP, and MSTP port roles and convergence behavior well enough to predict which port blocks in a given topology

Your checkpoint

A one-page handwritten L2 cheat sheet plus saved lab configs and output captures proving VLAN, trunk, and LAG forwarding

Week 2

Wired Switching Fundamentals

  • Explain how a Mist-supported switch is adopted, what the claim code does, and which states a switch passes through from unclaimed to connected

  • Describe how switch configuration is derived from site settings, templates, and per-port profiles, and predict which layer wins when they conflict

  • Configure PoE budgets, port profiles, and trunk/access assignments for a mixed wired/wireless closet in the lab

  • Compare static, LACP, and LAG behavior on uplinks and justify which to choose for a given closet topology

  • Identify how LLDP and MAC-derived data feed the Mist cloud inventory and why that matters for visibility

Your checkpoint

A written closet design (ports, VLANs, PoE budget, uplink type) with matching lab configuration applied and verified

Week 3

Mist Wired Assurance Configuration and Deployment

  • Set up a Mist organization, site, and switch template from scratch and document each step with screenshots or notes

  • Configure switch-level and port-level settings through the dashboard, then apply the same intent via site templates and confirm the result

  • Build port profiles for access, trunk, and AP uplink use cases and reuse them across multiple switches

  • Validate that a newly adopted switch inherits the intended configuration and explain any drift you observe

Your checkpoint

A repeatable adoption runbook covering org/site creation, template assignment, port profiles, and verification checks

Week 4

Mist Wired Assurance Configuration and Deployment & Mist AI Operations and Troubleshooting for Wired Networks

  • Configure and verify a Mist edge/cloud connection path for a switch, including what happens when the cloud is unreachable

  • Use the dashboard switch insights, port statistics, and event logs to answer three troubleshooting scenarios you invent

  • Explain how firmware upgrade policies work and stage a controlled upgrade on a lab switch

  • Interpret PoE negotiation and power-budget alarms and resolve one simulated over-budget condition

Your checkpoint

A troubleshooting worksheet with three scenarios, the exact dashboard views used, and the resolution for each

Week 5

Mist AI Operations and Troubleshooting for Wired Networks

  • Trace a wired client through the client page: MAC learning, VLAN assignment, DHCP, and authentication state

  • Configure 802.1X or MAC-based access on a switch port and read the resulting authentication events

  • Use Marvis or the AI-driven insights to diagnose a simulated port-down or flapping-link issue, and verify the recommendation against raw logs

  • Distinguish symptoms of a physical layer fault, a VLAN mismatch, and a spanning tree loop by the evidence each leaves

  • Build a short list of the metrics you would watch for proactive wired monitoring and where each lives in the UI

Your checkpoint

A diagnostic decision tree for common wired faults, each branch tied to a specific dashboard view or log

Week 6

Wired Network Automation and Integration

  • Use the Mist REST API to list sites, read switch statistics, and pull port configuration with an API token

  • Script a bulk port-profile update across several switches and verify the change in the dashboard

  • Explain webhook subscriptions and configure one to receive switch events into a local listener

  • Describe how Mist integrates with NAC or RADIUS and where the switch sits in that flow

  • Compare API-driven configuration against template-driven configuration and state when each is appropriate

Your checkpoint

A working script plus a captured webhook payload demonstrating read, write, and event-driven automation

Week 7

Wired Network Automation and Integration & Mist AI Operations and Troubleshooting for Wired Networks

  • Automate a recurring operational task such as pulling port error counters or auditing VLAN consistency across closets

  • Design an alerting rule set that surfaces real wired problems without flooding, and justify each rule

  • Re-run your week 5 diagnostic tree using only API and automation outputs to confirm it still holds

  • Document an escalation path from automated alert to dashboard investigation to resolution

Your checkpoint

An automation-and-alerting package: script, alert rules, and a runbook linking alerts to diagnostic steps

Week 8

Wired Switching Fundamentals & Mist Wired Assurance Configuration and Deployment & Mist AI Operations and Troubleshooting for Wired Networks & Wired Network Automation and Integration

  • Review every domain against your own notes and close the gaps you flagged in weeks 1 through 7

  • Complete timed practice sets weighted to your weakest domain and log every miss with the underlying concept

  • Re-teach the three concepts you got wrong most often out loud or in writing until you can explain them cleanly

  • Walk through a full end-to-end scenario: design a closet, deploy it, troubleshoot a fault, and automate a check

Your checkpoint

A final gap-closure log showing every missed concept, the corrected explanation, and a clean end-to-end scenario walkthrough

Milestones

Week 2: You can design and configure a complete switch closet from memory, including VLANs, trunks, LAG uplinks, and PoE budget, without consulting notes

Week 4: You can adopt a switch into a templated site and diagnose a simulated fault using dashboard insights, logs, and firmware/PoE views

Week 6: You can read switch state and push a configuration change through the Mist API, and you have received a webhook event into a local listener

Week 8: Your gap-closure log shows every practice miss resolved, and you can complete an end-to-end design, deploy, troubleshoot, and automate scenario unaided