Tub-to-Shower Conversion: Drain, Pan, and Supply
Bath remodel: a 30 in. by 60 in. alcove tub is being replaced by a tile shower. The existing tub drain is 1-1/2 in. ABS with a 1-1/2 in. P-trap and a 4 ft trap arm to a 2 in. vent stack. The floor is 2x10 joists at 16 in. on center with 3/4 in. plywood. The client wants a curbless entry, a 12 in. rain head (2.5 gpm rated), and a handheld on a slide bar. The tile contractor intends to keep the 1-1/2 in. drain and to tile over the plywood using a roll-on waterproof membrane, building the slope out of thin-set. Water supply is 1/2 in. PEX run 25 ft from a 3/4 in. trunk with 55 psi static pressure. Trap-arm limits: 1-1/2 in. = 6 ft, 2 in. = 8 ft.
1. Evaluate the existing drain and trap for the new shower. What has to change and what can stay?
Read the worked answer
Must change:
- The 1-1/2 in. drain and trap. A shower requires a 2 in. drain. This is not a judgment call - the fixture changed, so the fixture drain, trap, and trap arm all go to 2 in.
- The tub waste/overflow cannot be reused. A shower needs a clamping-ring or bonded-flange shower drain with weep holes, set with the flange at the finished tile plane.
Can stay:
- The trap-arm length. At 2 in., the limit is 8 ft and the existing run is 4 ft. Vent distance is fine.
- The vent stack size should be checked against the fixture-unit load of the new shower plus anything else on the stack, but the 4 ft arm is not the problem.
Coordinate with the framer before the plumbing is moved:
- A curbless shower needs the drain assembly and trap below the finished floor. A 2 in. trap plus the drain body needs roughly 6-8 in. of depth from the tile to the bottom of the trap arm - more than a 2x10 joist bay gives you once you add the preslope.
- Recessing or dropping the joists is a structural change; get it engineered or use a linear drain at the perimeter wall where the trap can sit in a dropped bay.
Trap detail: the trap must be directly below the drain outlet, and the trap weir must sit at least 2 in. below the drain.
2. The tile contractor's plan is thin-set for slope and roll-on membrane over plywood. What is wrong and what is the correct assembly?
Read the worked answer
What is wrong:
- Thin-set is not a slope material. It cannot be built reliably to a consistent fall and it will crack.
- Roll-on membrane directly on plywood over a framed floor depends entirely on the substrate being dimensionally stable; over 16 in. on center joists with deflection, that is a failure waiting to happen unless the manufacturer's substrate requirements are met.
- A roll-on membrane needs a drain with a bonding flange. A clamping-ring drain with a vinyl liner is a different system. Mixing the two leaks.
Correct assembly (one listed system, start to finish):
- Substrate per the membrane manufacturer - typically a cement backer or a mortar bed over a slip sheet, not bare plywood.
- Preslope to the drain at 1/4 in. per ft. For a drain near center of a 30 in. wide shower, the far corner is about 2.5 ft away: 2.5 x 1/4 = roughly 5/8 in. minimum fall.
- Bonded-flange drain set to the preslope, flange flush with the membrane; weep holes protected with gravel or a listed weep protector.
- Liquid membrane applied at the manufacturer's specified thickness, with reinforcing fabric at corners and the curb, and up the walls above the shower head elevation where required.
- Curb or curbless transition built with the same system; the finished shower floor must not hold standing water anywhere.
Test: flood the pan for the required period before tile and check the ceiling below.
3. Will the 1/2 in. PEX supply handle a 2.5 gpm rain head plus a handheld, and what else does the shower valve need?
Read the worked answer
Flow and pressure check:
- 25 ft of 1/2 in. PEX from a 3/4 in. trunk is a long, restrictive branch for 2.5 gpm. Run the manufacturer's friction chart for the actual gpm and length, add the fittings, and subtract from the 55 psi static.
- Remember static is not what the shower sees: subtract elevation (0.433 psi per ft of rise to the shower head) and subtract the loss through the valve, the rain head arm, and the handheld diverter.
- Two outlets open at once (rain head plus handheld) can easily double the demand. Size the branch and valve for the combined flow, or specify a diverter that does not allow both at full flow.
- If the residual pressure at the valve falls short, re-pipe the branch in 3/4 in. from the trunk or use a pressure-balanced valve body rated for the flow, not a bigger trim.
Valve requirements:
- A pressure-balancing or thermostatic mixing valve is required at a shower; a two-handle or manually mixed valve is not acceptable on a remodel.
- Limit the maximum delivered hot water to the shower - commonly 120 F by code and always by the anti-scald standard on the valve. Set and verify the rotational limit stop with a thermometer at the shower head.
- Provide access to the valve through a removable panel or from the adjacent closet.
- The handheld slide bar needs blocking behind the tile and a drop-ear elbow or a listed wall supply - plan it before the board goes up.