Journeyman Plumber study materials
Journeyman Plumber study resources

Journeyman Plumber study plan

Journeyman Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Drainage, Waste, and Vent Systems

  • Diagram a full DWV system from a stack out through the building drain, labeling every trap, vent, and fitting by name

  • Calculate proper fixture-unit loads for a branch, a stack, and a building drain using a fixture-unit table you build yourself

  • Explain the difference between a vent stack, stack vent, and relief vent aloud without notes

  • Identify slope requirements for drain pipe sizes from 1-1/4 in through 6 in and state where each applies

Your checkpoint

A hand-drawn DWV riser diagram with fixture-unit totals written at every branch, stack, and building drain

Week 2

Drainage, Waste, and Vent Systems & Plumbing Code and Regulations

  • Solve 20 trap-arm distance and developed-length problems for common fixtures

  • Distinguish wet venting, common venting, and circuit venting by sketching each arrangement

  • Locate and paraphrase the code sections governing vent termination distances from windows, doors, and air intakes

  • Write out the rules for cleanout placement, sizing, and access in your own words

Your checkpoint

A 25-question self-written DWV quiz with answer key and code citations, scored at 90% or better

Week 3

Water Supply and Distribution & Plumbing Code and Regulations

  • Size water supply piping for a two-bath house using both the fixture-unit method and the velocity method, then compare results

  • Compute pressure loss across a run using friction-loss tables and static head for a two-story installation

  • Explain backflow prevention device selection for three different scenarios

  • Summarize the code requirements for water distribution testing, disinfection, and minimum pipe burial depth

Your checkpoint

A one-page water supply sizing worksheet for a sample two-bath house showing pipe sizes, pressure loss, and remaining pressure at the farthest fixture

Week 4

Plan Reading, Math, and System Layout & Drainage, Waste, and Vent Systems

  • Convert between plan scale, actual dimensions, and pipe lengths on at least 10 practice measurements

  • Calculate grade, fall, and invert elevations for a building sewer given two known elevations

  • Compute volume, capacity, and material takeoff quantities for a drainage layout from a dimensioned sketch

  • Re-solve 15 missed DWV questions from Week 1-2 and explain each error in writing

Your checkpoint

A takeoff sheet for a sample drainage layout listing pipe lengths, fitting counts, and invert elevations with all math shown

Week 5

Plumbing Fixtures and Appliances & Fuel Gas Piping and Venting

  • List installation and rough-in dimensions for water closets, lavatories, and tub/shower units

  • Match each fixture type to its trap size, supply connection size, and minimum fixture-unit value

  • Trace a fuel gas line from meter to appliance, sizing each segment by load and length

  • State combustion air, clearances, and venting requirements for a Category I appliance from memory

Your checkpoint

A comparison chart of 12 fixtures and appliances giving trap size, supply size, fixture units, and gas input/connection size

Week 6

Water Heaters & Plumbing Fixtures and Appliances

  • Size a water heater for a 3-bedroom, 2-bath home using first-hour rating and peak-hour demand

  • Identify the components and failure points of a temperature and pressure relief valve and its discharge piping requirements

  • Compare tank, tankless, and heat-pump water heaters on recovery, venting, and installation constraints

  • Describe thermal expansion control and backflow protection for a closed water heater system

Your checkpoint

A written water heater selection memo recommending one unit for a given household, with sizing math, venting plan, and T&P discharge details

Week 7

Safety, Tools, and Jobsite Practices & Plumbing Code and Regulations

  • Build a job-site hazard checklist covering trenching, confined space, and soldering fire watch

  • Name the correct tool for 15 common plumbing tasks and state one safety rule for each

  • Summarize licensing, permit, inspection, and testing obligations under the code for a typical residential job

  • Practice 30 rapid-fire code questions on definitions, administration, and general regulations

Your checkpoint

A permit-and-inspection checklist plus a jobsite hazard checklist you could take to a real job tomorrow

Week 8

Drainage, Waste, and Vent Systems & Water Supply and Distribution & Plumbing Code and Regulations & Plumbing Fixtures and Appliances & Water Heaters & Fuel Gas Piping and Venting & Safety, Tools, and Jobsite Practices & Plan Reading, Math, and System Layout

  • Complete two full-length timed practice exams under test conditions

  • Rank every missed question by domain and re-study the two weakest domains

  • Recite the 20 formulas and code numbers you most often forget, from a self-made flashcard set

  • Review your Week 1-7 deliverables and rework any goal you could not complete cleanly

Your checkpoint

A scored 100-question practice exam with every wrong answer corrected and cited, plus a one-page final review sheet

Milestones

Week 2: Score at least 80% on the self-written DWV quiz and correctly sketch three venting arrangements without notes

Week 4: Complete the drainage takeoff with no arithmetic errors and score at least 85% on a mixed DWV-and-math practice set

Week 6: Produce a code-correct water heater selection memo and pass a 40-question mixed fixtures/gas/water-heater quiz at 80% or better

Week 8: Score at least 80% on both timed full-length practice exams, with no domain below 70%