Applied Information Technology Engineer Examination flashcards
Applied Information Technology Engineer Examination · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Amdahl's law
- The overall speedup from improving a fraction p of a workload by factor s is 1 / ((1 - p) + p/s), so the serial portion caps the achievable gain.
- CPI
- Cycles per instruction, the average number of clock cycles each instruction takes; execution time equals instruction count times CPI times clock cycle time.
- Cache miss penalty
- The extra time to fetch data from a lower memory level after a cache miss; average access time equals hit time plus miss rate times miss penalty.
- Round-robin scheduling
- A preemptive CPU scheduling policy that gives each ready process a fixed time quantum in turn, guaranteeing bounded waiting but adding context-switch overhead.
- Third normal form
- A relation is in 3NF when it is in 2NF and no non-key attribute transitively depends on the primary key, eliminating redundancy that causes update anomalies.
- HAVING clause
- In SQL, HAVING filters groups after GROUP BY and aggregation, whereas WHERE filters individual rows before grouping; HAVING may reference aggregate functions.
- TCP three-way handshake
- Connection setup using SYN, SYN-ACK, and ACK segments, which synchronizes sequence numbers and confirms both endpoints are reachable before data transfer begins.
- Subnet usable hosts
- For a prefix length n, the number of usable host addresses is 2^(32-n) minus 2, subtracting the network and broadcast addresses; a /24 gives 254.
- Hybrid encryption
- A scheme such as TLS that uses asymmetric cryptography to exchange a session key and symmetric cryptography for bulk data, combining key distribution with speed.
- Cost variance
- Earned value minus actual cost; a negative value means the project has spent more than the value earned and is over budget at that point.
- Schedule performance index
- Earned value divided by planned value; a value below 1.0 indicates work is progressing slower than the baseline schedule planned.
- Critical path
- The longest dependency path through a project network; its length sets the minimum project duration, and delays on it directly delay completion.
- Incident versus problem
- An incident is an unplanned service interruption restored as quickly as possible; a problem is its underlying cause, investigated to prevent recurrence.
- Recovery time objective
- The maximum acceptable elapsed time to restore a service after a disaster; it drives redundancy and failover design rather than backup frequency.
- Recovery point objective
- The maximum tolerable amount of data loss expressed as time; it determines how frequently backups or replication must occur.
- Risk transfer
- A risk response that shifts financial impact to a third party, such as insurance or a fixed-price outsourcing contract, without eliminating the risk itself.
- COBIT governance and management
- COBIT separates governance, which evaluates, directs, and monitors, from management, which plans, builds, runs, and monitors activities to deliver IT objectives.
- Estimate at completion
- A forecast of total project cost; when current cost performance persists, it approximates budget at completion divided by the cost performance index.
- Porter's five forces
- An industry attractiveness model covering rivalry, new entrants, substitutes, buyer power, and supplier power; stronger forces compress average industry profitability.
- Generic strategies
- Porter's three positions-cost leadership, differentiation, and focus on a niche-each requiring a distinct value chain; lacking one leaves a firm stuck in the middle.
- BCG matrix
- A portfolio tool plotting business units by market growth and relative share into stars, cash cows, question marks, and dogs to guide investment allocation.
- Zachman framework
- An enterprise architecture taxonomy that classifies artifacts by stakeholder perspective and by interrogatives such as what, how, where, who, when, and why.
- TOGAF ADM
- The Architecture Development Method, an iterative cycle from architecture vision through business, information systems, and technology architecture to migration planning and change management.
- Net present value
- The sum of future cash flows discounted at the cost of capital minus the initial investment; a positive NPV means the investment adds value.
- Internal rate of return
- The discount rate at which a project's net present value equals zero; a project is acceptable when its IRR exceeds the required rate of return.
- Disruptive innovation
- An innovation that initially underperforms mainstream offerings on established metrics but wins on cost, simplicity, or access, eventually displacing incumbents.
- Run-grow-transform portfolio
- A classification of IT investment into keeping operations running, growing the business, and transforming it, used to balance spending against strategic objectives.
- Copyright versus patent
- Copyright protects the expression of software, such as source code, while a patent protects a novel and inventive technical method for a limited term.
- Trade secret protection
- Protection of confidential business information such as algorithms or formulas that has no registration or expiry, provided reasonable secrecy measures are maintained.
- Digital signature
- A value created with the sender's private key and verified with the public key, providing authenticity, integrity, and non-repudiation but not confidentiality.
- Data minimization
- A privacy principle requiring collection and retention of only personal data necessary for a specified purpose, limiting exposure if a breach occurs.
- Fixed-price contract
- An agreement where the vendor delivers for a set price regardless of actual cost, transferring cost risk to the vendor when requirements are stable.