PSRA Level 1 Exam study materials
PSRA Level 1 Exam study resources

PSRA Level 1 Exam study plan

PSRA Level 1 Exam · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Radio Frequency Fundamentals and Spectrum Concepts

  • Explain decibel relationships (dBm, dBW, dBd, dBi) and convert between them without a calculator error in 20 practice problems.

  • Describe modulation schemes used in public safety LMR (FM, C4FM, P25 phase 1/2 variants) and state occupied bandwidth for each.

  • Distinguish simplex, half-duplex, and full-duplex operation and identify which is used in a typical conventional repeater talkgroup.

  • Compute free-space path loss and link budget for a sample 700 MHz and 150 MHz scenario, comparing results.

Your checkpoint

A one-page formula sheet plus a worked link-budget example for VHF and 700 MHz showing at least 6 dB difference in FSPL.

Week 2

Public Safety Land Mobile Radio Systems and Architectures

  • Diagram a conventional repeater system and a trunked simulcast system, labeling each component from subscriber to console.

  • Compare P25 Phase 1 FDMA and Phase 2 TDMA in terms of channel capacity, vocoder, and migration path.

  • Identify the roles of RFSS, site controller, comparator, and voter in a simulcast network.

  • Trace a call from a portable through a site to a dispatcher console and list every interface it crosses.

Your checkpoint

A hand-drawn or digital architecture diagram of a 4-site simulcast P25 system with a labeled call-flow narrative of at least 300 words.

Week 3

Radio Frequency Fundamentals and Spectrum Concepts & Public Safety Land Mobile Radio Systems and Architectures

  • Explain co-channel and adjacent-channel interference and describe how frequency reuse and site separation mitigate each.

  • Calculate a reuse pattern's co-channel interference ratio (D/R) for a sample cluster size and interpret the result.

  • Differentiate analog, P25 conventional, P25 trunked, and DMR systems in a comparison table.

  • Describe how a trunked system's control channel works and what happens when a site loses it.

Your checkpoint

A comparison matrix covering 4 system types across 8 attributes (capacity, spectrum efficiency, encryption, roaming, etc.).

Week 4

Radio Site, Coverage, and RF Propagation Analysis

  • Apply the Okumura-Hata and free-space models to predict coverage for an urban and rural site, noting the limits of each model.

  • Explain Fresnel zone clearance and compute the first Fresnel zone radius at mid-path for a given link.

  • Identify terrain, clutter, and building penetration effects on in-building coverage and recommend mitigation.

  • Describe how antenna height, gain, downtilt, and pattern shape affect coverage footprint and interference.

Your checkpoint

A coverage prediction worksheet for a hypothetical 5-site county system with predicted radius, terrain notes, and at least 3 risks identified.

Week 5

Interoperability, Standards, and National Frameworks & Licensing, Frequency Coordination, and Regulatory Compliance

  • Map the SAFECOM Interoperability Continuum's five lanes to concrete actions a radio system manager can take.

  • Explain the National Interoperability Field Operations Guide (NIFOG) and how national interoperability channels are used during a mutual-aid event.

  • Describe the FCC licensing process for public safety land mobile (Part 90) including application, coordination, and construction deadlines.

  • Differentiate frequency coordination bodies and explain the role of the regional planning committee in 700/800 MHz.

Your checkpoint

A one-page mutual-aid communications plan for a fictional county describing which interoperability channels would be used and the licensing basis for each.

Week 6

Network Monitoring, Diagnostics, and Performance Analysis

  • List the key performance indicators for an LMR system (channel busy, call setup time, dropped calls, RSSI, BER) and state a normal range for each.

  • Describe how to use a service monitor and a subscriber diagnostic tool to isolate a coverage complaint.

  • Interpret a system performance report and identify the top 3 likely root causes of degraded performance.

  • Explain the difference between a site alarm, a network management alarm, and a subscriber-level fault.

Your checkpoint

A troubleshooting decision tree for 'user reports no coverage in sector 3' with at least 6 branches and a documented test at each.

Week 7

Cybersecurity and Communications Security for Public Safety Radio & Incident Support, Operational Procedures, and Documentation

  • Explain AES-256 and DES-OFB encryption in P25 and describe key management, OTAR, and key fill procedures.

  • Identify common threats to public safety radio (jamming, spoofing, unauthorized key fill, console compromise) and describe a control for each.

  • Describe the ICS communications unit leader role and the ICS 205 incident radio communications plan.

  • Draft an after-action documentation set for a simulated event including a timeline and lessons learned.

Your checkpoint

A completed ICS 205 form for a simulated multi-agency event plus a 200-word security note identifying 3 threats and mitigations.

Week 8

Emerging Technologies and System Modernization & Interoperability, Standards, and National Frameworks

  • Compare P25, LTE/FirstNet, and hybrid LMR-broadband approaches for mission-critical voice and data.

  • Explain the role of Mission Critical Push-to-Talk (MCPTT) standards and how they interface with LMR.

  • Describe emerging trends: narrowbanding, 700 MHz band planning, encryption modernization, and GPS-based location services.

  • Synthesize the 8-week material into a 20-question self-test and score at least 80%.

Your checkpoint

A written 1-page modernization recommendation for a fictional agency choosing between LMR replacement and a hybrid broadband approach, with 3 decision criteria.

Milestones

Week 2: Can draw a P25 simulcast architecture from memory and label at least 8 components correctly.

Week 4: Can compute FSPL and Fresnel radius for a given link and state whether the link is viable.

Week 6: Can diagnose a coverage complaint using a documented decision tree and cite the KPI that confirms the diagnosis.

Week 8: Score at least 80% on a self-authored 20-question test spanning all 9 domains, with no domain below 60%.